ML17212B712

From kanterella
Jump to navigation Jump to search
Proposed Change to Tech Specs Table 6.2-1,increasing Min Shift Crew Composition
ML17212B712
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/28/1982
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17212B711 List:
References
NUDOCS 8207020179
Download: ML17212B712 (2)


Text

Table 6.2-1 MINIMUM SHIFT CREW COMPOSITION" POSITION WITH THE. OTHER UNIT IN MODES 5 OR 6 OR DE-FUELED NUMBER OF INDIVIDUALS REQUIRED TO FILL POSITION SS (SRO)

SRO RO AO STA MODES 1, 2, 3, 8( 4 1a 1

2 2

1 MODES 5 5 6 None

  • 1 2b None POSITION WITH THE OTHER UNIT IN MODES 1, 2, 3, OR 4 NUMBER OF INDIVIDUALS REQUIRED TO FILL POSITION SS (SRO)

SRO RO AO STA MODES1,2,3,54 1

2 2

Ia MODES 5 5 6 1a None None SS

- Shift Supervisor SRO - Licensed Senior Reactor Operator STA - Shift Technical Advisor RO - Licensed Reactor Operator AO - Auxiliary Operator Does not include the licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling, supervising CORE ALTERATIONS after the initial fuel loading.

Shift crew composition may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accomodate unexpected absence of on duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements of Table 6.2-1.

gg This block alone applies in MODES 1 through 6 prior to Unit 2 operating license issuance and commencement of initial fuel loading.

a/

Individual may fill the same position on the other unit.

b/

One of the two required individuals may fill the same position on the other unit.

ST.

LUCIE - UNIT 1 8/07020<7 0~0PPP+5 ",, '

820628 Pgg AGPCK

'gal,,

0

~4 J