Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-83-525, Provides Schedule for Submittal of Core Damage Assessment Procedure,Eleventh Criterion of NUREG-0737,Item II.B.3, Post-Accident Sampling Sys. Procedure Will Be Submitted Prior to Startup Following Fall 1984 Refueling Outage + (20:22:07, 8 January 2025)
- L-83-526, Forwards List of Addl ESF Actuation Sys Relays Not Identified in 830926 Submittal or FSAR to Be Nontestable W/O Jeopardizing Plant Safety.Sufficient Justification Provided for Not Testing Relays + (20:22:10, 8 January 2025)
- ML17214A519 + (20:22:10, 8 January 2025)
- L-83-495, Provides Amended Safety Evaluation & Determination of No Significant Hazards in Response to Concerns Re NSHC Determination Submitted w/830825 Proposed License Amend Re Peaking Factor & Load Follow Power Peaking Penalty + (20:22:12, 8 January 2025)
- ML17214A516 + (20:22:14, 8 January 2025)
- ML17214A514 + (20:22:16, 8 January 2025)
- L-83-528, Responds to 830916 Telcon Request for Addl Info on Franklin Research Ctr Technical Evaluation Rept,Item 114 Re Fisher & Porter Pressure Transmitter.Transmitter Inoperability Will Not Affect Safety Sys If Failure Occurs + (20:22:17, 8 January 2025)
- L-83-521, Forwards Rev 5 to Recovery Plan Listing post-core Support Barrel Approximate Repair Flushing Time.Remaining Info Submittal Dates Listed.Thermal Shield Failure Analysis Will Be Submitted by 831027 + (20:22:18, 8 January 2025)
- L-83-518, Application for Amend to Licenses DPR-67 & NPF-16,revising Facility Organization Chart & Modifying Definition of Shift Technical Advisor Function + (20:22:21, 8 January 2025)
- ML17214A504 + (20:22:22, 8 January 2025)
- ML17214A502 + (20:22:24, 8 January 2025)
- ML17214A503 + (20:22:24, 8 January 2025)
- L-83-514, Forwards Draft Emergency Operating Procedure, Alternate Shutdown & Indices App R Cables W/Fire Area Routes & App R Equipment & Cables by Fire Area, Per 10CFR50,App R, Section III.G.3 Requirements + (20:22:25, 8 January 2025)
- ML17214A494 + (20:22:27, 8 January 2025)
- ML17214A493 + (20:22:28, 8 January 2025)
- ML17214A492 + (20:22:29, 8 January 2025)
- ML17214A491 + (20:22:30, 8 January 2025)
- L-83-510, Forwards Inservice Test Program for Pumps & Valves & Rev 0 to PNS-CIG Document 002-10, Inservice Insp,First 10-Yr Plan, Vols 1 & 2 + (20:22:31, 8 January 2025)
- L-83-509, Discusses Reactor Vessel Internals & Thermal Shield & Plant Recovery Program.Outline of Final Rept of Integrity & Stability of Internals W/O Thermal Shield,Presented at 830922 Meeting,Encl.Info Submittal Dates Listed + (20:22:32, 8 January 2025)
- ML17214A486 + (20:22:35, 8 January 2025)
- ML17214A484 + (20:22:40, 8 January 2025)
- L-83-504, Forwards Detailed Control Room Design Review of Plant, St Lucie Unit 2 Nuclear Power Station (NUREG-0737,Suppl 1), Per 830415 Commitment + (20:22:41, 8 January 2025)
- ML17214A480 + (20:22:43, 8 January 2025)
- ML17214A478 + (20:22:45, 8 January 2025)
- ML17214A474 + (20:22:46, 8 January 2025)
- ML17214A471 + (20:22:47, 8 January 2025)
- ML17214A469 + (20:22:48, 8 January 2025)
- ML17214A464 + (20:22:49, 8 January 2025)
- L-83-500, Forwards Class II & Class III Fees for License Amend Applications & 0615,per NRC + (20:22:50, 8 January 2025)
- L-83-497, Forwards List of Specific ESF Actuation Sys Devices & Associated Actuated Equipment Which Cannot Be Tested at Power.Equipment Not Previously Identified in FSAR Table 7.3-9 + (20:22:52, 8 January 2025)
- ML17214A456 + (20:22:54, 8 January 2025)
- ML17214A454 + (20:22:55, 8 January 2025)
- TAC:44404 + (20:22:55, 8 January 2025)
- ML17214A451 + (20:22:57, 8 January 2025)
- ML17214A449 + (20:22:59, 8 January 2025)
- ML17214A444 + (20:23:01, 8 January 2025)
- L-83-491, Forwards One Oversize Drawing Depicting post-core Support Barrel Lug Removal NDE Data,Per Util + (20:23:02, 8 January 2025)
- ML17214A443 + (20:23:02, 8 January 2025)
- ML17214A438 + (20:23:05, 8 January 2025)
- ML17214A440 + (20:23:05, 8 January 2025)
- L-83-489, Application to Amend License DPR-67,deleting Tech Spec Requirement to Perform Containment Leakage Path Test for Penetration 25 (Fuel Transfer Tube) Tap 2 to Prevent Bellows Overpressurization + (20:23:06, 8 January 2025)
- L-83-488, Forwards Suppl 2 to Fire Hazard Analysis Rept + (20:23:07, 8 January 2025)
- ML17214A432 + (20:23:13, 8 January 2025)
- L-83-476, Advises That Engineering Dept Performing Detailed Drawing Review to Confirm Vital Area Equipment Is Contained in Rev 7 to Security Plan.Review Will Be Completed by 830930.Security Plan Will Be Revised to Correct Deviations + (20:23:15, 8 January 2025)
- ML17214A428 + (20:23:15, 8 January 2025)
- L-83-475, Forwards Rev 3 to Plant Recovery Plan for Reactor Vessel Internals & Thermal Shield to Refine NDE Data & pre- & post-core Support Barrel Lug Removal + (20:23:17, 8 January 2025)
- L-83-474, Notifies of Intent to Initiate Second Cycle Operation at Core Power Level of 2,700 MW in Dec 1984.Completion of Review Should Be Scheduled for Oct 1984,2 Months Prior to Expected Startup of Cycle 2 to Allow for Mods + (20:23:20, 8 January 2025)
- ML17214A420 + (20:23:20, 8 January 2025)
- 05000389/LER-1983-037-03, /03L-0:on 830728,during Loss of Offsite Power Test,Diesel 2B Failed to Load Onto 4,160-volt Bus.Caused by Broken Electrical Termination Lug.Lug Replaced + (20:23:26, 8 January 2025)
- L-83-463, Forwards Supplemental Response to NRC Request for Addl Info Re NUREG-0612 General Guideline 7, Crane Design. Outstanding Concerns Resolved + (20:23:27, 8 January 2025)
- ML17214A416 + (20:23:30, 8 January 2025)