Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17277B583 + (12:08:21, 8 January 2025)
- ML17277B578 + (12:08:25, 8 January 2025)
- ML17277B576 + (12:08:26, 8 January 2025)
- ML17277B575 + (12:08:28, 8 January 2025)
- GO2-84-655, Confirms 841212 Telcon Re NRC Acceptance of 850118 as New Submittal Date for Addl Info Concerning BWR Owners Group Response to NUREG-0737,Item II.D.1 + (12:08:29, 8 January 2025)
- GO2-84-653, Informs That Three Shield Walls Completed,Per Condition 2.C(11) of Amend 7 to License NPF-21 as Amended by NRC + (12:08:31, 8 January 2025)
- ML17277B572 + (12:08:34, 8 January 2025)
- GO2-84-652, Application for Amend to License NPF-21,revising Tech Specs 3.6.1.3 & 4.6.1.3 Re Primary Containment Airlocks & Surveillance Requirements,Respectively.Fee Paid + (12:08:35, 8 January 2025)
- ML17277B571 + (12:08:35, 8 January 2025)
- GO2-84-651, Informs That BPA Obligated to Pay Total Annual Costs of Plant Through Mechanism of Encl Net Billing Agreement as Stated in Encl to Doe.Compliance w/10CFR140.21 Satisfied + (12:08:38, 8 January 2025)
- ML17277B559 + (12:08:41, 8 January 2025)
- ML17277B557 + (12:08:42, 8 January 2025)
- GO2-84-639, Forwards Rev 4 to Emergency Preparedness Plan,Incorporating Comments & Critiques from Recent Drills & Major Plant Exercise + (12:08:43, 8 January 2025)
- GO2-84-644, Advises That Emergency Cable Cooling Sys Performance Reevaluated Using as-built Heat Loads Instead of Design Assumptions.Fsar Will Be Updated to Reflect Calculations + (12:08:49, 8 January 2025)
- GO2-84-633, Requests Concurrence w/850918 Schedule for Annual Emergency Exercise,Per 841115 Meeting W/Nrc & Other Region V Utils. Enforcement Action Not Appropriate,Since Date Recommended by Region V + (12:09:34, 8 January 2025)
- ML17277B548 + (12:10:06, 8 January 2025)
- GO2-84-636, Informs of Withdrawal of Lewis & Douglas Co Public Util Districts from Wppss.Action Follows Earlier Withdrawal of Three Other Public Util Districts.Supply Sys Membership Now Consists of 18 Public Agencies + (12:10:08, 8 January 2025)
- ML17277B546 + (12:10:24, 8 January 2025)
- GO2-84-617, Advises That Review of Reactor Vessel Water Level Instrumentation in Response to NUREG-0737,Item II.F.2 & Generic Ltr 84-23 Completed.License Condition 9 Re Inadequate Core Cooling Instrumentation Analysis Satisfied + (12:10:26, 8 January 2025)
- GO2-84-591, Forwards full-size Blue Lines of 21 Drawings Contained in Section 6.0 of Pump & Valve Test Program,In Response to 841108 Telcon Between Jl Page & Tf Hoyle.W/O Encl + (12:10:29, 8 January 2025)
- GO2-84-582, Discusses Util Approach to Updating Fsar,Per 10CFR50.71(e). Replacement Pages Will Be Provided in Dec 1985 to Reflect as-built Plant Up to June 1985.Complete FSAR Rewrite Not Necessary for Recently Licensed Plants + (12:10:32, 8 January 2025)
- GO2-84-581, Informs That Emergency Operating Procedures Guidelines Generation Package Will Be Revised to Provide Specific Identification of Reactor Pressure Vessel Water Level Instrumentation + (12:10:34, 8 January 2025)
- ML17277B534 + (12:10:38, 8 January 2025)
- GO2-84-560, Forwards Rev 1 to WNP-2 Licensed Operator Requalification Program Description for Wppss. Rev Incorporates Changes as Result of Telefaxed Comments & 841001 Telcon Between MR Auluck & D Shum of NRC & Mj Wyrick & P Powell + (12:10:39, 8 January 2025)
- GO2-84-544, Submits Changes in Board of Directors. K Cochrane Elected New President,P Knight Vice President & R Colbert & L Powell Elected to Fill Executive Board + (12:10:42, 8 January 2025)
- ML17277B528 + (12:10:45, 8 January 2025)
- ML17277B527 + (12:10:47, 8 January 2025)
- ML17277B525 + (12:10:50, 8 January 2025)
- ML17277B524 + (12:10:52, 8 January 2025)
- GO2-84-541, Forwards Feedwater Piping Thermal Deflection Events, Final Design Engineering Rept + (12:10:53, 8 January 2025)
