ML17228A841

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-335/94-18 & 50-389/94-18 on 940731-0827.No Violations or Deviations Noted
ML17228A841
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/31/1994
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Goldberg J
Florida Power & Light Co
Shared Package
ML17228A842 List:
References
NUDOCS 9409070040
Download: ML17228A841 (3)


See also: IR 05000335/1994018

Text

AUG 31 1994

Docket Nos.

50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Florida Power

& Light Company

ATTN:

J.

H. Goldberg

President

- Nuclear Division

P. 0.

Box 14000

Juno

Beach,

Florida

33408-0420

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-335/94-18

AND 50-389/94-18

This refers to the inspection

conducted

by S.

A. Elrod of this office on July

31

- August 27,

1994.

The inspection

included

a review of activities

authorized for your St.

Lucie facility.

At the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the

enclosed report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Within the scope of the inspection,

violations or deviations

were not

identified.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosure(s) will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

ORIGINAL S)GNED SY

DAVID M. VFRRELLI

David

M. Verrelli, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

page

2)

9409070040

940831

PDR

ADOCK 05000335

9

PDR

Florida Power

& Light Company

AUG 81 1994

cc w/encl:

Continued

D. A. Sager

Vice President

St.

Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

H. N. Paduano,

Manager

Licensing

and Special

Programs

Florida Power and Light Company

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

C.

L. Burton

Plant General

Manager

St. Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

Robert

Dawson

Plant Licensing Manager

St.

Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0218

Harold

F, Reis,

Esq.

Newman

& Holtzinger

1615

L Street,

NW

Washington,

D.

C.

20036

John T. Butler,

Esq.

Steel,

Hector and Davis

4000 Southeast

Financial

Center

Miami, FL

33131-2398

Bill Passetti

Office of Radiation Control

Department of Health

and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

Jack Shreve

Public Counsel

Office of the Public Counsel

c/o The Florida Legislature

ill West Madison Avenue,

Room 812

Tallahassee,

FL

32399-1400

cc w/encl:

Continued

see

page

3

Florida Power

& Light Company

P,UG 3 j. 1994

cc w/encl:

Continued

Joe Hyers, Director

Division of Emergency

Preparedness

Department of Community Affairs

2740 Centerview Drive

Tallahassee,

FL

32399-2100

Thomas

R.

L. Kindred

County Administrator

St.

Lucie County

2300 Virginia Avenue

Ft. Pierce,

FL

34982

Charles

B. Brinkman

Washington Nuclear Operations

ABB Combustion

Engineering,

Inc.

12300 Twinbrook Parkway,

Suite

3300

Rockville,

HD

20852

bcc w/encl:

K. Landis, RII

J. Norris,

NRR

G. A. Hallstrom, RII

Document Control

Desk

NRC Resident

Inspector

U.S. Nuclear Regulatory

Comm.

7585 South

Highway AlA

Jensen

Beach,

FL

34957-2010

RII

RS

in

8@i /94

RII

Lan is

08/g//94