ML17212A578

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-335/81-16 & 50-389/81-11 on 810611-0710.No Noncompliance Noted
ML17212A578
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/30/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17212A579 List:
References
NUDOCS 8109010074
Download: ML17212A578 (4)


See also: IR 05000335/1981016

Text

JIUL SO ~est

Florida Power and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced

Systems

and Technology

P. 0.

Box 529100

Miami,

FL

33152

Gentlemen:

Subject:

Report

No

0-335

-

and 50-389/81-11

~I

'<ffgq'"

G 3 l 1983 m -9 .

Us% NclfARaaaAragg

RMHIQN

(4

This 'refers to the routine s'afety inspection

conducted

by Mr. S.

A. Elrod of this

office on Jurie ll - July 10,

1981, of activities author ized

by

NRC Operating

License

No.

DPR-67 and Construction

Permit

No.

CPPR-144 for the St.

Lucie Units

1

and

2 facility and to the discussion

of our findings held with Mr. C.

M. Wethy

and

B. J.

Escue,

Plant Managers,

at the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Within the

scope of this inspection,

no violations or deviations

were disclosed.

We have

examined actions

you have

taken with regard to previously identified

enforcement matters

and unresolved

items.

The status

of these

items is discussed

in the enclosed

report.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of this

letter and the enclosed

report will be placed in the

NRC's Public Document

Room.

If the report contains

any information that you believe to

be exempt from

disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you:

(a) notify this

office by telephone within ten days

from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days

from the date of this letter

a written application to this office to

withhold such information.

If your receipt of this letter

has

been

delayed

such

that less

than

seven

days are available for your review, please notify this

office promptly so that

a

new due date

may

be established.

Consistent with

section 2.790(b)(1),

such application must

be accompanied

by an affidavit

executed

by the owner of the information which identifies the document or part

thereof sought to be withheld, and

a full statement

of the reasons

on the basis

of which it is claimed that the information should

be withheld from public

disclosure.

This section further requires

the statement

to address

with

specificity the considerations

listed in 10 CFR 2.790(b)(4).

The information

sought to

be withheld shall

be incorporated

as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within the

specific'd periods

noted above,

the report will be placed in the Public Document

Room.

,'I090i0074

8i073~0l

PDR

ADOCN OS000335

i

PPRr

V

0

('l

C

I

II

)f4,"~~Ac.

~ s .."

'>~ e. v ~

W g)

h

/

Florida Power and Light Company

JUL So ties~

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Enclosure:

Inspection

Report Nos. 50-335/81-16

and 50-389/81-11

cc w/encl:

C.

H. Wethy, Plant Hanager

N.

Weems, Assistant

gA

Construction

Hanager

B. J.

Escue,

Plant Hanager

bcc w/encl:

NRC Resident

Inspector

W. Hiller, IE:Region II

Central

Files

Local Public Document

Room

Washington Public Document

Room

Nuclear Safety Information Center

Technical

Information Center

Document

Hanagement

Branch

State of Florida

R.

C. Lewis, Director

Division of Resident

and

Reactor Project Inspection

0

RII~

S lroKdt

7/2,q /81

HCDance

7'81

R II+

KLandis

7/Q/81

RII

PK

logg

7/ $ 81

~

~

I

O.