Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000397/1989011 + (10:56:12, 8 January 2025)
- ML17285A581 + (10:56:13, 8 January 2025)
- ML17285A580 + (10:56:14, 8 January 2025)
- ML17285A579 + (10:56:15, 8 January 2025)
- 05000397/LER-1989-005-01, :on 890311,of 185 Control rods,34 Drifted Inward from One to Seven Notches Due to Momentary Low Scram Air Header Pressure.Caused by Main Steam Radiation Monitor Design Deficiency + (10:56:16, 8 January 2025)
- GO2-89-110, Discusses Plant ATWS Mod Schedule.Two Issues Re Logic Relays & Topical Rept Need Clarification + (10:56:17, 8 January 2025)
- IR 05000397/1989015 + (10:56:19, 8 January 2025)
- ML17285A573 + (10:56:21, 8 January 2025)
- ML17285A572 + (10:56:21, 8 January 2025)
- ML17285A571 + (10:56:22, 8 January 2025)
- ML17285A570 + (10:56:23, 8 January 2025)
- ML17285A568 + (10:56:24, 8 January 2025)
- TAC:67620 + (10:56:24, 8 January 2025)
- 05000397/LER-1989-019, :on 890524,inboard RHR Shutdown Cooling Supply Valve Automatically Isolated When Electrician Lifted Wire Deenergizing Valve Control Relay.Personnel Counseled & Training in Plant Procedures Initiated + (10:56:25, 8 January 2025)
- 05000397/LER-1989-018, :on 890522,reactor Protection Sys (RPS) a motor-generator Set Failed Resulting in Loss of Power to RPS Bus A.Caused by Component Failure.Motor Replaced + (10:56:27, 8 January 2025)
- 05000397/LER-1989-017, :on 890520,outboard RHR Shutdown Cooling Valve Automatically Isolated,Causing Loss of Shutdown Cooling. Caused by Removal of Relay by Contractor Maint Electrician Installing Mod to Leak Detection Sys + (10:56:28, 8 January 2025)
- 05000397/LER-1989-005, :on 890311,34 of 185 Control Rods Drifted Inward from One to Seven Notches.Caused by Main Steam Line Radiation Monitor Design Deficiency.Desired Rod Pattern Reestablished + (10:56:30, 8 January 2025)
- GO2-89-109, Advises NRC That Requirement of Reg Guide 1.97,Rev 2 to Provide Qualified Wide Range Neutron Monitor Satisfied. Requests That Deferral Contained in Be Withdrawn + (10:56:31, 8 January 2025)
- ML17285A561 + (10:56:31, 8 January 2025)
- 05000397/LER-1989-016, :on 890514,reactor Operator Inadvertently Tripped Div 1 & 2 Offsite Power Supply Feeders Resulting in Loss of Power to Buses SM-7 & SM-4.Caused by Inadvertent Removal of Transformer Fuses.Fuses Reinserted + (10:56:33, 8 January 2025)
- ML17285A557 + (10:56:34, 8 January 2025)
- ML17285A556 + (10:56:35, 8 January 2025)
- ML17285A554 + (10:56:36, 8 January 2025)
- ML17285A553 + (10:56:37, 8 January 2025)
- ML17285A551 + (10:56:38, 8 January 2025)
- IR 05000133/2017003 + (10:56:41, 8 January 2025)
- GO2-89-106, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-40.No Tech Spec Change to Section 4.7.2.d Will Be Submitted as Part of Corrective Action to Be Taken + (10:56:42, 8 January 2025)
- 05000397/LER-1989-015, :on 890512,three-quarter-inch High Point Vent Line Failed During Performance of HPCS Sys Operability Procedure.Caused by Reverse Bending Fatigue Caused by Vibration.Design Change Implemented + (10:56:44, 8 January 2025)
- 05000397/LER-1989-013, :on 890508,preliminary Calculations Indicated Potential Common Mode Failure of Redundant 120-volt safety- Related Devices.Caused by Less than Adequate Design Criteria to Limit Voltage Drops.Procedure Revised + (10:56:46, 8 January 2025)
