Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:63934 + (10:57:18, 8 January 2025)
- ML17285A480 + (10:57:19, 8 January 2025)
- ML17285A482 + (10:57:19, 8 January 2025)
- ML17285A479 + (10:57:20, 8 January 2025)
- GO2-89-089, Forwards Update of Status Sheets Used to Track Items/Issues Identified During Mar & Apr 1989 NRC SSOMI at Plant.Items Include 125-volt Dc Battery Life Calculations & Change from Automatic to Manual Intake Valve Operation in Control Room + (10:57:21, 8 January 2025)
- GO2-89-095, Part 21 Rept Re Defects in Target Rock Actuator Kits (Part 300562-1).Initially Reported on 890516.Defects Noted in Cold Solder Condition,Insufficient Solder Joints & Failed Solder Joints.Defective Kits Returned to Mfg for Repair + (10:57:22, 8 January 2025)
- ML17285A474 + (10:57:24, 8 January 2025)
- TAC:69299 + (10:57:24, 8 January 2025)
- GO2-89-087, Suppls Response to NRC Re Violations Noted in Insp Rept 50-397/87-26.Corrective Actions:All Associated Master Data Sheets Revised + (10:57:25, 8 January 2025)
- ML17285A472 + (10:57:25, 8 January 2025)
- ML17285A470 + (10:57:27, 8 January 2025)
- ML17285A468 + (10:57:28, 8 January 2025)
- ML17285A467 + (10:57:29, 8 January 2025)
- ML17285A466 + (10:57:29, 8 January 2025)
- ML17285A465 + (10:57:30, 8 January 2025)
- ML17285A463 + (10:57:31, 8 January 2025)
- ML17285A460 + (10:57:32, 8 January 2025)
- ML17285A462 + (10:57:32, 8 January 2025)
- ML17285A457 + (10:57:33, 8 January 2025)
- ML17285A459 + (10:57:33, 8 January 2025)
- ML17285A455 + (10:57:34, 8 January 2025)
- 05000397/LER-1988-030-01, Forwards LER 88-030-01.Rept Submitted Per Commitment in Response to Violation B Noted in Insp Rept 50-397/88-24 + (10:57:35, 8 January 2025)
- ML17285A449 + (10:57:36, 8 January 2025)
- GO2-89-074, Radiological Environ Monitoring Program 1988 Annual Rept for Nuclear Plant 2 + (10:57:37, 8 January 2025)
- ML17285A447 + (10:57:38, 8 January 2025)
- ML17285A445 + (10:57:39, 8 January 2025)
- ML17285A438 + (10:57:40, 8 January 2025)
- 05000397/LER-1988-030, :on 880825 & 26,full Reactor Protection Sys (RPS) Actuations Occurred.Caused by Switch Overtravel.Rps Power Supply Select Switch Returned to Normal Position & Scram Reset + (10:57:43, 8 January 2025)
- GO2-89-070, Part 21 Rept Re Defect in Limitorque Valve Motor Operator Model SMB-2 W/Soft Worm Shaft Clutch Gear Assembly.Caused by Failure to Install Split Spacer of Worm Shaft Clutch Gear assembly.Safety-related Valves Manually Operated + (10:57:44, 8 January 2025)
- GO2-89-069, Forwards Application to Amend License NPF-21,authorizing Onsite Disposal of Very Low Level Radwaste by Burying Eight Moisture Separator Reheater Tube Bundles W/Associated Assemblies & Four Small Spools of Piping + (10:57:46, 8 January 2025)
- GO2-89-072, Supply Sys Nuclear Plant 2 Annual Environ Operating Rept 1988 + (10:57:47, 8 January 2025)
- ML17285A427 + (10:57:49, 8 January 2025)
- 05000397/LER-1989-009, :on 880529,full Reactor Protection Sys Actuation Occurred Twice During Performance Testing.Caused by Inadequate Preoperational Test & trouble-shooting Procedures.Preoperational Procedure Revised + (10:57:50, 8 January 2025)
- IR 05000397/1989008 + (10:57:54, 8 January 2025)
- ML17285A421 + (10:57:55, 8 January 2025)
- IR 05000397/1989010 + (10:57:56, 8 January 2025)
- ML17285A418 + (10:57:57, 8 January 2025)
- GO2-89-065, Forwards Amends 3,4,& 5 to Offsite Dose Calculation Manual Re Tech Spec Section 6.14.2a, Administrative Controls. Amends Cover Semiannual Reporting Requirements & near-field Dilution Factor + (10:57:58, 8 January 2025)
- IR 05000397/1989009 + (10:58:00, 8 January 2025)
- 05000397/LER-1989-007, :on 890316,discovered That Two Tech Spec Surveillance Procedures Re Fire Protection Zones for Standby Svc Water Pump Houses & Power Generation Control Cabinet Inconsistent.Action Statements Implemented + (10:58:02, 8 January 2025)
- GO2-89-064, Forwards Status of Implementation of TMI Action Plan Items for Plant,Per 890414 Request.Implementation of Issue II.F.1.2.B Considered by Util to Be Complete Based on Last Ltr to NRC + (10:58:03, 8 January 2025)
- GO2-89-061, Responds to NRC Re Violations Noted in Insp Rept 50-397/89-09.Corrective Action:Radiological Posting Restored to Correct Configuration.Health Physics Personnel Performing Tour of Plant for Compliance W/Radiological Control Progra + (10:58:04, 8 January 2025)
- ML17285A396 + (10:58:05, 8 January 2025)
- GO2-89-059, Application for Amend to License NPF-21,reducing Age Factor of Div 1 250-volt Dc Battery Sys to 20%,per 10CFR50.59,in Tech Spec 3/4.8.2, DC Sources + (10:58:06, 8 January 2025)
- GO2-89-058, Forwards Proposed Change to NPDES Permit WA-002515-1 Re Monitoring of Residual Chlorine in Cooling Water Blowndown. Evaluation Council Will Consider Request as Formal Permit Mod + (10:58:07, 8 January 2025)
- ML17285A392 + (10:58:08, 8 January 2025)
- GO2-89-055, Confirms Commitments for Compliance W/Atws Rule 10CFR50.62 Re Recirculating Pump Trip,Per 890303 Telcon.Recirculating Pump Trip Logic Trip Scheme Will Be Redesign as Indicated in Encl Diagram + (10:58:09, 8 January 2025)
- IR 05000397/1989004 + (10:58:12, 8 January 2025)
- ML17285A375 + (10:58:14, 8 January 2025)
- ML17285A378 + (10:58:14, 8 January 2025)
- 05000397/LER-1989-004, :on 890226,mobile Crane Brought within Reach of safety-related Structures & Components W/O Safety Evaluation Being Performed.Caused by Lack of Procedures Controlling Use of Mobile Cranes.Crane Removed from Area + (10:58:16, 8 January 2025)