UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 APR 26 1983 XEH PXM COPY'EMORANDUM FOR:
FROM:
SUBJECT'eactor Construction Programs Branch R.
F. Heishman, Chief Reactor Construction
- Programs, Branch, gASIP IE TEAM ASSIGNMENTS'FOR WNP-2 INSPECTION The following Team Assignments supersede those contained in my memo dated April 15, 1983.
The Inspection dates remain the same.
Team Member Area of Assi nment W. Hansen R. Rohrbacher J. Elin (Part time)(R-V)
D. Ford*
W. Harini*
E. Herschoff gA 5 gC Inspector Effectivenes>..
Electrical, Instrumentation, and Controls Material Traceability, Maintenance, and Storage H.
Wong F. Pimentel*
E. Martindale*
K. Herring W. Albert (R-V)
R. Compton*
Welding and NDE I
~
Civil, Mechanical 8 Structural Construction Design Change Controls and Corrective Action Systems will be inspected in the technical disciplines.
Procurement will be inspected only as necessary to determine the requirements to be used as acceptance criteria.
I will act as team leader for this inspection.
- Indicates Consultant cc:
J. Taylor, IE J.
- Stone, IE M. Peranich
- Dodds, R-V 8305260255 830505 PDR ADOCK 05000397 8
PDR R.
F. Heishman, Chief Reactor Construction Programs