Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17228A868 + (18:42:55, 8 January 2025)
- ML17228A866 + (18:42:56, 8 January 2025)
- ML17228A862 + (18:42:57, 8 January 2025)
- ML17228A860 + (18:42:58, 8 January 2025)
- ML17228A859 + (18:42:59, 8 January 2025)
- IR 05000335/1994015 + (18:43:00, 8 January 2025)
- TAC:M89906 + (18:43:01, 8 January 2025)
- ML17228A857 + (18:43:02, 8 January 2025)
- ML17228A855 + (18:43:03, 8 January 2025)
- L-94-233, Responds to Violation Noted in Insp Rept 50-389/94-15. Corrective Actions:Plant Shutdown & Entered Mode 3 on 940714 & Need Site Vice President & Plant General Manager Reviewed Event W/Operations Mgt & Other Key Site Personnel + (18:43:04, 8 January 2025)
- 05000389/LER-1994-006, :on 940714,trip Circuit Breaker Five Failed to Open Due to Broken Piece of Phenolic Block Lodged in Trip Latch Mechanism.Need for Strict Adherence to TS Emphasized + (18:43:06, 8 January 2025)
- L-94-232, Special Rept:On 940823 & 25,RAB Exhaust Sys WRGM RM-26-90 Declared Out of Svc.Caused by Intermittment Communication Due to Power Supply Regulator Failure.Chemistry Procedure C-93 Implemented & Portable Monitor Installed + (18:43:07, 8 January 2025)
- L-94-238, Monthly Operating Repts for Aug 1994 for St Lucie Units 1 & 2 + (18:43:08, 8 January 2025)
- L-94-222, Forwards Responses to NRC 940728 RAI Re Revs 25 & 26 of Plant Radiological Emergency Plan + (18:43:10, 8 January 2025)
- L-94-229, Forwards marked-up Data Pages That Require Correction & or Addl Info,In Response to BNL 940729 Request for Verification of 1992 Radioactive Effluent Release Data for Plant + (18:43:11, 8 January 2025)
- L-94-228, Forwards Util 940822 & 25 Ltrs,Requesting Mods to NPDES Permit to Delete Osn 006A & 008 Outfalls & Clarify & Designate Routing & Exact Location for Osn 006C + (18:43:13, 8 January 2025)
- L-94-220, Forwards Response to Addl Info Re Proposed License Amends on Flood Protection + (18:43:15, 8 January 2025)
- ML17228A845 + (18:43:15, 8 January 2025)
- IR 05000335/1994018 + (18:43:20, 8 January 2025)
- ML17228A841 + (18:43:21, 8 January 2025)
- ML17228A840 + (18:43:23, 8 January 2025)
- ML17228A839 + (18:43:24, 8 January 2025)
- ML17228A837 + (18:43:25, 8 January 2025)
- ML17228A836 + (18:43:26, 8 January 2025)
- L-94-212, Frowards Rev 1 to JNS-PSL-204, Second Ten-Yr ISI Interval IST Program for Pumps & Valves,St Lucie Nuclear Power Plant Unit 2. Response to Open Items Noted in 930823 SE of IST Program Also Encl + (18:43:27, 8 January 2025)
- NL-17-1408, ISFSI - Registration of Spent Fuel Cask Use + (18:43:28, 8 January 2025)
- ML17228A797 + (18:43:29, 8 January 2025)
- ML17228A795 + (18:43:30, 8 January 2025)
- ML17228A784 + (18:43:31, 8 January 2025)
- IR 05000261/2017403 + (18:43:32, 8 January 2025)
- ML17228A769 + (18:43:32, 8 January 2025)
- ML17228A742 + (18:43:33, 8 January 2025)
- ML17228A737 + (18:43:33, 8 January 2025)
- ML17228A717 + (18:43:35, 8 January 2025)
- ML17228A729 + (18:43:35, 8 January 2025)
- ML17228A716 + (18:43:36, 8 January 2025)
- ML17228A708 + (18:43:37, 8 January 2025)
- IR 05000335/1994016 + (18:43:42, 8 January 2025)
- ML17228A694 + (18:43:44, 8 January 2025)
- L-94-213, Forwards Rev 0 to PSL-200-RAI-94, St Lucie Nuclear Plant, Unit 2 Second ISI Interval NRC RAI, Requested by NRC + (18:43:46, 8 January 2025)
- ML17228A693 + (18:43:46, 8 January 2025)
- ML17228A690 + (18:43:48, 8 January 2025)
- L-94-147, Forwards Rev 1 to Rept EMF-92-148, St Lucie Unit 1 SBLOCA Analysis & SBLOCA Data Relevant to Review of Util 930319 Proposed License Amend Request to Change RCS Design Flowrate.Requests That NRC Issue Subj Amend by 941115 + (18:43:49, 8 January 2025)
- L-94-120, Notifies That Actions Items 1.a,1.b,1.c,1.d & 1.f Completed, Per W/Schedules in Attacment to Ltr L-93-61,in Response to NRC Bulletin 90-001,Suppl 1 + (18:43:50, 8 January 2025)
- ML17228A684 + (18:43:53, 8 January 2025)
- L-94-214, Forwards semi-annual fitness-for-duty Program Performance Data for Period Ending 940630 + (18:43:53, 8 January 2025)
- L-94-204, Monthly Operating Repts for Jul 1994 for St Lucie Units 1 & 2 + (18:43:55, 8 January 2025)
- L-94-166, Responds to Violation Noted in Insp Repts 50-335/94-11 & 50-389/94-11.Corrective Actions:Complete Actuator Assembly & Valve Internals of MV-08-12 & MV-08-13 Replaced & Plant Maint Procedure 0950065 Changed + (18:43:56, 8 January 2025)
- ML17228A674 + (18:43:58, 8 January 2025)
- 05000389/LER-1994-005-01, :on 940708,TS 3.0.3 Entered When Emergency Core Cooling Systems Limiting Condition for Operation Was Not Met Due to Personnel Error.Operations Has Revised Format of Equipment + (18:44:00, 8 January 2025)
- L-94-193, Informs of GL 89-10 Commitment Change.Util Intends to Reduce Scope of Dynamic MOV Testing for GL 89-10 by Grouping of Testable MOVs & Eliminating MOV Mispositioning Criteria + (18:44:01, 8 January 2025)