Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-81-340, Responds to NRC Re Violations Noted in IE Insp Rept 50-335/81-14.No Proprietary Info.Corrective Actions: Double Posting on Solid Surface Implemented in Areas Where Postings Can Be Removed + (20:51:50, 8 January 2025)
- ML17212A582 + (20:51:52, 8 January 2025)
- ML17212A580 + (20:51:53, 8 January 2025)
- ML17212A578 + (20:51:54, 8 January 2025)
- L-81-325, Forwards Public Version of Revision 9 to Radiological Emergency Plan + (20:51:56, 8 January 2025)
- L-81-364, Forwards Const/Startup Progress Update for Jul 1981 + (20:51:57, 8 January 2025)
- ML17212A573 + (20:52:00, 8 January 2025)
- ML17212A571 + (20:52:01, 8 January 2025)
- ML17212A569 + (20:52:03, 8 January 2025)
- ML17212A551 + (20:52:04, 8 January 2025)
- L-81-363, Application for Amend to License DPR-67 to Add Addl Conservatism Re Incore Detector Operability Beyond That Provided in 810813 Original Request for Amend + (20:52:06, 8 January 2025)
- ML17212A550 + (20:52:06, 8 January 2025)
- L-81-359, Forwards Response to 810609 Request for Addl Info Re Fsar. Response Will Be Incorporated in Future FSAR Amend + (20:52:08, 8 January 2025)
- ML17212A532 + (20:52:10, 8 January 2025)
- ML17212A531 + (20:52:10, 8 January 2025)
- L-81-351, Forwards Amend 5 to FSAR Including Responses to NUREG-0737, Questions 220.1-220.37,420.1-420.3,420.6-420.13 & 420.15- 420.55 + (20:52:11, 8 January 2025)
- ML17212A530 + (20:52:11, 8 January 2025)
- ML17212A522 + (20:52:14, 8 January 2025)
- L-81-347, Forwards Description of Design & Results of Analyses of Reactor Coolant Gas Vent Sys,In Response to NUREG-0737,Item II.B.1.Development of Operating Procedures Postponed Until Design Approved + (20:52:15, 8 January 2025)
- L-81-354, Application to Amend License DPR-67,changing Tech Specs 3.3.3.2 a & B to Allow Operation W/Reduced Number of Incore Detectors Operable Until Oct 1981 Refueling outage.C-E Analysis Withheld (Ref 10CFR 2.790) + (20:52:17, 8 January 2025)
- ML17212A517 + (20:52:17, 8 January 2025)
- L-81-355, Forwards Response to 810428 Question 11 Re Topical Rept CEN-126(F).Requests Expeditious Review of 801114 Stretch Power Application.Response Withheld (Ref 10CFR2.790) + (20:52:20, 8 January 2025)
- ML17212A513 + (20:52:20, 8 January 2025)
- L-81-338, Forwards Response to 801222 Generic Ltr Re Control of Heavy Loads.Guidelines Published in NUREG-0612, Control of Heavy Loads, Addressed.Review Ongoing.Final Rept Will Be Submitted by 810930.Diagrams & Tables Encl + (20:52:23, 8 January 2025)
- ML17212A508 + (20:52:23, 8 January 2025)
- L-81-344, Forwards Revised Comparability of St Lucie Site & Liquid Pathway Generic Study from Standpoint of Liquid Pathway, in Response to 810728 Telcon Request for Addl Info + (20:52:25, 8 January 2025)
- L-81-333, Application for Amend to License DPR-67 to Alleviate Undesirable Identified Primary Leakage Resulting from Closure of Power Operated Relief Valve Block Valve V-1403 + (20:52:27, 8 January 2025)
- ML17212A501 + (20:52:27, 8 January 2025)
- ML17212A496 + (20:52:30, 8 January 2025)
- ML17212A494 + (20:52:31, 8 January 2025)
- ML17212A493 + (20:52:32, 8 January 2025)
- ML17212A492 + (20:52:33, 8 January 2025)
- ML17212A487 + (20:52:34, 8 January 2025)
- ML17212A484 + (20:52:35, 8 January 2025)
- ML17212A475 + (20:52:36, 8 January 2025)
- ML17212A466 + (20:52:37, 8 January 2025)
- ML17212A458 + (20:52:38, 8 January 2025)
- ML17212A457 + (20:52:39, 8 January 2025)
- ML17212A455 + (20:52:40, 8 January 2025)
- ML17212A448 + (20:52:41, 8 January 2025)
- L-81-319, Forwards Comparability of St Lucie Site & Liquid Pathway Generic Study from Standpoint of Liquid Pathway, in Response to 810505 Request.St Lucie Site Not Unique in Liquid Pathway Contribution to Risk + (20:52:42, 8 January 2025)
- L-81-318, Advises That Util Agreed to Provide Justification for Position That Steam Generator Water Hammer Testing Need Not Be Performed on Facility.Preoperational Test Program Will Verify Adequacy of Design + (20:52:43, 8 January 2025)
- ML17212A438 + (20:52:49, 8 January 2025)
- ML17212A439 + (20:52:49, 8 January 2025)
- ML17212A436 + (20:52:50, 8 January 2025)
- ML17212A434 + (20:52:51, 8 January 2025)
- ML17212A433 + (20:52:52, 8 January 2025)
- ML17212A431 + (20:52:53, 8 January 2025)
- ML17212A429 + (20:52:54, 8 January 2025)
- L-81-303, Forwards Const/Startup Progress Update for June 1981 + (20:52:55, 8 January 2025)
- L-81-315, Responds to 810623 Request for Payment of 801031 Amend Request Per 800702 TMI Lessons Learned Category a Request + (20:52:56, 8 January 2025)
- ML17212A423 + (20:52:58, 8 January 2025)