JIUL SO ~est
Florida Power and Light Company
ATTN:
Dr.
R.
E. Uhrig, Vice President
Advanced
Systems
and Technology
P. 0.
Box 529100
Miami,
FL
33152
Gentlemen:
Subject:
Report
No
0-335
-
and 50-389/81-11
~I
'<ffgq'"
G 3 l 1983 m -9 .
Us% NclfARaaaAragg
RMHIQN
(4
This 'refers to the routine s'afety inspection
conducted
by Mr. S.
A. Elrod of this
office on Jurie ll - July 10,
1981, of activities author ized
by
NRC Operating
License
No.
DPR-67 and Construction
Permit
No.
CPPR-144 for the St.
Lucie Units
1
and
2 facility and to the discussion
of our findings held with Mr. C.
M. Wethy
and
B. J.
Escue,
Plant Managers,
at the conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Within the
scope of this inspection,
no violations or deviations
were disclosed.
We have
examined actions
you have
taken with regard to previously identified
enforcement matters
and unresolved
items.
The status
of these
items is discussed
in the enclosed
report.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter and the enclosed
report will be placed in the
NRC's Public Document
Room.
If the report contains
any information that you believe to
be exempt from
disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you:
(a) notify this
office by telephone within ten days
from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days
from the date of this letter
a written application to this office to
withhold such information.
If your receipt of this letter
has
been
delayed
such
that less
than
seven
days are available for your review, please notify this
office promptly so that
a
new due date
may
be established.
Consistent with
section 2.790(b)(1),
such application must
be accompanied
by an affidavit
executed
by the owner of the information which identifies the document or part
thereof sought to be withheld, and
a full statement
of the reasons
on the basis
of which it is claimed that the information should
be withheld from public
disclosure.
This section further requires
the statement
to address
with
specificity the considerations
listed in 10 CFR 2.790(b)(4).
The information
sought to
be withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not hear from you in this regard within the
specific'd periods
noted above,
the report will be placed in the Public Document
Room.
,'I090i0074
8i073~0l
ADOCN OS000335
i
PPRr
V
0
('l
C
I
II
)f4,"~~Ac.
~ s .."
'>~ e. v ~
W g)
h
/
Florida Power and Light Company
JUL So ties~
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Enclosure:
Inspection
Report Nos. 50-335/81-16
and 50-389/81-11
cc w/encl:
C.
H. Wethy, Plant Hanager
N.
Weems, Assistant
gA
Construction
Hanager
B. J.
Escue,
Plant Hanager
bcc w/encl:
NRC Resident
Inspector
W. Hiller, IE:Region II
Central
Files
Local Public Document
Room
Washington Public Document
Room
Nuclear Safety Information Center
Technical
Information Center
Document
Hanagement
Branch
State of Florida
R.
C. Lewis, Director
Division of Resident
and
Reactor Project Inspection
0
RII~
S lroKdt
7/2,q /81
HCDance
7'81
R II+
KLandis
7/Q/81
RII
PK
logg
7/ $ 81
~
~
I
O.