Monthly Operating Rept for Apr 1993 for WNP-2.W/undated Ltr
ML17290A286
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1993
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-93-084, GO2-93-84, NUDOCS 9305140100
Download: ML17290A286 (8)


Text

ACCELEtu.T DOCUMENT DISTRUTION SYSTEM REGULAT INFORMATION DISTRIBUTION SYSTEM (RIDS) r ACCESSION NBR:9305140100 DOC.DATE: 93/04/30 NOTARIZED: NO DOCKET

'ACIAL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System BAKER,J.W.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Apr 1993 for WNP-2.W/undated ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES D

RECIPIENT ID CODE/NAME PDV LA CLIFFORD,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN5 COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

RECIPIENT ID CODE/NAME PDV PD AEOD/DOA

.ORS jOEAB EG FILE 01 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

EXTERNAL: EG&G BRYCEgJ.H NSIC 1

1 1

1 NRC PDR 1

1 D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 Docket No. 50-397 G02-93-084 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANTNO. 2 MONTHLYOPERATING REPORT APRIL 1993 Transmitted herewith is the Monthly Operating Report for the month of April 1993 as required by our Technical Specifications 6.9.1.6.

Very truly yours,

. W. Baker WNP-2 Plant Manager (MD 927M)

LBH/ja CC:

Mr. W. H. Lovelace, NRC, Washington, DC Mr. J. B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington, CT Mr. R. C. Barr, NRC Resident Inspector (901A)

Mr. J. T. Wheelock, INPO Mr. F. Yost, UtilityData Institute 9iasiOOl00 9~OOSO

'PDR 1"ADOCK 05000397 R ',,

PDR

"~

it 8000kl

C DOCKET NO.:

50-397 UNITNAME:

WNP-2 DATE:

MAY3, 1993, COMPLETED BY:

LB HUTCHISON TELEPHONE:

(509) 377-2486 UNIT SHUTDOWNS I REDUCTIONS REPORT PERIOD: APRIL 1993 NO.

DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT CAUSE &CORRECTIVE ACHON TO PREVENT RECURRENCE NONE

SUMMARY

WNP-2 operated routinely during April. Entered EOC coastdown mode on April6 and coastdown continued until start of shutdown for refueling outage R-8 on April30.

F-FORCED S-SCHED REASON A-EQUIP FAILURE B-MAINTOR TEST C-REFUELING D-REGULATORYRESTRICTION E-OPERATOR TRAINING&

LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER METHOD 1-MANUAL 2-MANUALSCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER SYSTEM &COMPONENT EXHIBITF &H INSTRUCTIONS FOR PREPARATION OF DATAENTRY SHEET LICENSEE EVENT REPORT (LER) FILE (NUREG -0161)

~

V AVERAGEDAILYUNIT POWE<R LEVEL DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-397 WNP-2 APRIL 1993 LB HUTCHISON (509) 377-2486 MONTH:

APRIL 1993 DAYAVERAGEDAILYPOWER LEVEL (MWe-NET)

DAYAVERAGE DAILYPOWER LEVEL (MWe-NET) 1072 17.

1052 2.

1069 18.

1035 3.

1007 19.

1035 1089 20.

1029 5.

1099 21.

1017 6.

1094 22.

1013 7.

1090 23.

1018 8.

1083 24.

1014 9.

1079 1011 10.

1073 26.

1009 1077 27.

1009 12.

1073 28.

1005 13.

1070 29.

994 14.

1069 30.

792 15.

1062 16.

1056 INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVELIN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATT.

THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLECAPACITYIS USED FOR THE NET ELECTRICALRATINGOF THE UNIT,THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100% LINE (OR THE RESTRICTED POWER LEVELLINE). IN SUCH CASES, THE AVERAGEDAILYUNITPOWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.

4 4 +a 4

lJ OPERATING DATAREPORT WNP-2 DATE:

May 1, 1993 2.

DOCKET: 50-397 REPORTING PERIOD:

Apr-93 OUTAGE + ON-LINE HOURS:

719 3.

5.

6.

7.

8.

9.

UTILITYCONTACT:

Leonard Hutchison (509) 377-2486 LICENSED THERMALPOWER (MWt):

NAMEPLATE RATING (GROSS MWe):

DESIGN ELECTRICAL RATING (NET MWe):

MAXIMUMDEPENDABLE CAPACITY (GROSS MWe):

MAXIMUMDEPENDABLE CAPACITY (NET MWe):

IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

3323 1200.9 1120 1165 1112 10.

POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

REASONS FOR RESTRICTIONS, IF ANY:

12.

13.

14.

15.

16.

17.

18.

19.

20.

21, 22.

23.

24.

25.

REPORT PERIOD HOURS HOURS REACTOR CRITICAL RX RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMALENERGY (MWH)

GROSS ELECTRICAL ENERGY (MWH)

NET ELECTRICAL ENERGY (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAPACITYFACTOR (MDC NET)

UNIT CAPACITY FACTOR (DER NET)

UNlT FORCED OUTAGE RATE FORCED OUTAGE HOURS MONTH 719.0 719.0 0.0 719.0 0.0 2,256,999 784,640 747,577 100.0%

100.0%

93.5%

92.8%

0.0%

0.0 YEAR 2,879.0 2,431.3 0.0 2,341.3 0.0 7,355,945 2,556,640 2,430,409 81.3%

81.3%

75.9%

75.4%

14.4%

392.5 CUMULATIVE 73,447.2 51,579.9 340.4 49,649.0 381.7 144,520,595 48,405,730 46,380,828 67.6%

68. 1%

57.7%

57.4%

13.4%

7,665.8 26.

SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION:

REFUELING OUTAGE R8 STARTING MAY 1, 1993 FOR 45 DAYS.

27.

IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE;

0

~ '