ML17276B405

From kanterella
Jump to navigation Jump to search
Forwards Ser.Several Issues Yet to Be Resolved W/Applicant. Resolution of All Open Items Required Prior to Decision on Issuance of OL for Unit 2.W/o Encl
ML17276B405
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/08/1982
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Shewmon P
Advisory Committee on Reactor Safeguards
Shared Package
ML17276B403 List:
References
NUDOCS 8204190475
Download: ML17276B405 (2)


Text

'I k

Docket No. 50-397 DISTRIBUTION:

Docket File 50-397 LBII2 File EHylton RAuluck A

hwencer Te esco Dr. Paul S.

Shewmon Chairman, Advisory Committee on Reactor Safeguards U.S. Nuclear Regulatory Commfssfo Washington, D.C.

20555

Dear Dr. Shewmon:

Subject:

Issuance of Safety Evaluatfo Repor I-) Washington Public Power Supply System (WPPSS)

Enclosed for review by the Commfttee are f teen (16) copies of the Safety Evaluation Report prepared by the 0 fce of Nuclear Reactor Regulation fn the matter of the applfcatfo filed by the WPPSS for license to operate the WNP-2.

At this time, twenty-,nine j (29) issues r afn utstandfng including THI-related issues.

These issues are fdentf fed fn Section 1.7 of the SER.

We anticipate that several of these wfl be reso ved fn the next few weeks.

The SER also does not address g ology and seismology issues.

We will repor t our findings fn this ar a fn a supp ement to this SER fn Duly 1982.

We will require the res lutfon of al open items prior to a decision on issuance of operatfn license for P-2.

S ncerely,

Enclosure:

Safety Evaluation Report (16)

Robert L. Tedesco Assistant Director fo Licensing Dfvfsfon of Licensing 8204190475 820408 PDR ADOCK 05000397 E

PDR OFFICEtT SURNAME/

DATEf DL:Lt42JLA f@%tpn.;kw..

3/) t/82 NRC FORM 318 u0.80) NRCM 0240 DL:LB 2/

0/g'jp/82 L:LBT"2/BC ASchwencer 3/

/82 OFFICIAL DL:AD/L RLTedesco 3/

/82 I

i.<ECG'RD GQPY USGPOT 1981~r96lT

'1

~

0