Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-93-131, Application for Amend to License NPF-21,changing TS 6.0, Adminstrative Controls to Clearly Assign Corporate Responsibility for Overall Plant Nuclear Safety,Including Review & Audit Functions + (10:13:38, 8 January 2025)
- ML17290A402 + (10:13:38, 8 January 2025)
- GO2-93-127, Forwards Amend 1 Vols 1-3 of ISI Program Plan for First Insp Interval + (10:13:40, 8 January 2025)
- GO2-93-117, Comments on Proposed Insp Procedure 38703, Commercial Grade Procurement Insp + (10:13:41, 8 January 2025)
- ML17290A389 + (10:13:42, 8 January 2025)
- GO2-93-124, Forwards Rev 16 to WPPSS-QA-004, Operational QA Program Description + (10:13:43, 8 January 2025)
- GO2-93-116, Provides Revised Completion Date for Installation of Adjustable Speed Drives (ASD) in Rrs.Current Plans Are to Installed ASDs During R-11 Annual Maint & Refueling Outage (Currently Scheduled for Spring 1996) + (10:13:44, 8 January 2025)
- ML17290A383 + (10:13:46, 8 January 2025)
- GO2-93-119, Forwards GE Rept R-R8-111 Re Flaw in Reactor Bldg Piping. Review of Program Output for Fatigue Analysis & IGSCC Fracture Mechanics Showed Current Crack Size Well within Limit of Util Evaluation.Indication Will Be Monitored + (10:13:47, 8 January 2025)
- TAC:M80358 + (10:13:47, 8 January 2025)
- GO2-93-123, Describes Alternate Schedule for IGSCC Insps,Per GL 88-01. All Required Insps of Category D Welds Will Be Completed within Required 3-yr Interval.All Welds Inspected During Refueling Outage 7 & No Indications Noted + (10:13:49, 8 January 2025)
- TAC:M84714 + (10:13:49, 8 January 2025)
- 05000397/LER-1993-018, :on 930428,discovered Design Condition That Could Have Impacted Plants Ability to Mitigate Accident Conditions.Caused by Less than Adequate Change Mgt.Abnormal Operating Procedures Will Be Revised + (10:13:52, 8 January 2025)
- ML17290A378 + (10:13:54, 8 January 2025)
- ML17290A377 + (10:13:55, 8 January 2025)
- GO2-93-128, Forwards Revised Relief Request RP-9 to Permit Use of Ref Curve for Testing Specific Pumps (Rhr,Hpcs,Lpcs & RCIC) Instead of Fixed Ref Point + (10:13:56, 8 January 2025)
- TAC:M60493 + (10:13:56, 8 January 2025)
- ML17290A371 + (10:13:59, 8 January 2025)
- WO 17-0065, Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary + (10:14:00, 8 January 2025)
- ML17290A369 + (10:14:01, 8 January 2025)
- IR 05000397/1992043 + (10:14:02, 8 January 2025)
- IR 05000397/1993017 + (10:14:04, 8 January 2025)
- NL-17-134, Radiation Monitor R-26 Inoperable + (10:14:06, 8 January 2025)
- ML17290A359 + (10:14:07, 8 January 2025)
- 05000446/LER-1917-001, Regarding Auxiliary Feedwater System Actuation During Unit 2 Turbine Trip + (10:14:12, 8 January 2025)
- HCH-2017-038, Submittal of Discharge Monitoring Report for August 2017 + (10:14:13, 8 January 2025)
- ML17290A353 + (10:14:15, 8 January 2025)
- ML17290A356 + (10:14:15, 8 January 2025)
- GO2-93-115, Forwards Rev 15 to WPPSS-QA-004, Operational QA Program Description. Changes Incorporated in Rev Involve Organizational Changes Which Do Not Reduce Commitments Made in Previously Accepted Revs Nor Reduce Qa/Qc Independence + (10:14:16, 8 January 2025)
- 05000397/LER-1993-017, :on 930426,discovered That Fire Damper Seismic Qualification Concerns Identified in 1985 Through 1987,but Not Reported.Caused by Failure to Include Fire Dampers on safety-related Mechanical List.No C/A Required + (10:14:20, 8 January 2025)
- GO2-93-118, Forwards Addl Info to Suppl 930510 Application for Amend to License NPF-21,changing TS Section 6.0, Administrative Controls, to Clarify Commitments Re FSAR & NUREG-0737 Covering Proposed Realignment of QA Organization + (10:14:21, 8 January 2025)
- ML17290A344 + (10:14:27, 8 January 2025)
- ML17290A343 + (10:14:27, 8 January 2025)
- PNP 2017-059, License Amendment Request Supplement - Cyber Security Plan Implementation Schedule + (10:14:28, 8 January 2025)
- IR 05000397/1993006 + (10:14:37, 8 January 2025)
- ML17290A338 + (10:14:38, 8 January 2025)
- IR 05000397/1993012 + (10:14:40, 8 January 2025)
- ML17290A336 + (10:14:42, 8 January 2025)
- ML17290A334 + (10:14:43, 8 January 2025)
- IR 05000397/1993005 + (10:14:45, 8 January 2025)
- ML17290A331 + (10:14:47, 8 January 2025)
- IR 05000397/1993011 + (10:14:49, 8 January 2025)
- ML17290A326 + (10:14:51, 8 January 2025)
- ML17290A325 + (10:14:52, 8 January 2025)
- ML17290A324 + (10:14:53, 8 January 2025)
- CAC:MG0244 + (10:14:54, 8 January 2025)
- ML17290A321 + (10:14:54, 8 January 2025)
- ML17290A320 + (10:14:55, 8 January 2025)
- ML17290A318 + (10:14:56, 8 January 2025)
- ML17290A317 + (10:14:57, 8 January 2025)
- TAC:M85924 + (10:14:58, 8 January 2025)