Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17277A661 + (12:33:52, 8 January 2025)
- ML17277A659 + (12:33:53, 8 January 2025)
- NL-17-1646, Snubber Program Plan for the Fourth Ten Year Inservice Testing Interval + (12:33:54, 8 January 2025)
- GO2-83-611, Forwards Proposed Snubber Tech Spec for Review as Followup to 830314 & 0624 Telcons.Changes Will Not Lessen Assurance of Structural Integrity & Functionality of safety-related Sys.Fuel Load Scheduled for Sept 1983 + (12:33:55, 8 January 2025)
- GO2-83-606, Revises Re GDC 51,based on Discussions & Agreements Reached at 830616 Meeting.Encl Provides Lowest Svc Metal Temp Values Superseding Values Previously Provided + (12:33:57, 8 January 2025)
- GO2-83-602, Informs That D Mazur Appointed New Managing Director, Effective 830516 + (12:34:28, 8 January 2025)
- GO2-83-597, Responds to Fire Protection Site Audit Concerns Noted in 830413 Trip Rept.Corrective Actions:Fire Detectors Installed,Instrument Racks Will Be Encl W/Concrete & Use of Automatic Sprinkler Sys Reevaluated + (12:34:57, 8 January 2025)
- GO2-83-550, Forwards WPPSS 2 Purge & Vent Valves Seismic & Hydrodynamic Analysis, Per SER Outstanding Issue 26 + (12:35:03, 8 January 2025)
- ML17277A643 + (12:35:26, 8 January 2025)
- GO2-83-584, Responds to NRC Request for Addl Info Re SER Confirmatory Issue 7, Component Supports. Results of Evaluation in Phase II Indicate That 175 Supports & 16 Anchors Acceptable + (12:35:28, 8 January 2025)
- ML17277A640 + (12:36:04, 8 January 2025)
- GO2-83-590, Forwards Revised Vols 1-3 to Environ Equipment Qualification Rept for Safety-Related Equipment. Rev Provides Response to Concerns Raised in Suppl 3 to SER (NUREG-0892) + (12:36:05, 8 January 2025)
- GO2-83-552, Responds to SER Suppl 2 (NUREG-0892) & TMI Action Item II.K.3.28 Re Surveillance Requirements to Ensure Operability of back-up Air Supply Sys.Requirement on Calibr of Bottle Gauges Contested & Not Included in Tech Specs + (12:36:43, 8 January 2025)
- ML17277A636 + (12:37:09, 8 January 2025)
- GO2-83-521, Advises That NRC 830316 Proposed Commitment Re Turbine Maint Reviewed.Turbine Sys Maint Program Will Be Submitted for NRC Approval within 3 Yrs of Obtaining Ol.Ser Outstanding Issue 4 Considered Confirmatory Issue + (12:37:10, 8 January 2025)
- ML17277A632 + (12:37:45, 8 January 2025)
- ML17277A631 + (12:37:46, 8 January 2025)
- ML17277A630 + (12:37:47, 8 January 2025)
- ML17277A628 + (12:37:48, 8 January 2025)
- ML17277A626 + (12:37:48, 8 January 2025)
- ML17277A625 + (12:37:49, 8 January 2025)
- ML17277A624 + (12:37:51, 8 January 2025)
- GO2-83-557, Forwards Procedures for post-accident Sample Analysis & Core Damage Evaluation,Per NUREG-0892 (Ser),Item II.B.3 & Section 9.3.2.4.GE Interim Dissolved Gas Analysis W/O Krypton Tracer Expected by End of June 1983 + (12:37:52, 8 January 2025)
- GO2-83-523, Responds to NRC 830608 Telecopy Requesting Clarification of Three Areas of Util Preservice Insp Program.Clarification of Preservice Insp of Scram Discharge Vol Sys Encl + (12:38:31, 8 January 2025)
- GO2-83-522, Forwards Response to Request for Supporting Documentation & Per Tech Spec Second Draft Discussed During 830523-26 Meetings.Tentative Schedule for Preparation of Proof & Review Copy Listed + (12:39:16, 8 January 2025)
