L-81-303, Forwards Const/Startup Progress Update for June 1981
| ML17212A427 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 07/21/1981 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| L-81-303, NUDOCS 8107280412 | |
| Download: ML17212A427 (5) | |
Text
REGULATOR FORMATION DISTRIBUTION S
.EM k
ACCESSION NBR!8107280gi2'.
DOC ~ DATK!'f/07/2f NOTARIZKDI>>
FACIL>>:50 389 St. Lucie'Plant.~
Unit 2~, Florida Power 8 Ligh "AUTH'eNAME'UTHOR AFFILIATION UHRIGgR ~
ED
'lor.ida: Power 8 Light C'o.
RECIP ~ NAME)
RECIPIENT AFFIL'IAT'ION EISENHUT'pDiG ~
Division of Licensing (RIDS)
NOt Co ~ 'OCKE>>Tl N.
05000389
SUBJECT:
- For wards const/startup:
pr ogr ess update for June 1
DISTRIBUTION CODE>>e B001S COPIES RECKIVEDoL>>TR
'NCL TITLE::" PSAR/FSAR AMDTS'nd Rel ated'orrespondence NOTES':
9Bl;'IZE
~:
RECIPIENT ID CODE/NAMEi ACT'ION:
A/5>> LICKNSNG LIC BR
>3>> LA INTERNAL: ACCID EVAL'R26'CHEM ENG BR'f<<
CORK, PERF BR 10.
EMRG PRP DEV 35>>
EQUIP QUAL BR13>>
GEOSCIENCES 28 HYO/GEO BR 30.
I8 El 06 LIC>> QUAL BR 32',
i>>>>lECH ENG BR'B NRC", PDR<
02'P LIC BR
'34 PROC/'TST REV 20.
S BR22>>
R FILE 0 fi G
BR25~
COPIES LTTR ENCL 0
1 0
1 1
1 1
1 1
1 1
3 3
2 2
2-.
2 3
3 f
1 1
1 1-1 1
1 1
~
1 1-1 1
1 1
RECIPIENT ID CODE,"/NAME'.
04" AUX SYS BR 27 CONT SYS BR 09 EFF TR SYS BR12 EMRG PRP'IC 36 FEMA REP DIV 39 HUM'FACT, ENG 40 I8C SYS BR 16" L'IC" GUID BR 33 MATL( ENG BR 17 MPA OELD POWER SYS'R 19 QA>> BR'1.
REAC) SYS BR 23>>
. SI,T: ANAL>> BR 24 COPIES'>>TTR>> ENCL>>
1-0'>>
1 1'
.1-1 3'>>
1 1
1 1
f>>
1 f>>
1 fi 1
0.
1 0,
1 f>>
1 1 ~
1 1
1 1
OS>>
16 16 1
1 LPDR'MT'I S
03>>
1 fc 1
f>>
TO>>TAL>> NUMBER>> OF COPIES'EQUIRED LTTR 62 ENCL'7
II 1
V
~
~
gtf y I
Ivf
~
4 PWw of tttfftttVI I
k V
$ 4 fl 4 4
~gibq IA FLORIDAPOWER & LIGHTCOMPANY July 21, 1981 L-81-303 Office of Nuclear Reactor Regulation Attention:
Mr. Darrell G. Eisenhut, Director Division of Licensing U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Eisenhut:
Re:
St. Lucie Unit 2 Docket No.
50-389 Construction Start-u Pro ress U date 1
Attached is a report of the construction/start-up progress for St. Lucie Unit 2 for June, 1981.
If you have any questions regarding the attached information, or would like additional information from Florida Power 8
Light Company (FPL), please feel free to call me or Mr. W. B. Derrickson, the St. Lucie Unit-2 Project General Manager (305 552-4659).
Very truly yours, Rober t E. Uhri g Vice President Advanced Systems 8 Technology REU/TCG/bs Attachment cc:
Wil'liam H. Lovelace, Office of Management 8 Program Analysis U. S. Nuclear Regulatory Commission J.
P. O'Reilly, Director, Region II Harold F. Reis, Esquire Si072804i2 8i072i PDR ADOCK 05000389 R
~o~i gr
)
PEOPLE... SERVING PEOPLE
FLORIDA POWER 6 LIGHT COMPANY ST.
LUCIE UNIT 2 CONSTRUCTION/STARTUP MONTHLY STATUS REPORT CURRENT PERIOD:
June 1981 SCHEDULE STATUS:
Overall Project Construction/Start-up Critical Path Variance Target Fuel Load Date 78%
71.6 7 ~ 7 10/29/82
>>j MAJOR WORK HIGHLIGHTS:
l.
2.
3.
4.
5.
6.
7.
8.
Complete disassembly of Main Transformer 2A Set Intake Cooling Water Pump Motor 2B Complete Fuel Transfer Tube 'Shield Wall Cmplt Inst. of 135 (218 total) spools for Ocean Discharge Turnover Intake Cathodic Protection System 65B to Test Turnover 125V D.C. system 62 to Test Turnover Condensate Storage and Transfer System 18C to Test Turnover 4.16 KV Electrical System 58 to Test SCHEDULED
'7/03/81 5/20/81 6/30/81 6/30/81 6/26/81 6/06/81 6/05/81 6/01/81 ACTUAL 7/03/81 6/02/81 6/16/81 6/30/81 6/25/81 6/22/81 6/25/81 6/02/81 BULK UANTITY STATUS:
CURRENT TOTAL MONTH TO DATE
'UANTITY PHYSICAL QUANTITY PERCENT AVERAGE INSTAL. RATE (QTY/MO) 10% - 90%
6/81 TO DATE FORECASTED
- -.'oncrete (cy)
Large Bore Piping (lf)
Small Bore Piping (lf)
Instrument Tubing (ea)
Large Bore Hangers (tn)
Whipping Restraints (lf)
Cable Tray (lf)
Conduit (Exp.(
Emb
( U/D)(lf)
Lighting Conduit (lf)
Power Cable Pull (lf)
Control Cable Pull (Inc.
Comm. ) (lf)
Signal Cable Pull (lf)
Terms Pwr Hi (ea)
Terms Pwr Lo (ea)
Terms Control (ea)
Terms Signal (ea) 128,219
- 68,051 57,888 49,117 2,558 396 35,140 264,341
'85,289
.360,890 r
1, 111,334 269,714 284 4,351 23,671 3,158 47.4 28.4 56.0 55.8 32.2 6.1 76,430 42,962 26 700 2,050 393 Essentially Complete 81.6 1,454 59.1 3,274 31,3 930 54.9 45 68.1 30 Essentially Complete 58.2
.13,299 82.3 1,822 52.9 30('247 2,145 4,435 4,330 100 30 7,130 2,425 32(020 125,815 43,810 30 595 3,255 1,955 4,400 4(155 135 25 7,700 2,060'5,215 90,790 44,455 25 315 3,480 3(535 START-UP PROGRAM STATUS:
SCHEDULED TO DATE COMPLETED TO DATE SCHEDULE FOR MONTH CURRENT MONTH TOTAL
~RE UIRED Preoperational Test Proced.
System Turnovers (PTO)
System Turnovers (CTO)
Preoperational Tests Performed 194 95 13 7
183 78
,8 3
15 16 5
4 16 9
3 0
198 170 158 198 NOTE:
Essentially complete means the commodity is past the 90%
point and is in the clean up final stage.
'I t