Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17212B716 + (20:40:20, 8 January 2025)
- L-82-272, Responds to Generic Ltr 82-10, Post-TMI Requirements. Status Provided for Items I.A.1.3.1 Re Limitations on overtime,I.A.1.3.2 Re Min Shift Crew & I.D.1 Re Control Room Design Review + (20:40:21, 8 January 2025)
- ML17212B714 + (20:40:24, 8 January 2025)
- ML17212B712 + (20:40:24, 8 January 2025)
- L-82-260, Application for Amend to License DPR-67,consisting of Proposed Change to Tech Specs by Increasing Min Shift Crew Composition.Proposed Change in Response to NUREG-0737,Item I.A.1.3, Shift Manning + (20:40:25, 8 January 2025)
- L-82-249, Application to Amend App a of License DPR-67 by Deleting Requirements to Test Buried Electrical Cable Periodically to Detect Potential Environ Damage.Class II Fee Encl + (20:40:27, 8 January 2025)
- ML17212B709 + (20:40:27, 8 January 2025)
- L-82-253, Forwards Const/Startup Monthly Progress Rept for May 1982 + (20:40:29, 8 January 2025)
- ML17212B695 + (20:40:31, 8 January 2025)
- ML17212B693 + (20:40:33, 8 January 2025)
- ML17212B694 + (20:40:33, 8 January 2025)
- L-82-246, Forwards Application for Amend to CPPR-144 for Addition of co-owner & co-applicant.Payment of Class III Fee Encl + (20:40:34, 8 January 2025)
- ML17212B686 + (20:40:36, 8 January 2025)
- ML17212B687 + (20:40:36, 8 January 2025)
- ML17212B684 + (20:40:37, 8 January 2025)
- ML17212B682 + (20:40:38, 8 January 2025)
- ML17212B683 + (20:40:38, 8 January 2025)
- ML17212B681 + (20:40:39, 8 January 2025)
- ML17212B680 + (20:40:39, 8 January 2025)
- ML17212B679 + (20:40:40, 8 January 2025)
- ML17212B678 + (20:40:41, 8 January 2025)
- ML17212B677 + (20:40:42, 8 January 2025)
- ML17212B676 + (20:40:42, 8 January 2025)
- ML17212B673 + (20:40:43, 8 January 2025)
- ML17212B674 + (20:40:43, 8 January 2025)
- L-82-238, Forwards Responses to Questions 2-5 Re Overpressure Mitigating Sys,Per 820412 Request.Testing Procedures Verifying Operability Will Be Developed by 820801.Response to Question 1 Will Be Provided by 820716 + (20:40:44, 8 January 2025)
- ML17212B670 + (20:40:47, 8 January 2025)
- ML17212B668 + (20:40:48, 8 January 2025)
- ML17212B667 + (20:40:48, 8 January 2025)
- ML17212B666 + (20:40:49, 8 January 2025)
- ML17212B665 + (20:40:50, 8 January 2025)
- L-82-233, Concurs W/Revised Position on Startup Flux Channel Boron Dilution Alarm Per NRC .Alarm Will Not Be Installed + (20:40:53, 8 January 2025)
- ML17212B660 + (20:40:56, 8 January 2025)
- ML17212B658 + (20:40:57, 8 January 2025)
- ML17212B656 + (20:40:58, 8 January 2025)
- ML17212B653 + (20:40:59, 8 January 2025)
- L-82-222, Forwards Amend 10 to FSAR + (20:41:00, 8 January 2025)
- L-82-226, Advises That Responses to Generic Ltr 82-10, Post-TMI Requirements, Will Be Submitted by 820702 + (20:41:02, 8 January 2025)
- ML17212B642 + (20:41:04, 8 January 2025)
- L-82-224, Forwards Addl Info to Substantiate Util UHS Tech Spec Request,In Response to NRC + (20:41:05, 8 January 2025)
- L-82-223, Advises That Proposed Tech Spec Amend Has Been Withdrawn.Appropriate Secondary Water Limits Are Controlled by NRC Approved Program + (20:41:07, 8 January 2025)
- L-82-217, Forwards Response to 820419 Request for Addl Info Re Operating Time Curves for Undervoltage Relays for 4,160-volt & 480-volt Sys & Class IE Equipment Protection + (20:41:08, 8 January 2025)
- L-82-216, Informs of Delay in Analysis of Seized Rotor & Loss of All Nonemergency Power Events.Complexity of Task Dictated That Analysis Be Subcontracted.New Submittal Date of 820831 Anticipated + (20:41:10, 8 January 2025)
- ML17212B635 + (20:41:12, 8 January 2025)
- ML17212B632 + (20:41:14, 8 January 2025)
- ML17212B633 + (20:41:14, 8 January 2025)
- L-82-218, Forwards Post-Accident Sampling Sys Instrumentation, Per NUREG-0843 & 811107 Commitment + (20:41:15, 8 January 2025)
- L-82-219, Forwards Summary of NRC Seismic Qualification Review Team & Pump Valve Operability Review Team 820511-14 Audits, Including Agenda,Findings & Equipment Status.Outstanding Info Will Be Provided by 820615 + (20:41:17, 8 January 2025)
- ML17212B628 + (20:41:19, 8 January 2025)
- ML17212B627 + (20:41:19, 8 January 2025)
- ML17212B625 + (20:41:20, 8 January 2025)