- GO2-83-525, Submits Lowest Svc Metal Temp Values for Most Limiting Pressure Boundary Components & Table for Theoretical Min Wall Thickness for Valves RFW-V-65A/B Based on Hydro Test Pressures Per GDC 51 + (12:39:20, 8 January 2025)
- GO2-83-530, Forwards Responses to NRC Telcon Questions Re B&R Technical Rept, Effect of Hydrodynamic Loads on Safety-Related Equipment & Piping Outside Containment, Transmitted by + (12:39:24, 8 January 2025)
- ML17277A616 + (12:39:27, 8 January 2025)
- GO2-83-541, Forwards Control Sys Failures Evaluation Rept, Inadvertently Omitted from 830610 Response to NRC Request for Info Re SER 3 Outstanding Issue 13 + (12:39:28, 8 January 2025)
- GO2-83-553, Recommends Deletion of All Refs to RHR Steam Condensing Sys from Encl Interim Deficiency Rept 216 Re RHR Relief Valve Vents.Steam Condensing Mode of RHR Sys Will Be Deactivated + (12:40:16, 8 January 2025)
- ML17277A609 + (12:40:37, 8 January 2025)
- ML17277A607 + (12:40:39, 8 January 2025)
- ML17277A606 + (12:40:40, 8 January 2025)
- GO2-83-509, Forwards Three Listed Repts to Expedite Resolution of SER Outstanding Issue 13 Re Control Sys Failures,In Response to NRC Questions 031.135,137 & 138 + (12:40:42, 8 January 2025)
- GO2-82-857, Forwards 12th Progress Rept Re Review of Completed safety-related Work,Per 800717 Commitments & Enforcement Action 80-20 Per Notice of Violation + (12:41:24, 8 January 2025)
- GO2-83-482, Requests Authorization to Use Encl ASME Code Case N-343, Alternative Scope of Exam of Attachment Welds for Exam Categories B-H,B-K-1 & CC Section Xi,Div 1. Rev 2 to Reg Guide 1.147 Will Include Code Case W/No Addl Requirements + (12:41:33, 8 January 2025)
- GO2-83-480, Forwards Addl Info Re Containment out-of-roundness,per 830419 Telcon Request.Ae Evaluation Concluded That Localized Reductions in Structural & Shielding Capacity of Biological Shield Wall Insignificant + (12:41:35, 8 January 2025)
- ML17277A598 + (12:41:37, 8 January 2025)
- ML17277A597 + (12:41:39, 8 January 2025)
- ML17277A596 + (12:42:24, 8 January 2025)
- ML17277A594 + (12:42:26, 8 January 2025)
- GO2-83-345, Forwards Descriptions of Responsibilities of Nuclear Safety Assurance Group,In Confirmation of 830209 Meeting.Encl Provides Revised Response to TMI Items I.B.1.2 & I.C.5 + (12:42:27, 8 January 2025)
- GO2-83-346, Forwards Proposed Schedule Re Current Status of Emergency Response Capability Per Region V 830301 Meeting (Generic Ltr 82-33 & Suppl 1 to NUREG-0737) + (12:42:44, 8 January 2025)
- GO2-83-433, Advises That Tech Spec 3/4.10.1, Primary Containment Integrity, Will Be Limiting Condition for Operation During Primary Containment Integrated Leak Rate Preoperational & Startup Testing Program + (12:42:47, 8 January 2025)
- ML17277A587 + (12:42:49, 8 January 2025)
- GO2-83-337, Clarifies Responses to NUREG-0612, Control of Heavy Loads. Turbine Crane MT-CRA-1 Meets Guidelines of NUREG + (12:42:50, 8 January 2025)
- ML17277A585 + (12:43:04, 8 January 2025)
- ML17277A583 + (12:43:05, 8 January 2025)
- ML17277A582 + (12:43:06, 8 January 2025)
- GO2-83-420, Forwards Burns & Roe Drawing H501 Defining Jurisdictional Boundary Between Nf & AISC for Supports.W/O Encl + (12:43:07, 8 January 2025)
- GO2-83-417, Forwards marked-up FSAR Pages Describing Equipment for Sampling & Monitoring Process & Effluent Streams During Postulated Accidents.Submittal Closes Out Commitment in Section 11.5.2 (Page 11-14) of SER,NUREG-0892 + (12:43:29, 8 January 2025)