Provides List of Principle Changes to Systematic Assessment of Licensee Performance Program for 800718-810630 & Forwards Final Rept for Second Cycle Assessment
ML17276B419
Person / Time
Site: Columbia 
Issue date: 04/29/1982
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17276B420 List:
References
NUDOCS 8205040761
Download: ML17276B419 (5)


Text

8205040761 820429 PDR ADQCK 05000397 A

PDR IZHQ PIIiEQgPg APg 29 1982 Docket No. 50-397 Washington Public'ower Supply System P. 0.

Box 968 3000 George Mashington May Richland, Mashington 99352 Attention:

Mr. R.

G. Matlock Program Director, MNP-2

@gfyg s ~gQP" t;tb,@@

~grAv

~ggggl ~g 8

]fan Gentlemen:

Subject:

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORI~IANCE FOR THE PERIOD OF MAY 1980 THROUGH JUNE 1982 1

In 1980, the NRC instituted a program for Systematic Assessment of Licensee Performance (SALP).

The NRC staff began collecting available observations

and, based on those observations, evaluating the performance of power reactor licensees (including construction permit holders) with respect to nuclear safety.

During the first annual cycle of this program, licensee performance was evaluated in two steps:

first, by a SALP Board in the appropriate NRC Regional Office; and then by a SALP Review Group at, NRC Headquarters.'he SALP Review Group produced a single report summarizing its assessments for power reactors throughout the U.S.

This report was issued in November 1981 (NUREG-0834, "Final Report, NkC Licensee Assessments" ).

Subsequently, a number of changes were made to the program.

The new program was published in the Federal Re 'ister on March 22, 1982.

and includes the following principa changes:

(1)

Adoption of regional level evaluations.

This eliminates review by the SALP Review Group at NRC Headquarters with its attendant national report while improving the timeliness of providing evalua-tion'esults.

(2)

Establishment of new evaluation criteria which are not dependent upon the average performance level.

(3)

Establishment of a process for taking licensee comments into account.

DESXGHATED ORIGIH I

0/'F ICE Q URNA ME/

OAVEP

~ ~ ~ ~

~

~

RV

~ ~ ~ ~ ~ ~ ~

.. AOQA$.mn....

4/gl/82 CR>d.)fied. SX ENGELKEN 4/ Af/82 BI OP

~ ~ ~ ~ ~ ~

~

~

~ ~ ~ ~ ~ ~

4/%/82

~ ~

~

~ ~ ~ ~ ~ ~ 1I

~

~ ~ ~ 0 ~

~ ~ ~ ~

0 ~

~ ~ ~ I ~

~ ~ ~ ~ ~ ~ ~ 0

~ ~

~

i ~

~

~ ~o( pE RC FORM 318110/801 NRCM 0240 OFFICIAL RECORD COPY

  • USGPO: 1980-329 824

<<I 4<

(

I H

F I

I,

Mashington Public Power Supply System gpss R~ gC The second annual cycle of the SALP program for the WNP-2 project covered the period of tray 1980 through June 1981 and used a combination of old and new assessment process.

The results of the second cycle assessment were discussed with you and members of your staff in meetings on September 17, 1981..

Enclosure (1) to this letter contains the final report for second cycle assessment.

This report has been modified to reflect the new evaluation criteria.

Should you have any questions concerning the enclosed report, we will be glad to discuss them with you.

grjgIMI~<R~

g. g, KggelkeS.

Enclosur e:

SALP Evaluation Report for Appraisal Period 5/80-6/81 cc i>/o enclosure:

C.

S.

Car lisle, Deputy Program

Manager, HNP-2 Project R.

B. Glasscock, guality Assurance Director G.

C. Sorensen R.

H. Engelken Regional Administrator bcc:

DMB/Document Control Desk (RI,DS)

Distributed by RV:

Engelken (w/o encl)

Resident Inspector State of MA (Lewis)

Ikf

  • I

~

I It I t<<

I I

~

'w"I' r.."I h

h

<< ~ r

  • , j h ~

I I

L

~

r

~ I "I

II h

I IF r I

I h

~ f<<to

~..

l c r

<<k<<

~

~ <<

~.1j

~ I tt h

h k II r, kf h'

rll I '$r h

<<4Itr k

F,t r

i( 'r h

II<<th J

'(

ll t

P I<<f ' I<<, I

~

I,W ~II

~

'I I

I If k

I I-I

<<A

~. M II ~

r

~ k f

k.

I I'

~ps AK0y V>

+

0 A.

I 0O I

R Vl O~

Cp 0 ++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIABOULEVARD SUITE 202, WALNUTCREEK PLAZA WALNUTCREEK, CAL'IFORNIA94696 October 1,

1981 MEMORANDUM FOR:.'.

H. Faulkenberry, Chief,, Reactor Construction Projects Branch

'\\

FROM:

'ALP Regional Evaluation, Review Board - WNP-2,.

SUBJECT:

NRC REGIONAL EVALUATION OF WASHINGTON NUCLEAR PROJECT NO.

2 (MNP-2)

'he Regional Evaluation. Review Board for lNP-2 met on August 18, 1981, to perform an evaluation of project activities for the period of Nay 1980 through June

'1981.

The. review" was conducted in accordance with NRC Draft Manual Chapter,051'6.

Enclosed. is a copy of the. assessment report..Section II.is an overall evaluation of site management.

.Section V is the action plan. recommended by the Board'for the. Regional Director,', concurrence.

R.

C.

ay es, Dep ty Director 0,

It,is the opinion of the Board, based on the results of.the review, that there has,been a substantial'improvement in'project management and controls and in the attitude of project personnel.towards quality.

However, the NRC has not had an opportunity to determine the effectiveness of these actions because of the time taken,'ome

.as a.result of false

. starts, by the licensee to complete task force assignments and release contractors for restart of safety-related work.

While the signs appear hopeful, our limited experience dictates that the licensee's performance rating does not warrant a change from last year.'s:

R. T. Dodds,

Chairman, Chief

,,J.

0.

in,.Reactor Inspector Projects Section 2,

RCPB A.

D. =Toth, Sr.

R sident Inspector P.

ist, Reactor Inspector J.

D.

Car son, Rea Qg nspector

Enclosure:

SALP Evaluation Report for Appraisal. Period 5/80-6'/81

. Au'fuck, Proj ct Manager, NRR