Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17276B229 + (13:03:47, 8 January 2025)
- ML17276B227 + (13:03:48, 8 January 2025)
- ML17276B226 + (13:03:50, 8 January 2025)
- ML17276B224 + (13:03:52, 8 January 2025)
- ML17276B223 + (13:03:54, 8 January 2025)
- ML17276B222 + (13:03:56, 8 January 2025)
- ML17276B221 + (13:03:57, 8 January 2025)
- ML17276B220 + (13:03:59, 8 January 2025)
- ML17276B219 + (13:04:00, 8 January 2025)
- ML17276B218 + (13:04:02, 8 January 2025)
- ML17276B217 + (13:04:04, 8 January 2025)
- ML17276B215 + (13:04:05, 8 January 2025)
- ULNRC-06381, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (13:04:06, 8 January 2025)
- 0CAN051702, Units 1 and 2 - Annual Radiological Environmental Operating Report for 2016 + (13:04:08, 8 January 2025)
- ML17276B191 + (13:04:09, 8 January 2025)
- IR 05000454/2017007 + (13:04:34, 8 January 2025)
- ML17276B172 + (13:04:34, 8 January 2025)
- GO2-82-282, Forwards Turbine Missile Rept,Results of Probability Analyses of Disc Rupture, Methodology for Calculating Probability of Missile Generation & Turbine Missile Rept. Repts Available in Cental Files Only + (13:04:36, 8 January 2025)
- GO2-82-284, Advises That Refs 3.5-21,3.5-22 & 3.5-23 of Turbine Missile Analysis Are Being Transmitted Under Separate Cover as Proprietary Info,Per NRC 820226 Request.Tabulation of Pl Probabilities & Westinghouse Encl + (13:04:39, 8 January 2025)
- GO2-82-297, Confirms 820303 Telcon Re Standby Svc Water Sys Design & Commits to UHS Testing.Fsar Will Be Revised to Reflect Design Flow Rate of 10,300 Gpm + (13:04:41, 8 January 2025)
- GO2-82-298, Responds to 820303 Telcon Request for Info Re Facility Mitigation Capability.Pipe Break in SDV Piping Sys Low Probability Event W/Low Offsite Consequences.Tech Specs Will Be Submitted Prior to Fuel Load + (13:04:46, 8 January 2025)
- ML17276B145 + (13:04:48, 8 January 2025)
- ML17276B136 + (13:04:49, 8 January 2025)
- ML17276B133 + (13:04:50, 8 January 2025)
- GO2-82-265, Forwards Addl Info Re Control Room Chillers & One Oversize Drawing of Diesel Generator Exhaust Line Configuration Showing Tornado Missile Protection,Per NRC 820219 Request. Aperture Card Is Available in PDR + (13:04:51, 8 January 2025)
- ML17276B126 + (13:04:54, 8 January 2025)
- GO2-82-255, Forwards Table of Scenarios Verifying That Cable Cooling Sys Can Maintain Diesel Generator Cable Area within 115 F Limit,Per NRC 820222 Request + (13:04:55, 8 January 2025)
- ML17276B111 + (13:04:57, 8 January 2025)
- GO2-82-238, Discusses Ongoing Verification Test of Fuel Oil Transfer Pumps,Inservice Testing of Solenoid Operated Valves, Procuring Skid Mounted Oil Purification Unit & Correcting Diesel Exhaust Line Configurations to Tech Spec + (13:04:58, 8 January 2025)
- ML17276B107 + (13:05:01, 8 January 2025)
- ML17276B108 + (13:05:01, 8 January 2025)
- IR 05000397/1981021 + (13:05:02, 8 January 2025)
- ML17276B101 + (13:05:03, 8 January 2025)
- GO2-82-181, Forwards Response to Draft SER Concerns & Branch Meeting Issues + (13:05:04, 8 January 2025)
- GO2-82-215, Forwards Revised FSAR Section 3.10, Seismic & Dynamic Qualification of Safety-Related Instrumentation & Electrical Equipment. Changes Will Be Incorporated Into Amend 24 + (13:05:06, 8 January 2025)
- ML17276B098 + (13:05:08, 8 January 2025)
- GO2-82-169, Forwards Safety-Related Mechanical Equipment List:Seismic Qualification Info, in Response to 820208 Telcon W/Nrc + (13:05:09, 8 January 2025)
- ML17276B095 + (13:05:10, 8 January 2025)
- GO2-82-165, Confirms That 820113 Final Rept Re Control of Heavy Loads Encompasses or Exceeds Requirements Requested for Interim Response + (13:05:11, 8 January 2025)
- GO2-82-216, Confirms Telcon Re Heat Removal Capacity of Spent Fuel Pool Cooling Sys.Heat Exchanger Analysis Indicates That Fuel Pool Will Not Boil W/One Div of Fuel Pool Cooling + (13:05:13, 8 January 2025)
- ML17276B092 + (13:05:13, 8 January 2025)
- GO2-82-146, Forwards Amend 21 to Fsar.Affidavit Will Be Furnished within 10 Days of Filing to Reflect Distribution of Amend,Per 10CFR2.101 + (13:05:15, 8 January 2025)
- GO2-81-533, Forwards Responses to Auxiliary Sys Branch Questions 010.043 & 010.054 & Instrumentation & Control Sys Branch Questions 031.117,031.118 & 031.128.Responses Will Be Incorporated Into FSAR Amend + (13:05:17, 8 January 2025)
- GO2-82-161, Submits Info Re Surveillance Criteria That Will Be Used in Maint Program to Test Second Level Undervolatge Protective Relays,In Response to 820208 Telcon.Table Re non-class IE Loads & Proposed FSAR Changes Encl + (13:05:20, 8 January 2025)
- ML17276B073 + (13:05:21, 8 January 2025)
- GO2-81-523, Forwards marked-up Revised Response to Question 311.1 in Siting Analysis Branch .Minor Revisions Made in Followup to 811020 Site Visit Will Be Incorporated in FSAR Amend + (13:05:22, 8 January 2025)
- ML17276B071 + (13:05:24, 8 January 2025)
- GO2-81-525, Forwards Responses to NRC 811112 Request for Addl Financial info,810927 & 1227 Quarterly repts,1981 Annual Rept & Official Statement.Response Will Be Incorporated Into FSAR Amend within 2 Months + (13:05:25, 8 January 2025)
- GO2-82-138, Submits Addl Info Re Suppression Pool Temp Transient Analysis.Reactor Decay Heat Would Be Transferred to Suppression Pool in Event of Single Failure + (13:05:27, 8 January 2025)
- GO2-82-151, Forwards marked-up Response to Draft SER Concerns & Branch Meeting Issues,As Result of Discussions W/Nrc Reviewers + (13:05:29, 8 January 2025)
- GO2-82-148, Submits Addl Info Re Containment Protective Coatings,Per Telcon Request + (13:05:31, 8 January 2025)