ML17214A486

From kanterella
Jump to navigation Jump to search
Advises That Project Mgt Responsibility Transferred from Licensing Branch 3 to Operating Reactor Branch 3,effective 830919.Personnel Changes Listed
ML17214A486
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/26/1983
From: John Miller
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8310110497
Download: ML17214A486 (3)


Text

~EP 38 1983 Docket No. 50-389 Dr. Robert E.

Uhr ig Vice President Advanced Systems 8 Technology Florida Power 8 Light Company P. 0.

Box 14000 Juno Beach, Florida 33408 04 gg>As-a]V

~Docket File NRC PDR Local PDR ORB83 Rdg DEisenhut OELD EJordan

'Sells PNKreutzer RFerguson NSIC JTaylor ACRS (10)

FRC*

JRNiller

Dear Dr. Uhrig:

SUBJECT:

TRANSFER OF RESPONSIBILITY FOR ST.

LUCIE PLANT, UNIT NO.

2 Effective September 19, 1983 the project management responsibility for

. the St. Lucie Plant, Unit No.

2 has been transferred from Licensing Branch 83 to Operating Reactors Branch 83, Division of Licensing.

The following are the personnel changes associated with this transfer of responsibility:

Project Manager Branch Chief Assistant Director Licensing Assistant V. Nerses G. Knighton T. Novak J.

Lee To Donald E. Sells (301) 492-9735 James R. Miller (301) 492-4559 Gus C. Lainas (301) 4Q-7817 Patricia Kreutzer (301) 492-9516 Future correspondence to the Commission dealing with St. Lucie 2 should be directed to the appropriate newly assigned personnel using the same address as are currently being used for St. Lucie l.

Sincerely, Origina I signed by:

cc:

See next page James R. Miller, Chief Operating Reactors Branch 83 Division of Licensing 83iOi.i0497'830926 PDR ADOCK 05000389 PDR OFF ICED SURNAMES'ATE 0

c; dcl P

giy ~ 1 ~ ~ ~ 0 ~

.g.g.jgg,83....--

.JR

~ h'.

<rieeoo ~ ~

NRC FORM 318 (10~) NRCM 0240 OFFI IAL RECORD COPY USGPO'9S l~rw0

J

~

C I

l"

Florida Power 8 Light Company CC:

Harold F. Reis, Esquire Lowenstein,

Newman, Reis 8

Alexrad'025 Connecticut Avenue, N.W.

Washington, D. C.

20036 Norman A. Coll, Esquire McCarthy, Steel, Hector 8 Davis 14th Floor, First National Bank Building Miami Florida 33131 Mr. Jack Schreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector c/o U.S.N.R.C.

7900 S. AIA Jensen Beach, Florida 33457 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis County Administrator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 U.S. Environmental Protection Agency Region IV Office ATTN:

Regional Radiation Representative 345 Courtland Street, N.E.

Atlanta, Georgia 30308 Mr. Charles B. Brinkman Manager - Washington Nuclear Operations C-E Power Systems Combustion Engineering, Inc.

7910 Woodmont Avenue

Bethesda, Maryland 20814 Regional Administrator

~ Nuclear Regulatory Commission, Region II Office of Executive Director for Operations 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 State Planning and Develpment Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capitol Builcfing Tallahassee, Florida 32301