Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000397/1993011 + (10:14:49, 8 January 2025)
- ML17290A326 + (10:14:51, 8 January 2025)
- ML17290A325 + (10:14:52, 8 January 2025)
- ML17290A324 + (10:14:53, 8 January 2025)
- CAC:MG0244 + (10:14:54, 8 January 2025)
- ML17290A321 + (10:14:54, 8 January 2025)
- ML17290A320 + (10:14:55, 8 January 2025)
- ML17290A318 + (10:14:56, 8 January 2025)
- ML17290A317 + (10:14:57, 8 January 2025)
- TAC:M85924 + (10:14:58, 8 January 2025)
- ML17290A316 + (10:14:58, 8 January 2025)
- ML17290A314 + (10:14:59, 8 January 2025)
- ML17290A313 + (10:15:00, 8 January 2025)
- 05000397/LER-1993-010-01, Forwards LER 93-010-01,discussing Items of Reportability, Corrective Action Taken & Action Taken to Preclude Recurrence + (10:15:03, 8 January 2025)
- ML17290A300 + (10:15:04, 8 January 2025)
- ML17290A302 + (10:15:04, 8 January 2025)
- GO2-93-111, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-07.C/As:line Mgt Has Initiated Frequent Plant Walkdowns to Ensure Compliance W/Ppm 1.3.19 & to Provide Immediate Feedback to Upper Mgt + (10:15:05, 8 January 2025)
- GO2-93-107, Application for Amend to License NPF-21,changing Provisions in TS Section 6.2.3, Nuclear Safety Assurance Div & Section 6.5.1, Plant Operations Committee to Reflect Realignment of QA Directorate + (10:15:07, 8 January 2025)
- ML17290A298 + (10:15:07, 8 January 2025)
- ML17290A295 + (10:15:18, 8 January 2025)
- ML17290A293 + (10:15:19, 8 January 2025)
- ML17290A292 + (10:15:20, 8 January 2025)
- ML17290A290 + (10:15:21, 8 January 2025)
- 05000397/LER-1993-013, :on 930318 & 0412,design Errors Noted in Component Safety Classification & Design Requirements Document Programs for RCIC Primary Containment Release path.RCIC-V-31 Closed & motor-operator Deenergized + (10:15:23, 8 January 2025)
- 05000397/LER-1993-013-01, Forwards LER 93-013-01,discussing Items of Reportability, Corrective Action Taken & Action Taken to Preclude Recurrence + (10:15:24, 8 January 2025)
- GO2-93-084, Monthly Operating Rept for Apr 1993 for WNP-2.W/undated Ltr + (10:15:25, 8 January 2025)
- GO2-93-099, Radiological Environ Monitoring Program 1992 Annual Rept for WNP-2 + (10:15:27, 8 January 2025)
- 05000397/LER-1993-011, :on 930310 & 0409,determined That Previously Performed Surveillance Testing Did Not Demonstrate Operability of Hoists Associated W/Refueling Platform.Caused by Personnel Error.Listed Procedures Changed + (10:15:29, 8 January 2025)
- 05000397/LER-1993-011-01, Forwards LER 93-011-01,discussing Items of Reportability, Corrective Action Taken & Action to Preclude Recurrence + (10:15:31, 8 January 2025)
- IR 05000397/1993004 + (10:15:45, 8 January 2025)
- ML17290A273 + (10:15:47, 8 January 2025)
- TAC:M75048 + (10:15:47, 8 January 2025)
- ML17290A272 + (10:15:48, 8 January 2025)
- 05000397/LER-1993-016, :on 930331,containment Atmosphere Control Sys Primary Containment Isolation Valves Discovered Open, Resulting in Exceeding Leakage Limits.Caused by Less than Adequate Procedures.Valves Closed by Removing Jumper + (10:15:49, 8 January 2025)
- GO2-93-095, WNP-2 Cooling Water Blowdown Discharges,1992 + (10:15:51, 8 January 2025)
- 05000397/LER-1993-015, :on 930331,unusual Event Declared as Result of Inoperability of HPCS Sys from Low Svc Water Flow Through HPCS Pump Room Cooler,Coincident w/930318 Inoperability of Rcic.Caused by Component Defect.Flow Revised + (10:15:53, 8 January 2025)
- GO2-93-102, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-08.Corrective Actions:Plant QA Organization Will Develop Plan to Improve Prioritization,Tracking & Follow Up on C/As Resulting from Quality Finding Rept + (10:15:54, 8 January 2025)
- GO2-93-096, Responds to NRC Re Notice of Violation & Proposed Imposition of Civil Penalty from Insp Rept 50-397/92-41. Corrective Actions:Util Will Benchmark Radwaste Program W/ Other Selected Utils to Ensure Consistency W/Industry Stds + (10:15:55, 8 January 2025)
- ML17290A252 + (10:15:57, 8 January 2025)
- GO2-93-094, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-07.Corrective Actions:Line Mgt Has Initiated Frequent Plant Walkdowns to Ensure Compliance W/Ppm 1.3.19 & Provide Immediate Feedback to Upper Mgt + (10:15:58, 8 January 2025)
- GO2-93-089, Advises That Wg Counsil Assumed Position of Managing Director of Wpps,Replacing DW Mazur on 930405.DW Mazur Resigned in 1992 Due to Health Reasons + (10:15:59, 8 January 2025)
- ML17290A248 + (10:16:01, 8 January 2025)
- GO2-93-091, Responds to NRC Re Violations Noted in Insp Rept 50-397/92-43 on 921228-930206.Corrective Actions:Plant Procedure Re Restart Evaluation Process Will Be Revised to Incorporate Improvements in Mgt Time Out + (10:16:02, 8 January 2025)
- ML17290A240 + (10:16:04, 8 January 2025)
- IR 05000397/1992027 + (10:16:05, 8 January 2025)
- IR 05000397/1993002 + (10:16:13, 8 January 2025)
- ML17290A233 + (10:16:14, 8 January 2025)
- IR 05000397/1993010 + (10:16:42, 8 January 2025)
- GO2-93-087, Informs That Revs of EOPs Has Been Implemented for Plant Operations on 930409 After Successful Conclusions of Two Cycles of Requalification Training + (10:16:44, 8 January 2025)
- ML17290A229 + (10:16:44, 8 January 2025)
- ML17290A226 + (10:16:46, 8 January 2025)