Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17277B617 + (12:07:44, 8 January 2025)
- ML17277B610 + (12:07:45, 8 January 2025)
- GO2-85-052, Submits Response to Generic Ltr 84-24 Re Equipment Environ Qualification Program.Ie Bulletin 82-04 Response Completed. Other Info Notices Presently Being Evaluated + (12:07:46, 8 January 2025)
- GO2-85-047, Forwards Response to 841219 Telcon Addressing Sandia Recommendations for Improvement in Human Factor Engineering of BWR Owners Group Graphic Display Sys.Discussion of Signal Validation Logic Also Encl + (12:07:48, 8 January 2025)
- GO2-85-049, Submits Supplemental Info to Assist NRC in Review of 841220 Request for Amend to Tech Specs for Primary Containment Air Locks.Requested Amend Does Not Involve Significant Reduction in Margin of Safety Due to Leak Tightness Requirement + (12:07:50, 8 January 2025)
- GO2-85-048, Application for Amend to License NPF-21,changing Condition 28 Deadline for Environ Qualification of Electrical Equipment Per 10CFR50.49 from 850331 to 1130. Equipment Justification Encl + (12:07:52, 8 January 2025)
- GO2-85-032, Notifies That Recent Followup to Util 830119 Request for Approval of 1-yr Retention Period for Radiation Exposure Records Used in Preparing Form NRC-4 Shows No Record of NRC Response.Immediate Action Requested + (12:07:54, 8 January 2025)
- ML17277B600 + (12:07:54, 8 January 2025)
- GO2-85-025, Forwards Payment Requested in NRC for 840120 Application to Amend License NPF-21 + (12:07:57, 8 January 2025)
- GO2-85-024, Forwards Response to 840914 Request for Addl Info Re BWR Owners Group Response to NUREG-0737,Item II.D.1,addressed in NEDE-24988-P Re Analysis of Safety/Relief Valve Operability + (12:07:59, 8 January 2025)
- GO2-85-021, Application to Amend License NPF-21,extending Required Date for 30 Days to Replace Electrical Equipment.Amend Due to Design Changes,Delays in Procurement,Test Complications & Installation Problems.Fee Paid + (12:08:02, 8 January 2025)
- GO2-85-014, Application for Amend to License NPF-21,consisting of Change to License Condition 16 Incorporating Requirements of Reg Guide 1.97,Rev 2 for Flux Monitoring Following First Refueling Outage.Fee Paid + (12:08:07, 8 January 2025)
- GO2-85-022, Requests Increase in Allowable Usage Factor for Reactor Feedwater Piping Between Containment Isolation Valves RFW-V-10A (B) & RFW-V-32A (B).Relaxation of Fatigue Limit Can Be Adopted W/O Jeopardizing Structural Integrity + (12:08:10, 8 January 2025)
- GO2-85-023, Notifies That Extensive Subcomponent Radiation & Thermal Test Being Conducted to Determine If Subcomponent Failure Due to Mfg Defect or Common Mode,Per Reg Guide 1.97 + (12:08:12, 8 January 2025)
- GO2-85-011, Forwards Summary of Addl Event Demonstrating Stratification W/O Reactor Water Cleanup Backflow in Horizontal Piping Downstream of Vertical Pipe Runs & in Other Portions of Reactor Feedwater Piping + (12:08:14, 8 January 2025)
- ML17277B588 + (12:08:18, 8 January 2025)
- ML17277B587 + (12:08:19, 8 January 2025)
- ML17277B585 + (12:08:20, 8 January 2025)
- GO2-84-669, Forwards DW Mazur Establishing 841213 as Official Date of Commercial Operation for Facility + (12:08:21, 8 January 2025)
- ML17277B583 + (12:08:21, 8 January 2025)
- ML17277B578 + (12:08:25, 8 January 2025)
- ML17277B576 + (12:08:26, 8 January 2025)
- ML17277B575 + (12:08:28, 8 January 2025)
- GO2-84-655, Confirms 841212 Telcon Re NRC Acceptance of 850118 as New Submittal Date for Addl Info Concerning BWR Owners Group Response to NUREG-0737,Item II.D.1 + (12:08:29, 8 January 2025)
- GO2-84-653, Informs That Three Shield Walls Completed,Per Condition 2.C(11) of Amend 7 to License NPF-21 as Amended by NRC + (12:08:31, 8 January 2025)
- ML17277B572 + (12:08:34, 8 January 2025)
