Confirms Automatic Depressurization Sys Operation,Per Telcon W/T Collins.Valves Are Divided Into Div,Each W/ Separate Dc Station Battery
ML17276B092
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/11/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
References
GO2-160, NUDOCS 8202260175
Download: ML17276B092 (4)


Text

I REGULATORY I RMATION DISTRIBUTION SYSl (RIDS)

ACCESSION NBR ~ 8202260175 DOC ~ DATE: 82/02/11 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Projects Unit 2E Washington Public Powe 05000397

'AUTH BYNAME AUTHOR AFFILIATION BOUCHEY<G.D.

Is'ashington Public Power Supply System

'REC IP ~ NAME RECIPIENT AFFILIATION SCHWENCEREA ~

Licensing Branch 2

SUBJECT:

Confirms automatic depressurization sys operationiper telcon w/T Collins. Valves are divided into divEeach w/

separate dc stateion battery'ISTRIBUTION CODE:

B001S COPIES RECEIVED:LTR

"'ENCL, SIZE:

o j'ITLE:

PSAR/FSAR AMDTS and Related Correspondence NOTES:2 copies -all matl:PM'5000397 RECIPIENT ID CODE/NAME ACTION:

A/D LICENSNG LIC BR P2 LA INTERNAL: ELD IE/DEP/EPDB 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DSI/AEB 26 NRR/DSI/CP8 10 NRR/DSI/ETSB 12 NRR/DSI/PSB 19 NRR/DS I/RS8 23 04 EXTERNAL: ACRS 41 FEMA REP DIV -39 NRC PDR 0?

NTIS COPIES LTTR ENCL 1

1 1

1 3

2 1

1 1

1 1

1 1

1 1

1 16 1

1, 1

1 RECIPIENT ID CODE/NAME LIC BR 02 BC AULUCKPR ~

01 IE 06 IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28

'NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DSI/ASB 27 NRR/DS I/CSB 09 NRR/DSI/ICS8 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 BNL(AMDTS ONLY)

LPDR

03 NSIC 05 COPIES LTTR ENCL 3

3 1

2 1

1 1

1 1

1' 1

TOTAL NUMBER OP COPIES REQUIRESTTR Q

ENCL BP

I l

, l n

1 I

0 1

I I1'4 l

f l'I

i:.,8202260175 '82021 1 j.PPP,'- ADOCK 05000397

~"" A":,

PDR Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 February ll, 1982 G02-82-160 SS-L-02-PLP-82-004 Docket No. 50-397 Mr. A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 8PecP~@g Q

PE8 e~ ~~1Segg n~

at JP

Dear Mr. Schwencer:

Subject:

NUCLEAR PROJECT NO.

2 CONFIRMATION OF AUTOMATION DEPRESSURIZATION SYSTEM (ADS) OPERATION Per a telephone conversation with Mr. T. Collins (NRC staff) the following aspects of ADS operation are confirmed:

The ADS valves are divided into two (2) divisions, one division of three valves, the other of four valves.

In case of loss of normal air supply, two separate headers are supplied from the back up supply.

Each header has its own stepping programmer and its own bank of nitrogen bottles.

A one-hundred day supply is available for long term operation.

Each division of ADS valves is supplied from the corresponding D.C.

power division (station battery).

Therefore, a single electric failure cannot disable both ADS divisions.

~

No single mechanical or electrical failure can affect all seven ADS valves simultaneously.

Yery truly yours, G.

D. Bouch Deputy Director, Safety and Security PLP/jca cc:

R Auluck NRC WS Chin

- BPA T

Collins -

NRC R

Feil NRC Site

@is 9

(1I I

t, k

4 gu 7