Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-82-446, Provides Justification for Adequacy of Present Design Re Tornado Missile Protection for Diesel Generator Exhausts. New SRP Requirement Should Not Be Imposed.Removal of Item from SER Outstanding Issue List Requested.Rept Encl + (12:57:14, 8 January 2025)
- GO2-82-454, Forwards Revised Response to NRC Question 361.016 Re Ground Motion.Response Informally Transmitted on 820510 & Will Be Incorporated Into FSAR Amend 27 + (12:57:16, 8 January 2025)
- GO2-82-447, Transmits Results of Analysis of Remote Shutdown Sys to Close SER Open Item.Util Will Perform Listed Mods During First Refueling Outage + (12:57:18, 8 January 2025)
- GO2-82-436, Forwards Info Re Control Rod Drive Sys Line Break,Missile Protection of Equipment & UHS Capabilities During Seismic Tornado Events.Info Closes Out SER Outstanding Issue 1.7(28), Pipe Break in BWR Scram Sys + (12:57:20, 8 January 2025)
- GO2-82-409, Revises 810904 Response to NRC Re Violations Noted in IE Insp Rept 50-397/81-03.Requests Extension to 820730 to Make Corrective Actions,Incorporating Changes Into Spec Control List & Drawing Control List + (12:57:22, 8 January 2025)
- IR 05000397/1981003 + (12:57:24, 8 January 2025)
- GO2-82-422, Forwards Amend 23 to FSAR + (12:57:26, 8 January 2025)
- GO2-82-437, Forwards Transmittal Ltr & Certificate of Svc for Amend 23 to FSAR + (12:57:28, 8 January 2025)
- GO2-82-427, Forwards Revisions to Min Shift Crew & Staffing Plan, Reflecting 820208 Generic Ltr 82-02, Nuclear Power Plant Staff Working Hours, Guidelines + (12:57:30, 8 January 2025)
- GO2-82-421, Documents NRC Approval of ASME Code Case N-328, Thermit Brazing or Welding of Nonstructural Attachments, to Be Implemented on Nuclear Project 2 + (12:57:31, 8 January 2025)
- ML17276B431 + (12:57:34, 8 January 2025)
- ML17276B430 + (12:57:35, 8 January 2025)
- ML17276B428 + (12:57:36, 8 January 2025)
- GO2-82-400, Forwards Specific Discussions Supplementing FSAR W/Addl Geologic Info,Per Geosciences Branch Verbal Requests + (12:57:38, 8 January 2025)
- ML17276B425 + (12:57:45, 8 January 2025)
- ML17276B424 + (12:57:47, 8 January 2025)
- ML17276B421 + (12:57:48, 8 January 2025)
- ML17276B419 + (12:57:50, 8 January 2025)
- GO2-82-396, Submits Info in Response to SER Re FSAR Section 9.5.1,fire Protection Program.Keene Corp Concerning Burns & Roe Request for Info on Fire Rated Doors Encl + (12:57:51, 8 January 2025)
- ML17276B416 + (12:57:54, 8 January 2025)
- GO2-82-395, Forwards Revised Initial Response to NUREG-0803, Safety Concerns Associated W/Pipe Breaks in BWR Scram Sys + (12:57:55, 8 January 2025)
- ML17276B412 + (12:57:59, 8 January 2025)
- GO2-82-368, Confirms Info Re Sys Training & Procedures for Shift Support Supervisor,Per 820322 Telcon.Sys & Procedures Will Be Included in Simulator Training + (12:58:00, 8 January 2025)
- GO2-82-383, Forwards Corporate Organizational Changes Reflecting Planned Evolution as Operation Nears.Changes Will Be Reflected in Next FSAR Amend + (12:58:04, 8 January 2025)
- ML17276B407 + (12:58:08, 8 January 2025)
- ML17276B405 + (12:58:09, 8 January 2025)
- ML17276B401 + (12:58:12, 8 January 2025)
- ML17276B400 + (12:58:13, 8 January 2025)
- GO2-82-373, Forwards Transmittal Ltr & Certificate of Svc for Amend 22 to FSAR + (12:58:14, 8 January 2025)
