Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17208A818 + (21:14:32, 8 January 2025)
- L-80-190, Advises That Final Deficiency Rept Re Diesel Generator Control Panels Will Be Delayed Until 800731 + (21:14:33, 8 January 2025)
- 05000335/LER-1980-030, Forwards LER 80-030/03L-0 + (21:14:35, 8 January 2025)
- 05000335/LER-1980-025, Forwards LER 80-025/09X-1 + (21:14:37, 8 January 2025)
- 05000335/LER-1980-026-03, /03L-0:on 800530,during Normal Power Operations, Noted That 31-day Fire Station Insp Required by Tech Spec Had Been Exceeded.Caused by Personnel Inadvertently Overlooking Insp + (21:14:39, 8 January 2025)
- 05000335/LER-1980-026, Forwards LER 80-026/03L-0 + (21:14:41, 8 January 2025)
- 05000335/LER-1980-028, Forwards LER 80-028/03L-0 + (21:14:42, 8 January 2025)
- ML17208A806 + (21:14:43, 8 January 2025)
- L-80-203, Advises NRC That NUREG-0578 Requirement to Measure Chlorides & Dissolved Gases in RCS Following Accident Is Excessive & Involves Unnecessary Personnel Exposure to Radiation. Requests That NRC Reconsider Position + (21:14:45, 8 January 2025)
- ML17208A804 + (21:14:45, 8 January 2025)
- ML17208A802 + (21:14:48, 8 January 2025)
- ML17208A801 + (21:14:49, 8 January 2025)
- ML17208A799 + (21:14:50, 8 January 2025)
- IR 05000335/1980012 + (21:14:51, 8 January 2025)
- ML17208A795 + (21:14:53, 8 January 2025)
- L-80-198, Responds to IE Bulletin 80-06, Engineered Safety Feature Reset Controls. Sys Identified as Returning to Normal Position After Reset.Safety Injection Tank Isolation & Check Valve leak-off Valves Returned to Normal Position + (21:14:54, 8 January 2025)
- L-80-212, Forwards Explanation of Selection of Undervoltage Relay & Setpoint, in Response to NRC 800529 Request for Addl Info Re Grid Voltage.Discussion of Consequences of Spurious Actuation of Relays Also Encl + (21:14:57, 8 January 2025)
- ML17208A791 + (21:14:59, 8 January 2025)
- ML17208A788 + (21:15:00, 8 January 2025)
- ML17208A786 + (21:15:01, 8 January 2025)
- IR 05000389/1980006 + (21:15:04, 8 January 2025)
- ML17208A780 + (21:15:06, 8 January 2025)
- IR 05000335/1980010 + (21:15:07, 8 January 2025)
- ML17208A776 + (21:15:09, 8 January 2025)
- ML17208A775 + (21:15:10, 8 January 2025)
- L-80-177, Responds to NRC Re Violations Noted in IE Insp Rept 50-335/80-10.Corrective Actions:Examiner Passed Eye Exam & Schedule for Recertification of Vision Tests Established + (21:15:11, 8 January 2025)
- L-80-204, Requests NRC Approval of Encl Plans to Implement 810101 Requirements of Lessons Learned Task Force Item 2.1.8.b. Licensee Will Install Four SPING-4 Samplers by 810101 to Monitor Normal & High Range Noble Gas at Vent Stack + (21:15:13, 8 January 2025)
- ML17208A772 + (21:15:13, 8 January 2025)
- ML17208A770 + (21:15:16, 8 January 2025)
- ML17208A767 + (21:15:17, 8 January 2025)
- ML17208A769 + (21:15:17, 8 January 2025)
- ML17208A763 + (21:15:18, 8 January 2025)
- ML17208A766 + (21:15:18, 8 January 2025)
- 05000335/LER-1980-022, Forwards LER 80-022/03L-0 + (21:15:22, 8 January 2025)
- ML17208A758 + (21:15:23, 8 January 2025)
- ML17208A755 + (21:15:24, 8 January 2025)
- IR 05000335/1980013 + (21:15:26, 8 January 2025)
- ML17208A752 + (21:15:27, 8 January 2025)
- ML17208A749 + (21:15:28, 8 January 2025)
- ML17208A747 + (21:15:29, 8 January 2025)
- ML17208A746 + (21:15:29, 8 January 2025)
- L-80-197, Application for Amend to App a of License DPR-67,modifying Definition of Operability & Applicability of Limiting Conditions for Operation to Coincide W/Words in STS Per NRC + (21:15:30, 8 January 2025)
- L-80-178, Responds to IE Bulletin 80-05.Existing Measures for Vacuum Protection Are Adequate & No Further Mods Are Required + (21:15:38, 8 January 2025)
- L-80-179, Forwards Response to IE Bulletin 80-12.Failure of Any Single Active Component During Decay Heat Removal Sys Operation Will Not Result in Loss of Cooling + (21:15:40, 8 January 2025)
- L-80-194, Forwards Safeguards Contingency Plan,Revision 1,in Response to NRC 800418 Request for Addl Info.Revision Withheld (Ref 10CFR2.790) + (21:15:42, 8 January 2025)
- ML17208A737 + (21:15:44, 8 January 2025)
- L-80-175, Discusses Main Steam Line Break Analysis.Results Show That Peak Containment Pressure Is Not Influenced by Assumed Addition of Auxiliary Feedwater Ruptured Steam Generator. Forwards Assumptions Used in Analysis + (21:15:45, 8 January 2025)
- L-80-192, Forwards Parts a & B of Info Requested in Reg Guide 9.2.Info Consists of Sec Prospectus,Annual Rept,Rate Schedules, Interchange Agreements,Spinning & Installed Reserve Info & Maint Schedules.Info Available in Central Files + (21:15:47, 8 January 2025)
- 05000335/LER-1980-023, Forwards LER 80-023/03L-0 + (21:15:49, 8 January 2025)
- 05000335/LER-1980-024-03, /03L-0:on 800516,while Shut Down for Refueling, Periodic Test of Engineered Safety Features Showed 10 Diesel Generators Load Sequence Timers Were Out of Tolerance.Caused by Setpoint Drift.Maladjusted Relays Caused Other Prob + (21:15:51, 8 January 2025)
- 05000335/LER-1980-024, Forwards LER 80-024/03L-0 + (21:15:53, 8 January 2025)
- IR 05000335/1980008 + (21:15:54, 8 January 2025)