Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17229A119 + (18:25:54, 8 January 2025)
- ML17229A116 + (18:25:56, 8 January 2025)
- L-96-283, Informs That Util Agrees W/Nrc Staff Re Importance of Issues Surrounding Revised LBLOCA Evaluation Model.Final Analysis of Impact of Model Error on ECCS Acceptance Criteria Will Be Prepared + (18:25:57, 8 January 2025)
- L-96-281, Advises That Summary Description Will Be Submitted to NRC Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, within 180 Days + (18:25:58, 8 January 2025)
- L-96-280, Informs That Summary Rept Will Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days + (18:26:00, 8 January 2025)
- ML17229A111 + (18:26:01, 8 January 2025)
- L-96-245, Application for Amend to License NPF-16,modifying TS to Implement 10CFR50,App J,Option B,To Revise TS to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria + (18:26:02, 8 January 2025)
- ML17229A109 + (18:26:02, 8 January 2025)
- ML17229A106 + (18:26:04, 8 January 2025)
- L-96-244, Application for Amend to License DPR-67,requesting to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria + (18:26:05, 8 January 2025)
- ML17229A103 + (18:26:07, 8 January 2025)
- ML17229A102 + (18:26:08, 8 January 2025)
- L-96-275, Forwards St Lucie Plant Status Meeting on 961017 + (18:26:09, 8 January 2025)
- L-96-260, Responds to GL 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks + (18:26:10, 8 January 2025)
- 05000389/LER-1996-004-02, :on 960923,operation Prohibited by TS Occurred. Caused by Cognitive Personnel Error.Fpl Verified That a Successful Stroke Time Surveillance Was Conducted on FCV-25-7 & FCV-25-8 + (18:26:12, 8 January 2025)
- ML17229A097 + (18:26:13, 8 January 2025)
- ML17229A096 + (18:26:14, 8 January 2025)
- ML17229A095 + (18:26:15, 8 January 2025)
- ML17229A094 + (18:26:16, 8 January 2025)
- ML17229A093 + (18:26:17, 8 January 2025)
- L-96-273, Forwards SG Run Time Analysis for Cycle 14 of Plant,Unit 1, Which Includes Responses to NRC RAI & Util Contractor Repts Which Demonstrates That All Significant Parameters of Draft Reg Guide Have Been Met + (18:26:18, 8 January 2025)
- ML17229A092 + (18:26:18, 8 January 2025)
- L-96-255, Responds to Violations Noted in Insp Repts 50-335/96-16 & 50-389/96-16.Corrective Actions:Revised Security Procedure 0006125, Reporting of Safeguards Events, & Will Develop Security Event Response Guidance + (18:26:23, 8 January 2025)
- ML17229A089 + (18:26:23, 8 January 2025)
- L-96-265, Startup Physics Testing Rept + (18:26:27, 8 January 2025)
- L-96-272, Forwards ASME Section XI ISI Data Rept + (18:26:29, 8 January 2025)
- 05000335/LER-1996-013, :on 960918,operation Prohibited by TS Occurred Due to Failure to Bypass Inoperable ESF Channel within Required Action Time.Self Assessment Performed by Operating Crew + (18:26:37, 8 January 2025)
- ML17229A081 + (18:26:38, 8 January 2025)
- IR 05000335/1996014 + (18:26:47, 8 January 2025)
- ML17229A078 + (18:26:48, 8 January 2025)
- TAC:M96274 + (18:26:49, 8 January 2025)
- ML17229A076 + (18:26:50, 8 January 2025)
- ML17229A075 + (18:26:51, 8 January 2025)
- ML17229A073 + (18:26:54, 8 January 2025)
- ML17229A072 + (18:26:55, 8 January 2025)
- ML17229A071 + (18:26:57, 8 January 2025)
- L-96-251, Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2 + (18:26:58, 8 January 2025)
- ML17229A070 + (18:26:58, 8 January 2025)
- L-96-246, Requests Approval of Interim Relief Request 20 Re Containment Cooling Unit Repair,Per ISI Plan + (18:27:00, 8 January 2025)
- L-96-250, Forwards Summary & Results of Reactor Pressure Vessel Weld Exam Results + (18:27:02, 8 January 2025)
- L-96-261, Noncompliance Notification:On 960918,adult Female West Indian Manatee Observed in Intake Canal.Newly Installed Turtle Barrier Net Was Instrumental in Retaining Manatee in Safe Location & in Good Condition.Manatee Released + (18:27:03, 8 January 2025)
- ML17229A064 + (18:27:06, 8 January 2025)
- IR 05000335/1996009 + (18:27:07, 8 January 2025)
- L-96-234, Responds to NRC Re Violations Noted in Insp Repts 50-335/96-11 & 50-389/96-11.Changes Were Made to Applicable Plant Preventive Maintenance & Surveillance Testing Procedures to Discontinue Practice of Lubricating + (18:27:08, 8 January 2025)
- L-96-263, Forwards Results of self-assessment Conducted from May to Sept 1996 Covering Areas of Safety Assessment/Corrective Actions,Operations,Engineering,Maint,Plant Support & Mgt Policies + (18:27:10, 8 January 2025)
- ML17229A061 + (18:27:10, 8 January 2025)
- ML17229A057 + (18:27:12, 8 January 2025)
- ML17229A056 + (18:27:13, 8 January 2025)
- ML17229A054 + (18:27:15, 8 January 2025)
- 05000335/LER-1996-012, :on 960831,manual Reactor Trip Occurred.Caused by Increased Gas Accumulation in 1B Main Transformer. Insp of 1B Main Transformer Cooling Sys Performed & Oil Cooler Replaced + (18:27:16, 8 January 2025)
- L-96-238, Forwards Affidavit That Replaces & Supersedes Affidavit Re Justification for Proprietary Nature of Appendix a to Attachment 1, Plant Specific Seismic Adequacy Implementation Procedure.. + (18:27:17, 8 January 2025)