- GO2-82-367, Advises That Decision Re Resolution of Vacuum Breaker Cycling Will Be Issued by 820715.Decision Pending Outcome of Generic Programs to Establish Structural Capacity of Vacuum Breakers for Mark II Facilities + (12:58:18, 8 January 2025)
- GO2-82-362, Forwards Study Results Re Comparison of Structural Response to Symmetric & Asymmetric Chugging & Seismic Loads.Results Show Similarity of Responses Between Load Cases + (12:58:43, 8 January 2025)
- GO2-82-351, Forwards Results of Recomputed Condensation Oscillation Load Analysis & Comparisons of Chugging & Load in Terms of Bldg Acceleration Response Spectra for Three Representative Critical Locations,In Response to NRC 820302 Request + (12:59:16, 8 January 2025)
- GO2-82-323, Forwards Public Version of Followup Emergency Plan Info Re Relation of Containment Radiation Levels to Core Damage,In Response to NRC 820208 Telcon Request + (12:59:38, 8 January 2025)
- ML17276B390 + (13:00:00, 8 January 2025)
- ML17276B385 + (13:00:00, 8 January 2025)
- ML17276B382 + (13:00:01, 8 January 2025)
- GO2-82-319, Submits Revised Response to NRC Re Violations Noted in IE Insp Repts 50-397/79-10 & 50-397/80-08. Corrective Actions:Piping post-weld Heat Treatment Will Follow Bechtel Procedures + (13:00:02, 8 January 2025)
- IR 05000397/1979010 + (13:00:06, 8 January 2025)
- ML17276B374 + (13:00:07, 8 January 2025)
- GO2-82-344, Forwards Review of Summary of Conformance to NRC Regulations of 10CFR20,50 & 100 + (13:00:09, 8 January 2025)
- GO2-82-237, Forwards Response to SER Question 23 Amending Util 820114 Response Re Criteria for balance-of-plant & NSSS Tables. Info Will Be Incorporated + (13:00:12, 8 January 2025)
- GO2-82-239, Forwards Revised FSAR Pages Describing Jet Area Based on Target Location to Replace Page 3.6-46 + (13:00:14, 8 January 2025)
- ML17276B367 + (13:00:16, 8 January 2025)
- GO2-82-327, Forwards Two Sections of Util 820201 Draft Tech Specs, Omitted Due to Duplication Errors + (13:00:19, 8 January 2025)
- GO2-82-324, Forwards Burns & Roe Review of BNL Comments Re Effects of Desynchronization Methodology Used in Generic & plant-unique Chugging Load Specs,Per Mark II Owners Group 820209 Meeting. Structural Responses Not Significant + (13:00:22, 8 January 2025)
- ML17276B348 + (13:00:25, 8 January 2025)
- GO2-82-314, Responds to 820305 Telcon.Submits Info Re Training Program for Shift Support Supervisor Per SER Open Items.Course Outlines for BWR Sys Analysis & Sys & Procedures Encl + (13:00:26, 8 January 2025)
- GO2-82-280, Forwards Schematic Re Various Supplies & Flow Paths for Facility Control Room Chillers Per 820226 Request.Control Room Cooling Sys Consists of Two Redundant Room Coolers & Chilled Water Supply Sys + (13:00:29, 8 January 2025)
- GO2-82-285, Responds to J Rosenthal 820219 Concerns Re on Rod Block Monitors.Rod Block Monitor Sys Design Is Similar to Zimmer Design.Facility Sys Has Been Reviewed & Resolution Provided + (13:00:30, 8 January 2025)
- GO2-82-281, Confirms Info Provided During 820301 Telcon Re Containment Instrument Air Sys Design Compliance W/Reg Guide 1.80 & ANSI Std MC11.1-1975.Sys Design Complies W/Reg Guide & Is Being Redesigned to Supply Nitrogen Gas from Cryogenic Source + (13:00:34, 8 January 2025)
- ML17276B340 + (13:01:10, 8 January 2025)