Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17277A640 + (12:36:04, 8 January 2025)
- GO2-83-590, Forwards Revised Vols 1-3 to Environ Equipment Qualification Rept for Safety-Related Equipment. Rev Provides Response to Concerns Raised in Suppl 3 to SER (NUREG-0892) + (12:36:05, 8 January 2025)
- GO2-83-552, Responds to SER Suppl 2 (NUREG-0892) & TMI Action Item II.K.3.28 Re Surveillance Requirements to Ensure Operability of back-up Air Supply Sys.Requirement on Calibr of Bottle Gauges Contested & Not Included in Tech Specs + (12:36:43, 8 January 2025)
- ML17277A636 + (12:37:09, 8 January 2025)
- GO2-83-521, Advises That NRC 830316 Proposed Commitment Re Turbine Maint Reviewed.Turbine Sys Maint Program Will Be Submitted for NRC Approval within 3 Yrs of Obtaining Ol.Ser Outstanding Issue 4 Considered Confirmatory Issue + (12:37:10, 8 January 2025)
- ML17277A632 + (12:37:45, 8 January 2025)
- ML17277A631 + (12:37:46, 8 January 2025)
- ML17277A630 + (12:37:47, 8 January 2025)
- ML17277A628 + (12:37:48, 8 January 2025)
- ML17277A626 + (12:37:48, 8 January 2025)
- ML17277A625 + (12:37:49, 8 January 2025)
- ML17277A624 + (12:37:51, 8 January 2025)
- GO2-83-557, Forwards Procedures for post-accident Sample Analysis & Core Damage Evaluation,Per NUREG-0892 (Ser),Item II.B.3 & Section 9.3.2.4.GE Interim Dissolved Gas Analysis W/O Krypton Tracer Expected by End of June 1983 + (12:37:52, 8 January 2025)
- GO2-83-523, Responds to NRC 830608 Telecopy Requesting Clarification of Three Areas of Util Preservice Insp Program.Clarification of Preservice Insp of Scram Discharge Vol Sys Encl + (12:38:31, 8 January 2025)
- GO2-83-522, Forwards Response to Request for Supporting Documentation & Per Tech Spec Second Draft Discussed During 830523-26 Meetings.Tentative Schedule for Preparation of Proof & Review Copy Listed + (12:39:16, 8 January 2025)
- GO2-83-525, Submits Lowest Svc Metal Temp Values for Most Limiting Pressure Boundary Components & Table for Theoretical Min Wall Thickness for Valves RFW-V-65A/B Based on Hydro Test Pressures Per GDC 51 + (12:39:20, 8 January 2025)
- GO2-83-530, Forwards Responses to NRC Telcon Questions Re B&R Technical Rept, Effect of Hydrodynamic Loads on Safety-Related Equipment & Piping Outside Containment, Transmitted by + (12:39:24, 8 January 2025)
- ML17277A616 + (12:39:27, 8 January 2025)
- GO2-83-541, Forwards Control Sys Failures Evaluation Rept, Inadvertently Omitted from 830610 Response to NRC Request for Info Re SER 3 Outstanding Issue 13 + (12:39:28, 8 January 2025)
- GO2-83-553, Recommends Deletion of All Refs to RHR Steam Condensing Sys from Encl Interim Deficiency Rept 216 Re RHR Relief Valve Vents.Steam Condensing Mode of RHR Sys Will Be Deactivated + (12:40:16, 8 January 2025)
- ML17277A609 + (12:40:37, 8 January 2025)
- ML17277A607 + (12:40:39, 8 January 2025)
- ML17277A606 + (12:40:40, 8 January 2025)
- GO2-83-509, Forwards Three Listed Repts to Expedite Resolution of SER Outstanding Issue 13 Re Control Sys Failures,In Response to NRC Questions 031.135,137 & 138 + (12:40:42, 8 January 2025)
- GO2-82-857, Forwards 12th Progress Rept Re Review of Completed safety-related Work,Per 800717 Commitments & Enforcement Action 80-20 Per Notice of Violation + (12:41:24, 8 January 2025)