- 05000397/LER-1989-012, :on 890505,unplanned Reactor Scram Occurred During Performance of Reactor Protection Sys Logic Sys Functional Test.Caused by Procedural Inadequacy.Procedure Will Be Revised to Provide Specific Resetting + (10:56:47, 8 January 2025)
- ML17285A521 + (10:56:49, 8 January 2025)
- ML17285A523 + (10:56:49, 8 January 2025)
- TAC:72924 + (10:56:50, 8 January 2025)
- GNRO-2017/00068, Response to Official Requests for Additional Information (RAI) for RR GG-ISI-020 to Use BWRVIP Guidelines + (10:56:51, 8 January 2025)
- ML17285A517 + (10:56:51, 8 January 2025)
- GO2-89-101, Forwards Supplemental Info to 890331 Application for Amend to License NPF-21,revising Tech Specs 3/4.2.6, Power Flow Instability & 3/4.2.7, Neutron Flux Noise Monitoring, Per 890515 & 22 Telcons W/Nrc + (10:56:52, 8 January 2025)
- IR 05000397/1989012 + (10:56:56, 8 January 2025)
- ML17285A508 + (10:56:57, 8 January 2025)
- GO2-89-103, Forwards Addl Info Re Insp Rept 50-397/86-12 Concerning Equipment Qualification of Limitorque Motor Operators Toward Resolution of Remaining Open Item on Subj Audit.Grease Relief Valve Test Data & T-drain Technical Analysis Encl + (10:56:58, 8 January 2025)
- GO2-89-102, Suppls 890303 & 0420 Applications for Amend to Tech Specs Re Reload Requirements for (Cycle 5).Figures 3.2.1-6,3.2.3-1, 3.2.4-2 & 3.2.4-3 Encl + (10:56:59, 8 January 2025)
- GO2-89-104, Part 21 Rept Re Defect Discovered in Valve Motor Operator of RCIC Inboard Containment Isolation Valve RCIC-V-63.Upper Housing Cover Will Be Machined to Remove Excess Matl to Provide Required Recess + (10:57:00, 8 January 2025)
- GO2-89-098, Requests That 21 Addl Days Be Granted for Response to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thining, Due to Util Not Receiving Ltr Until 890523 + (10:57:02, 8 January 2025)
- GO2-89-097, Advises That No Tech Spec Change to Table 3.12-1 Re Location of Direct Radiation Station Necessary Per Review of Amend 6 to Offsite Dose Calculation Manual + (10:57:03, 8 January 2025)
- 05000397/LER-1989-014, :on 890509,full Reactor Protection Sys Actuation Occurred.Caused by Accidental Movement of Local Power Range Monitor Cables.Scram Reset & Importance of Tying Cables Away from Working Area Stressed + (10:57:05, 8 January 2025)
- ML17285A492 + (10:57:09, 8 January 2025)
- GO2-89-081, Forwards Status Rept for Apr 1989 in Response to Generic Ltr 88-14 Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. W/Six Oversize Drawings + (10:57:10, 8 January 2025)
- GO2-89-096, Requests Addl 30 Days for Responding to Generic Ltr 89-06. Response Would Be Due to NRC by 890810.Ltr Not Received Until 890512 + (10:57:12, 8 January 2025)
- GO2-89-092, Forwards Info Re Implementation of Improvement Programs in Each of Functional Areas Reviewed by NRC in 1988 SALP Rept & Summary of Accomplishments & Status of All Commitments from Util 880917 Response to Subj Rept,Per 890105 Meeting + (10:57:14, 8 January 2025)
- 05000397/LER-1989-008, :on 890419,discovered That on 881202,Tech Spec Amend Request Submitted to NRC Describing Diesel Generator Trip Bypass Verification That Had Not Been Performed W/Ler Not Issued within 30 Days After Determination + (10:57:16, 8 January 2025)
- ML17285A483 + (10:57:17, 8 January 2025)
- TAC:63934 + (10:57:18, 8 January 2025)