- ML17277B521 + (12:10:56, 8 January 2025)
- SBK-L-17155, 8 - Response to Request for Additional Information for the Review of the License Renewal Application - Building Deformation Analyses Related to Concrete Alkali-Silica Reaction + (12:10:58, 8 January 2025)
- GO2-84-540, Discusses Need for Shift Advisors Following Plant Heatup. Advisors Presently Unnecessary,Based on Industry Working Group 840224 Proposal.Senior Reactor Operators Will Satisfy Criteria of License Condition 15 + (12:12:17, 8 January 2025)
- GO2-84-542, Confirms Submittal Date of 841219 for Addl Info Re Response to NUREG-0737,Item II.D.1,agreed Upon During 841011 Telcon + (12:12:19, 8 January 2025)
- GO2-84-535, Submits Supplemental Info Re 840815 Request for Amend to Licensing Condition 2.C.(11)concerning Shield Wall Deferral. Workers Will Not Be Required to Enter Areas in Vicinity of Deferred Shielding to Mitigate Action Following LOCA + (12:12:21, 8 January 2025)
- GO2-84-515, Submits Understanding Re Acceptability to Transfer Sealed Neutron Sources Belonging to Unit 3 to Unit 2 for Storage Under Authority of License NPF-21 + (12:12:23, 8 January 2025)
- GO2-84-534, Forwards Addl Info Re Safety Parameter Display Sys,In Response to NRC 840810 Request Re Suppl 1 to NUREG-0737 + (12:12:25, 8 January 2025)
- GO2-84-524, Responds to 840702 Generic Ltr 84-15 Re Diesel Generator Reliability.Facility Meets or Exceeds Commission Intent for Diesel Generator Increased Reliability Program.Fast Cold Starting Not Applicable + (12:12:28, 8 January 2025)
- ML17277B507 + (12:12:28, 8 January 2025)
- GO2-84-525, Advises That Three Public Util Districts Withdrew from Supply Sys.Districts Cited Concerns Re Renewing or Obtaining Liability Insurance for Officers & Directors in Supply Sys Related Lawsuits + (12:12:30, 8 January 2025)
- ML17277B502 + (12:12:34, 8 January 2025)
- GO2-84-521, Informs That All Plant Personnel Directed to Verify Accuracy of Statements.Compliance Engineer Will Establish Followup Action Tracking Process for Uncompleted Commitments Re Notice of Violation Responses,Per Insp Rept 50-397/84-15 + (12:12:35, 8 January 2025)
- GO2-84-467, Requests Approval to Apply ASME Section III Code Case N-341 to ASME Section XI Certification activities.Five-yr Certification Provision Incorporated Into Section XI 1983 Edition But Not Yet Approved + (12:12:37, 8 January 2025)
- GO2-84-512, Discuss GE Recommendations Re Hatch Unit 2 Event Concerning Large Crack in Torus Vent Header Due to Brittle Fracture,Per GE 840214 Info Ltr 402.Only Recommendations 1 & 2 Apply,As Sys Not Yet Used to Inert Containment + (12:12:40, 8 January 2025)
- GO2-84-498, Provides Clarification of Planned Surveillance Concerning Amend 3 to License NPF-21,permitting Suspension of Provisions of Tech Spec 3.6.6.2 Re Drywell & Suppression Chamber Oxygen Concentration + (12:12:42, 8 January 2025)
- GO2-84-497, Submits Supplemental Info Re Request for Amend to License Condition 2.C(11) Re Shield Wall Deferral.Deferral of Walls & Window Will Not Involve Significant Increase in Probability of Previously Evaluated Accident + (12:12:44, 8 January 2025)
- GO2-84-495, Advises of Recent Development Re Fire Protection Analysis & Methods of Maintaining Approved Fire Protection Program. Preliminary Review Identified Areas Where Documentation of Assumptions & Bases Incomplete + (12:12:47, 8 January 2025)
- ML17277B488 + (12:12:50, 8 January 2025)
- ML17277B487 + (12:12:51, 8 January 2025)
- GO2-84-398, Provides Addl Info in Support of 831215 Request for Amend to License NPF-21,extending Special Test Exception 3/4.10.5, Oxygen Concentration, for Remainder of Power Ascension Test Program + (12:12:52, 8 January 2025)
- ML17277B482 + (12:13:02, 8 January 2025)