- GO2-84-652, Application for Amend to License NPF-21,revising Tech Specs 3.6.1.3 & 4.6.1.3 Re Primary Containment Airlocks & Surveillance Requirements,Respectively.Fee Paid + (12:08:35, 8 January 2025)
- ML17277B571 + (12:08:35, 8 January 2025)
- GO2-84-651, Informs That BPA Obligated to Pay Total Annual Costs of Plant Through Mechanism of Encl Net Billing Agreement as Stated in Encl to Doe.Compliance w/10CFR140.21 Satisfied + (12:08:38, 8 January 2025)
- ML17277B559 + (12:08:41, 8 January 2025)
- ML17277B557 + (12:08:42, 8 January 2025)
- GO2-84-639, Forwards Rev 4 to Emergency Preparedness Plan,Incorporating Comments & Critiques from Recent Drills & Major Plant Exercise + (12:08:43, 8 January 2025)
- GO2-84-644, Advises That Emergency Cable Cooling Sys Performance Reevaluated Using as-built Heat Loads Instead of Design Assumptions.Fsar Will Be Updated to Reflect Calculations + (12:08:49, 8 January 2025)
- GO2-84-633, Requests Concurrence w/850918 Schedule for Annual Emergency Exercise,Per 841115 Meeting W/Nrc & Other Region V Utils. Enforcement Action Not Appropriate,Since Date Recommended by Region V + (12:09:34, 8 January 2025)
- ML17277B548 + (12:10:06, 8 January 2025)
- GO2-84-636, Informs of Withdrawal of Lewis & Douglas Co Public Util Districts from Wppss.Action Follows Earlier Withdrawal of Three Other Public Util Districts.Supply Sys Membership Now Consists of 18 Public Agencies + (12:10:08, 8 January 2025)
- ML17277B546 + (12:10:24, 8 January 2025)
- GO2-84-617, Advises That Review of Reactor Vessel Water Level Instrumentation in Response to NUREG-0737,Item II.F.2 & Generic Ltr 84-23 Completed.License Condition 9 Re Inadequate Core Cooling Instrumentation Analysis Satisfied + (12:10:26, 8 January 2025)
- GO2-84-591, Forwards full-size Blue Lines of 21 Drawings Contained in Section 6.0 of Pump & Valve Test Program,In Response to 841108 Telcon Between Jl Page & Tf Hoyle.W/O Encl + (12:10:29, 8 January 2025)
- GO2-84-582, Discusses Util Approach to Updating Fsar,Per 10CFR50.71(e). Replacement Pages Will Be Provided in Dec 1985 to Reflect as-built Plant Up to June 1985.Complete FSAR Rewrite Not Necessary for Recently Licensed Plants + (12:10:32, 8 January 2025)
- GO2-84-581, Informs That Emergency Operating Procedures Guidelines Generation Package Will Be Revised to Provide Specific Identification of Reactor Pressure Vessel Water Level Instrumentation + (12:10:34, 8 January 2025)
- ML17277B534 + (12:10:38, 8 January 2025)
- GO2-84-560, Forwards Rev 1 to WNP-2 Licensed Operator Requalification Program Description for Wppss. Rev Incorporates Changes as Result of Telefaxed Comments & 841001 Telcon Between MR Auluck & D Shum of NRC & Mj Wyrick & P Powell + (12:10:39, 8 January 2025)
- GO2-84-544, Submits Changes in Board of Directors. K Cochrane Elected New President,P Knight Vice President & R Colbert & L Powell Elected to Fill Executive Board + (12:10:42, 8 January 2025)
- ML17277B528 + (12:10:45, 8 January 2025)
- ML17277B527 + (12:10:47, 8 January 2025)
- ML17277B525 + (12:10:50, 8 January 2025)
- ML17277B524 + (12:10:52, 8 January 2025)
- GO2-84-541, Forwards Feedwater Piping Thermal Deflection Events, Final Design Engineering Rept + (12:10:53, 8 January 2025)
- ML17277B521 + (12:10:56, 8 January 2025)
- SBK-L-17155, 8 - Response to Request for Additional Information for the Review of the License Renewal Application - Building Deformation Analyses Related to Concrete Alkali-Silica Reaction + (12:10:58, 8 January 2025)
- GO2-84-540, Discusses Need for Shift Advisors Following Plant Heatup. Advisors Presently Unnecessary,Based on Industry Working Group 840224 Proposal.Senior Reactor Operators Will Satisfy Criteria of License Condition 15 + (12:12:17, 8 January 2025)