- GO2-83-482, Requests Authorization to Use Encl ASME Code Case N-343, Alternative Scope of Exam of Attachment Welds for Exam Categories B-H,B-K-1 & CC Section Xi,Div 1. Rev 2 to Reg Guide 1.147 Will Include Code Case W/No Addl Requirements + (12:41:33, 8 January 2025)
- GO2-83-480, Forwards Addl Info Re Containment out-of-roundness,per 830419 Telcon Request.Ae Evaluation Concluded That Localized Reductions in Structural & Shielding Capacity of Biological Shield Wall Insignificant + (12:41:35, 8 January 2025)
- ML17277A598 + (12:41:37, 8 January 2025)
- ML17277A597 + (12:41:39, 8 January 2025)
- ML17277A596 + (12:42:24, 8 January 2025)
- ML17277A594 + (12:42:26, 8 January 2025)
- GO2-83-345, Forwards Descriptions of Responsibilities of Nuclear Safety Assurance Group,In Confirmation of 830209 Meeting.Encl Provides Revised Response to TMI Items I.B.1.2 & I.C.5 + (12:42:27, 8 January 2025)
- GO2-83-346, Forwards Proposed Schedule Re Current Status of Emergency Response Capability Per Region V 830301 Meeting (Generic Ltr 82-33 & Suppl 1 to NUREG-0737) + (12:42:44, 8 January 2025)
- GO2-83-433, Advises That Tech Spec 3/4.10.1, Primary Containment Integrity, Will Be Limiting Condition for Operation During Primary Containment Integrated Leak Rate Preoperational & Startup Testing Program + (12:42:47, 8 January 2025)
- ML17277A587 + (12:42:49, 8 January 2025)
- GO2-83-337, Clarifies Responses to NUREG-0612, Control of Heavy Loads. Turbine Crane MT-CRA-1 Meets Guidelines of NUREG + (12:42:50, 8 January 2025)
- ML17277A585 + (12:43:04, 8 January 2025)
- ML17277A583 + (12:43:05, 8 January 2025)
- ML17277A582 + (12:43:06, 8 January 2025)
- GO2-83-420, Forwards Burns & Roe Drawing H501 Defining Jurisdictional Boundary Between Nf & AISC for Supports.W/O Encl + (12:43:07, 8 January 2025)
- GO2-83-417, Forwards marked-up FSAR Pages Describing Equipment for Sampling & Monitoring Process & Effluent Streams During Postulated Accidents.Submittal Closes Out Commitment in Section 11.5.2 (Page 11-14) of SER,NUREG-0892 + (12:43:29, 8 January 2025)
- ML17277A576 + (12:43:58, 8 January 2025)
- GO2-83-277, Forwards Amend 29 to FSAR + (12:43:59, 8 January 2025)
- GO2-83-408, Responds to Re TMI Action Item II.K.3.18, Mods to ADS Sys Logic. One of Two Options (2 or 4) Will Be Implemented.Choice Based on Benefit to Design Impact on Schedule,Availability of Hardware & Analysis & Total Cost + (12:44:39, 8 January 2025)
- ML17277A568 + (12:45:09, 8 January 2025)
- GO2-83-401, Forwards Vol 4 to WPPSS Nuclear Project 2 Preservice Insp Program Plan,Summary Rept, Documenting Completion of Approx 98% of Volumetric & Surface Exams,Repairs & Replacements & Including Request for Relief PSI-2-001 + (12:45:10, 8 January 2025)
- ML17277A564 + (12:45:45, 8 January 2025)
- GO2-83-339, Forwards Summary Review of Actions Taken to Assure Quality of safety-related Const & to Meet Commitments Made to Commission in ,Per 10CFR50.54(f).Actions Included in Restart & Quality Verification Programs + (12:45:46, 8 January 2025)
- ML17277A561 + (12:45:52, 8 January 2025)
- GO2-83-326, Forwards Rev 2 to Electrical Separation Practices. FSAR Section 8.3.1.4 Will Be Revised to Incorporate Matl + (12:45:53, 8 January 2025)
- ML17277A558 + (12:45:57, 8 January 2025)