L-82-218, Forwards Post-Accident Sampling Sys Instrumentation, Per NUREG-0843 & 811107 Commitment
| ML17212B630 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 05/24/1982 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17212B631 | List: |
| References | |
| RTR-NUREG-0843, RTR-NUREG-843 L-82-218, NUDOCS 8205280448 | |
| Download: ML17212B630 (3) | |
Text
REGULATORY FORMATION.DISTRIBUTION 'SY M (RIDS)
"AOCBS SION NBR 0 8205280'448 DOC ~ DATE 82/05/24 NOTARIZED NO 'OCKET
-l'AO1Lc50 389 'St ~ Lucie Planti Uni~t 2i Flor ida Power L,Light Co.,
05000389
'AUTHs'NAME
'UTHOR 'AFFILIATION UHRIGiR s 6 ~
"F 1 or ida ~Power 8 "Li'ght Co.
iRBCIP,NAME RECIPIENT AFFILIATION EISENHUT~Os'Gs Division of,Licensing
SUBJECT:
For wards,"Post Accident 'Sampling 'Sys Instrumentation~," iper NUREG<<0803 8, 811107 "commitment.
DISTRISUTION ICODE:
S001'0 ICOPIES IRECEIVED:LITR. L'ENCL.)
"SIZE:.'L }
TITLE: 'PSAR/FSAR 'AHDTS -and Related
~Cort espondence NOT>E'S:
RECIPIENT IO CODE/NAME A/D LICENSNG LIC BR ¹3 LA INTERt<<AL: ELD/HOS2 IE/DEP EPDS
'35 HPA NRR/DE/EQB 13 NRR/DE/HGEB t30
.NRR/OE/MTEB 17 NRR/DE/SAB
'20
~
NRR/DHFS/HFEBQO NRR/DHFS/OL'B 34 NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ETSB 12 NRR/DSI/PSB
. 19 NRR.
RSB 23 G
pg EXTERNAL': ACRS FEHA>>REP DIV 39 NRC PDR 02 NTI'8
<<COPIES
.LTTR "ENCL 1
0 0
1 0l,i
>>0
<<3
$ 3 2
'2 1
1 1
1 1
1 1
1 1
1 1
1
~ 1 1
1 1
1 10 10 1
1 1
1 1
1 REC IP IENT
'ID.CODE/NAME LIC tBR ¹P
~BC NERSESRV ~
01 IE,-F ILE IE/OEP/EPLB t36 NRR/OE/CEB 11-NRR/DE/GB 28 NRR/DE/HEB 18 NRR/OE/QAB 21 NRR/DE/SEB
'25 NRR/DHFS/LQB 32'RR/DHFS/PTRB20 NRR/DS I/A'SB 27 NRR/DS I/CSB 09 NRR/DSI'/IiCSB 16 NRR/OS I/RAB
'22'RR/DST/LGB33 RGN2
'BNL(AMDTS ONLY)
'COPIES LTiTR,ENCL'1 0
1,1 1
1 T3
<<3>>
1 "2
2 1
1 1
1 1
,.1 1
1 1
-1 1
.1 1
1 1
1 1=-
1 1
I' 1
1 1
1 1
)TOTAL NUMBER.OF >COPIES REQUIRED o UTT'R
!57>>ENCL
.'52
r 0
f )
l >I
~
4 ~
t O
e e
ts 1 ~
~
s II A
4 '%8 1
-. ~ 4 ll I
"h f'
,O. BOX 529100 MIAMI,FL 33152 qgligii i/IfA FLORIDAPOWER & LIGHTCOMPANY Office of Nuclear Reactor Regulations Attention:
Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Nay 24, 1982 L-82-218
Dear Mr. Eisenhut:
Re:
St. Lucie Unit No.
2 Docket No. 50-389 Post Accident Sampling System Instrumentation Test Procedure Attached please find a copy of the test procedure that Florida Power and Light is utilizing to verify that the Post Accident Sampling System (PASS) Instrumentation will function properly.
This testing is being performed to satisfy a concern identified in Supplement 1 to the St. Lucie Safety Evaluation Report (Nureg 0843) and also to satisfy our corImitment of, November 7, 1981 to provide this information.
Mhen this verification testing is complete, we will provide the test results and our conclusions.
If you have any questions please contact us directly.
Very truly yours,+
~ ~
Robert E. Uhrig Vice President Advanced Systems and Technology REU/RAK/lej Attachment cc-J.
P. O'Reilly, Region II Harold F. Reis, Esquire
@DOl
.8I65 geo "l%