Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17213B395 + (20:27:31, 8 January 2025)
- L-83-315, Forwards Equipment Qualification Radiation Dose Map Development, in Response to 830406 Request.Rept Presents Assumptions & Methodology Used in Creating Dose Maps & Two Illustrative Dose Points + (20:27:34, 8 January 2025)
- L-83-309, Reschedules 830520 Meeting on Plant Recovery Program - Loose Parts Monitor & ex-core Detector,For 830603,w/followup Documentation to Be Provided by 830606 + (20:27:36, 8 January 2025)
- L-83-317, Confirms That GE AK-2 Scram Breakers Used at San Onofre Also in Use at Facility + (20:27:38, 8 January 2025)
- L-83-298, Forwards Class III Amend Fee for 830309 Request for Proposed Tech Spec Changed Re Chlorine Detection Sys + (20:27:40, 8 January 2025)
- L-83-314, Forwards Schedule for Qualification or Replacement of Equipment Important to Safety within Scope of 10CFR50.49. Addl Documentation to Demonstate That Equipment Committed to Be Qualified Meets Specific Requirements Forthcoming + (20:27:42, 8 January 2025)
- L-83-316, Responds to 830504 Request for Submittal Date of Exam & Results for Matl Irradiation Surveillance.Final Rept Summarizing C-E Test Results Expected in Early Oct 1983.Rept Will Be Submitted by 831101 + (20:27:44, 8 January 2025)
- ML17213B387 + (20:27:47, 8 January 2025)
- ML17213B381 + (20:27:48, 8 January 2025)
- ML17213B386 + (20:27:48, 8 January 2025)
- ML17213B372 + (20:27:49, 8 January 2025)
- L-83-290, Forwards Response to Requests for Addl Info Re Cycle 6 Reload.Performance of C-E Fuel Examined & Tech Spec Change to Remove Augmentation Factors Supported + (20:27:50, 8 January 2025)
- ML17213B369 + (20:27:52, 8 January 2025)
- ML17213B368 + (20:27:53, 8 January 2025)
- ML17213B367 + (20:27:54, 8 January 2025)
- L-83-292, Responds to Generic Ltr 83-10B, Resolution of TMI Action Plan Item II.K.3.5,Automatic Trip of Coolant Pumps. C-E Owners Group Has Chosen Trip Two,Leave Two Strategy to Resolve Item.Description of Program Expected by 830701 + (20:27:56, 8 January 2025)
- ML17213B365 + (20:27:56, 8 January 2025)
- L-83-286, Advises That Mods to Purge Sys Not Required.Sufficient Margin Exists to Allow Check Valve to Perform Intended Safety Function.Item Closes Out 5% of Rated Thermal Power Portion of License Condition 2.C.8 + (20:27:58, 8 January 2025)
- ML17213B360 + (20:28:00, 8 January 2025)
- ML17213B359 + (20:28:01, 8 January 2025)
- ML17213B358 + (20:28:02, 8 January 2025)
- ML17213B357 + (20:28:03, 8 January 2025)
- ML17213B355 + (20:28:05, 8 January 2025)
- ML17213B354 + (20:28:06, 8 January 2025)
- ML17213B352 + (20:28:07, 8 January 2025)
- L-83-276, Advises That Vendor Safety Analysis to Support Installation of Mods to Auxiliary Sys,Per Util Re Main Steam Line Break W/Continued Feedwater Addition,Is Under Review. Response to Core Reactivity Question Expected by 830615 + (20:28:08, 8 January 2025)
- L-83-285, Forwards Info Justifying Continued Operation W/Electrical Equipment in Item 114 Per .All Other Items Listed in Category Ii.B of Franklin Research Ctr Technical Evaluation Rept Replaced W/Qualified Transmitters + (20:28:12, 8 January 2025)
- L-83-280, Advises That 10-yr pressure-temp Operating Limits (P-T) for Plant Recovery Program Reactor Vessel Internals & Thermal Shield Valid for Upcoming Cycle 6.P-T Limits Will Be Reviewed & Revised,If Necessary,Prior to Exceeding 7.4 EFPY + (20:28:14, 8 January 2025)
- ML17213B343 + (20:28:17, 8 January 2025)
- ML17213B340 + (20:28:18, 8 January 2025)
- ML17213B341 + (20:28:18, 8 January 2025)
- ML17213B339 + (20:28:19, 8 January 2025)
- ML17213B338 + (20:28:19, 8 January 2025)
- ML17213B337 + (20:28:20, 8 January 2025)
- L-83-227, Forwards Fire Hazard Analysis for Facility + (20:28:21, 8 January 2025)
- ML17213B336 + (20:28:21, 8 January 2025)
- ML17213B332 + (20:28:23, 8 January 2025)
- ML17213B331 + (20:28:24, 8 January 2025)
- ML17213B330 + (20:28:25, 8 January 2025)
- ML17213B328 + (20:28:26, 8 January 2025)
- ML17213B326 + (20:28:27, 8 January 2025)
- ML17213B324 + (20:28:30, 8 January 2025)
- ML17213B323 + (20:28:31, 8 January 2025)
- ML17213B321 + (20:28:35, 8 January 2025)
- ML17213B320 + (20:28:36, 8 January 2025)
- L-83-265, Forwards Reactor Vessel Internals & Thermal Shield Plant Recovery Program Per 830419 Commitment to Provide Safety Assessment of Possible Effects on Fuel Performance Due to Loose Parts.No Fuel Problems Indicated at Facility + (20:28:37, 8 January 2025)
- L-83-263, Summarizes 830425 Meeting W/Nrc Re Reactor Vessel Internals & Thermal Shield Plant Recovery Program Concerning Pressurized Thermal Shock.Plant May Safely Operate W/O Restriction from Pressurized Thermal Shock Considerations + (20:28:39, 8 January 2025)
- L-83-264, Forwards Plant Recovery Plan Presented at 830425 Meeting Re Reactor Vessel Internals & Thermal Shield,In Response to Item C of .Plan Will Be Revised Daily W/Updates Provided Upon Availability + (20:28:41, 8 January 2025)
- L-83-262, Withdraws 830405 Relief Request for Performing Inservice Insp.Relief Will Not Be Required + (20:28:43, 8 January 2025)
- L-83-254, Requests Relief from Tech Spec 4.4.10.1.a & 10CFR50.55a(g) Requirements Re Inservice Insp.Relief Requested Due to Problems W/Thermal Shield Which Necessitated Removal of Reactor Internals + (20:28:48, 8 January 2025)
- L-83-255, Advises of Changes That Should Be Made to to DG Eisenhut Re Reload Safety Analysis for Cycle 6.Ref 2 of XN-NF-83-81 Cycle 6 SAR Should Be Deleted & Ref 11 Should Be Changed to XN-NF-75-32(P),Suppls 1-4 + (20:28:50, 8 January 2025)