ML17276B412

From kanterella
Jump to navigation Jump to search
Confirms 820409 Telcon & Submits Several Recently Announced Organizational Changes
ML17276B412
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 04/19/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Haass W
Office of Nuclear Reactor Regulation
References
QA-82-153, NUDOCS 8204270423
Download: ML17276B412 (5)


Text

REGULATORINFORMATION DISTR ISUTION 'TEM (RIDE)

'AOCESSION NBR;8204270423 DOC ~ DATE: 82/04/1.9.

NOTARI'ZEDs NO DOCKET ¹

.FACIL:.50 '397 NPPSS Nuclear 'Pr ojeeti Unit 2i washington 'Publ)c Powe 05000397

'50 460 NPPSS Nuclear <<Projecti Uni,t i~ Nashington '-Public Powe 05000460 "STN.50.508 HPPSS Nuclear:Pr ojectr Unit 3i I<</ashington!Public 05000508

'AUTH NAME, AUTHOR AFFILIATION BOUCHEYtG,DE

'Hashi.ngton )Public !Power "Supply System RBCIP,l<AMK RECIPIENT AFFILIIATION HAASSiN,PE Qual i<<ty Assurance Br anch

SUBJECT:

<<Confir ms 820909 tel con.

8, submi ts several 'r.eceptly =announced organizational changes.

DI'STRIBUTION <<CODE:

YQObS

>COPIES <<RECEIVED:LTR, ENCL.J

SIZE,

.l, TITLE; Changes of <<Rensonnel/Address NOTES!'Standardized !Plant, 05000508 RECIPIENT ID CODE/NAME.

A/D LICENSNG 12

.LIC. BR ¹4 BC LIC BR ¹2 LA.04 LIC BR ¹3 l A 04 HERNANsR ~ '01 INT<<ERNAL~

ADM DI8ILVEST ASLB 09 08 EG.FILE 04 SB rCOPIES I'TTR ENCL 1

1 0

1 i

1 1

1

,1 1

1 1

1

~ 1 1

1

-RECIPIENT ID -CODE/NAME LIC BR ¹2 <<BC LIC BR ¹3 <<BC LIC BR ¹4 LA 04 AULUCKiR~

'01 NHKKLKRiL~

01 ASLAP 10 ELD "06 NRR/DL DIR RGN5

.COPIES L7TR KNCL 1

"0 1

0 1

1 1

1 1

1 1

1 1

1 1

~EXTERNAL: ACRS I.'P DR NTI' 13 03'5 1

1'2 1

1 INPOiJ,'STARNES NRC 'PDR 02 1

1 1

<<"TOTAL 'NUMBER OF 'COPIES REQUIRED; DTTR 25 ENCL 22

ll $

It ll, 4

4 1

V I

<<t h

1

<<f II a

tl 4

<<1 ftrl

)

4 L I'l. <<h>tl V

I gf<<

f I I I'

II <<1 tt II S 't

,g I I i r},

I<<

rh <<4 Q f f tr.l4ll'l l[)C i}I CI jl'"

h /

It tt hl tl'l P ht I

'i I 94i f httt Ill r

I 1

, lit tl Ptl tI ~

I /

R I

g t<<W<<3,

'hh

~e<<1 rt LL vrl ~

41 f II

,I S >>It<<44>>tiXr I V I

~

h I'I t

lr talf 4 f')Qlh< ~, < Il, 'll>>,, 'tt" t

t<<II lf 't, 4 0 "g l t )

t$

tt t<<1 IIN r5

~ fl)IN

) hh, II i+'1

'T Il I

t 1'>>'ll th tl f},)

4th I

4 0

4 gX 44'4 I

ff Tw t"

'Ill I ht 41 tk p

, I Il,,'}'I l

I 1

1 f"

I I 'I(

J K t, I(

'l lj 't4 lhI N

,7,,4,i II I 11

)t '

)

P, g 7 "tt I

4 t

, f

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 April 19, 1982 gA-82-153 Mr.

W. P.

Haass, Chief guality Assurance Branch Division of Engineering U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Haass:

8 8pQQg~~

9 App gq@

8 1g@g 1]

l'P'gg.

Pgry~~

roc

Subject:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM ORGANIZATIONAL CHANGES

Reference:

1)

Letter (dated January 14, 1982)

W.P.

Haass to G.D. Bouchey, "NRC Acceptance of Revised Washington Public Power Supply System's guality Assurance Topical Report".

2)

Revision 6 to the Operational

()uality Assurance Program Description (WPPSS-(A-004),

transmitted to you via G.D.

Bouchey/W.P.

Hasss letter gA-82-130 (dated Febrary 3, 1982).

As required by Reference 1

and committed to in Reference 2,

your office was informed by telephone on April 9, 1982, of several organizational changes which were recently announced by the Washington Public Power Supply System.

This letter con-firms the cited telephone conversation.

The current Supply System organization is presented in Attachment 1.

Major changes in the organizational responsibilities, relative to those described in Section 1 of the Operational guality Assurance Program Description (Rev. 6), are as follows:

1.

The Director of Power Generation reports to the Managing erector an ss response e

or the safe and efficient operation of Supply System nuclear power plants.

All Plant Managers and the WNP-2 Test

& Startup Manager now report to the Director of Power Generation.

2.

The Director of Projects reports to the Managing Director an ss response e

or he safe, successful and timely completion of construction of Supply System nuclear projects.

The Program Directors for Supply System nuclear projects WNP-l, WNP-2 and WNP-3 now report to the Director of Projects.

The Program Directors for WNP-1 and WNP-3 remain responsible for test and startup activities.

~so<

Mr. W.P.

Haass gA-82-153.

April 19 1982 Page 2

3.

The Director of Administration reports to the Managing irector an is responsi e

or providing records management support services.

These services were formerly provided by the Director of Business Programs.

The position of "Director, Business Programs" has been eliminated.

4.

The Chief Financial Officer reports to the Managing Director an is responsi e

or providing procurement-related support services.

These services were formerly provided by the Director of Business Programs.

The above described changes will be incorporated into Revision 7 of the Operational guality Assurance Program Description (WPPSS-(A-004).

Should you have any questions concerning the subject organi za-tional changes, please contact Mr. M.M. Monopoli, Manager, Oper ational guality Assurance at (509) 372-6838.

Very truly yours, G.

D. Bouchey Deputy Director, Safety

& Security sek Attachment cc:

NS Reynolds, Debevoise 8 Liberman RL Tedesco, NRC

REF:

(}A-82-153 G.D. Bouchey/W.P.

Haass Apri 1 19 1982 ATTACHMENT 1 SUPPLY SYSTEM ORGANIZATION RELATIVE TO OPERATIONAL EQUALITY ASSURANCE Managing Director Deputy Managing Director

Director, Power Generation
Director, Safety 5 "Security Deputy Director
Director, equality Assurance
Director, Administration
Director, Technology Chief Financial'fficer

'irector of Projects