L-81-364, Forwards Const/Startup Progress Update for Jul 1981
| ML17212A574 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/24/1981 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| L-81-364, NUDOCS 8108310338 | |
| Download: ML17212A574 (5) | |
Text
REGULA'RY INFORMATIO>>V DISTRIBUTI
~
SYSTE'h (RIDS)
ACCESSIOV NBR: 81083103I38 DOC ~ DATE!: 81/08/24 iVOTARIZED:
NO FACIL>>:50 389 St. Lucie Plant~. Unit 2<, Flor ida Power 8 Light'o.,
AUTH'AME'UTHOR AFFILIATIION UHRIGE R ~ E"~
Florlida Power 8 Light Co, RECIPe VAMEI RECXPZENT AFFIL>>IATION EKSE>>VHUTt<D,G, Division of Licensing
SUBJECT:
- For wards con>>st/startup, progress update for Jul 1981
~
DISTR'IBUTION CODEI~
8001S COPIFS RECEIVED L>>TR "ENCL SIZE' T'ITLEI PSAR'/PEAR A>>>>DTS snd Re::letsd Correspondence
>>VOTE S DOCKEiT' 05000389.
RECIPIENT ID>> CODE/NAMEI ACT'ION:
A/Di LiICEiVSNG L>>IC>> BR ¹3 LA INTERNALi: ACCID EiVAL BR26'HEM EVG BR 11 CORE PERF BR 10, EQUIP. QUAL BR>>1 3>>
HUH" FACT ENG 40.
I8C>> SYS BR 16'E/EPDB>>35 L>>IC GUID BR 33>>
NATL EVG BR 17 MPA'P LI C BR>>
34 PROC/TST REV 20.
S BR22' PIJ E'1 ST UCT ENG BRP5>>
COPIES LTTR ENCL>>
1 0
0 1
1 1
1 1
1 3
1 1
1 1
1 1
1 1
1 0
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME.
L>>I C BR ¹3 BC
- NERSESRV, 04 AUX SYS BR 27 CO>>VT SYS BR 09 EFF TR SYS BR12 GEOSCIENCES 28 HYD/GEO" BR 30 I8E 06'E/EPLB36 LiIC QUAL'R 32 SECH ENG BR 18 OELD POWER SYS BR 19 QA BR 21 REAC SYS BR 2'3 SIT'NAL>> BR 24 COPIE6 L>>TTR: ENCL~
1 0
1 1
1 1
1 1
1 2
2' 2
3 3
1 1
1 1
1 0
1 1
1 ~
1 1
1 1
EXTERNAL>>:
ACRS LPDR
>>VS I C 41
~
03>>
05>>
16 16 1
1 1
>>VTIS 1
1 1
1 1
1 TOTAI. NU4lBER>> OF COPIES'EQUIRED; LiTTR 62 ENCL>>
57
gV A
r t
0
'I}
0 II
August 24, 1981 L-81-364 Office of Nuclear Reactor Regulation Attention:
Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Eisenhut:
Re:
St. Lucie Unit 2 Docket No. 50-389 Construction/Start-u Pro ress U date
/
i iiiu 2 3 1901 ~
ihip lccLQR ~YUKON gpog~s Attached is a report of the construction/start-up progress for St.
Lucie Unit 2 for July, 1981.
If you have any questions regarding the attached information, or would like additional information from Florida Power 8 Light Company (FPL), please feel free to call me or Mr. W. S. Derrickson, the St. Lucie Unit 2 Project General Manager (305) 552-4659.
Very ly yours, Robert E. Uhrig Vice President Advanced
- Systems, dm Technology REU/TCG/ah Attachment cc:
William H. Lovelace, Office of Management 5 Program Analysis U.
S. Nuclear Regulatory Commission J.
P. O'Rei lly, Director, Region II Harold F. Reis, Esquire Si083i0338 SiOSQ4 PDR ADOCK 05000389 R
FLORIDA POWER
& LIGHT COMPANY ST
~
LUCIE UNIT 2 CONSTRUCTXON/STARTUP MONTHLY STATUS REPORT CURRENT PERIOD:
July 1981 SCHEDULE STATUS:
Overall Project 76.7%
Construction/Start-up, Critical Path Variance
-11.0 Target Fue'oad Date 10/29/82 MAJOR WORK HIGHLIGHTS:
SCHEDULED ACTUAL 1.
Set HVAC cooling unit 2HVS-1C at elevation 62 in RCB 2.
Start breaching of the Unit 1/2 Discharge Canal Dike 3.
Completed grouting of diesel generators 4.
Completed turnover of system 66 Start Up transformers 5.
Completed pl.
N9 (208 c.y.) for RCB ext. shield bldg.
dome conc.
6.
Completed turnover of system 61B - 120V AC vital power 7.
Installed 160 of 219, 192" p Ocean Discharge spools 8.
Completed pl.
N10 (208 c.y.) for RCB-ext. shield bldg.
dome conc.
12/02/81 07/22/81 07/29/81 07/17/81 08/24/81 07/20/81
'07/31/81 68/29/81 07/16/81 07/06/Sl 07/16/81 07/16/81 07/27/Sl 07/27/81 07/31/81 07/31/81 BULK QUANTITY STATUS:
CURRENT TOTAL MONTH TO DATE QUANTITY QUANTITY QUANTITY PERCENT AVERAGE MONTHLY INSTAL. RATE (QTY/MO) 10% - 90%
7/81 TO DATE FORECASTED Concrete (cy)
Large Bore Piping (lf)
Small Bore Pip'ng (lf)
Instrument Tubing (lf)
Large Bore Hangers (ea)
Whipp'ng Restraints (tn )
Cable Tray (lf)
Condu' (Exp., En>.,
U/D)(lf
~ ighting Condu't (lf)
Power Cable Pull (lf)
Control Cable Pull Inc.
Comm. ) (lf)
Signal'able Pull (lf)
Terms Pwr Hi (ea)
Terms - Pwr Lo (ea)
Terms - Control (ea)
Terms Signal (ea)
START-UP PROGRAM% STATUS:
129(708 70,048 62,184 52,322 2,615 417 36,204 275,435 88,510 362,661 1,184,025 304,665 314 5, 143 26,075 4,263 SCHEDULED TO DATE ESI/N/IALLY 68.0 51.2 62.3 71.8 ESSENTIALLY 77.0 85.2 64.0 54.5
- 23. 1
- 61. 4
- 65. 0
- 35. 2 8.0 COMPLETED TO DATE 4, 296 3, 205 56 21 COMPLETE 11,094 3I2 1,771 72,691 34,951 30 792 2,404 1, 105 SCHEDULE FOR MONTH 2, 145 4,420 4, 210 100 30 7,260 2,440 30,595 120,840 34, 515 30
-620 3, 110 CURRENT MONTH 1,955 4,400 4,155 135 7,700 2,060 25,215 90,790 44,455 25 315 3,480 3,535 TOTAL REDUTRED Preoperat'onal Test Proced.
System Turnovers (PTO)
System Turnovers (CTO)
Preoperational Tests Performed 196 109 17 9
183 101>>
19" 3
13 37 13 2
0 14" lg*
0 196 177 159 196
- NOTE:
Includes turnover packages in signoff circuit.
0 f