NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Acceptance of Requested Licensing Action Regarding NFPA-805 Implementation Date Extension
ML17228A717
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/16/2017
From: Shawn Williams
Plant Licensing Branch II
To: Mcelroy G
Southern Nuclear Operating Co
References
MG0094, MG0095
Download: ML17228A717 (3)


Text

NRR-PMDAPEm Resource From: Williams, Shawn Sent: Wednesday, August 16, 2017 2:24 PM To: 'gkmcelro@southernco.com' Cc: Jackson, Nicole D.

Subject:

Joseph M. Farley, Units 1 and 2 - Acceptance of Requested Licensing Action regarding NFPA-805 Implementation Date Extension (CAC Nos. MG0094, MG0095)

Dear Mr. McElroy,

By August 11, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17226A291),

the Southern Nuclear Operating Company, Inc., submitted an amendment request to revise the Joseph M. Farley Nuclear Plant, Unit 1 and Unit 2, Operating Licenses. The proposed amendment would revise the implementation date to transition to National Fire Protection Association (NFPA) -805 and reach full compliance with Title 10 to the Code of Federal Regulations (10 CFR) 50.48(c) from November 6, 2017, to the conclusion of the Joseph M. Farley 1R28 spring 2018 refueling outage.

The purpose of this letter is to provide the results of NRC staffs acceptance review. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 80 hours3.333 days <br />0.476 weeks <br />0.11 months <br /> to complete. The NRC staff expects to complete this review by November 6, 2017, as requested in your application. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at (301) 415-1009.

Shawn Williams, Senior Project Manager 1

Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 Shawn Williams NRR/DORL/LPL2-1 V.C. Summer and Farley PM 301-415-1009 2

Hearing Identifier: NRR_PMDA Email Number: 3666 Mail Envelope Properties (c26c1209f9ed4b37b92c251ac63e20b3)

Subject:

Joseph M. Farley, Units 1 and 2 - Acceptance of Requested Licensing Action regarding NFPA-805 Implementation Date Extension (CAC Nos. MG0094, MG0095)

Sent Date: 8/16/2017 2:24:29 PM Received Date: 8/16/2017 2:24:34 PM From: Williams, Shawn Created By: Shawn.Williams@nrc.gov Recipients:

"Jackson, Nicole D." <NDJACKSO@southernco.com>

Tracking Status: None

"'gkmcelro@southernco.com'" <gkmcelro@southernco.com>

Tracking Status: None Post Office: HQPWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 3872 8/16/2017 2:24:34 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: