. ACCELERATED DOCUMENT DISTRIBUTIONSYSTEM
~
REGULATORY INFORMATION'DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:9305240019
DOC.DATE: 93/05/03
NOTARIZED:
NO
'OCKET
FACIL:50-397
WPPSS Nuclear Project,
Unit 2, Washington Public
Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
REESE,J.H.
Region
5 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
SORENSEN,G.C.
Washington Public Power Supply System
D
NOTES:
SUBJECT:
Forwards
Insp Rept 50-397/93-12
on 930405-09
& notice of
violation.
DZSTRZSOTZON CODE:
ZE06D
COPZES
RECEZVED:LTR
/ ENCL
/
SZZE: Z + V
TITLE: Environ
s Radiological
(50 DKT)-Insp Rept/Notice of Violation Respons
g
RECIPIENT
ID CODE/NAME
PDV LA
CLIFFORDIJ
INTERNAL: ACRS
AEOD/DSP
NRR/DREP/PRPB10
NRR/PMAS/ILRB12
OE DXg
G FIL
02
GN
RSS/RPB
RGN4 MURRAY,B
EXTERNAL: EGGG SIMPSON,F
COPIES
LTTR ENCL
1
0
1
1
2
2
1
1
2
2
1
1
1
1
1
1
1
1
1
1
2
2
1
1
RECIPIENT
ID CODE/NAME
PDV PD
AEOD/ANDERSON,R
NMSS/SGTB
4E4
NRR/DRIL/RPEB10
NUDOCS-ABSTRACT
OGC/HDS1
RGN5
FILE
01
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D
D
D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
D
$
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
23
c~~ ~tcq,,
~C
~o
\\
+1*4+
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIALANE
WALNUTCREEK, CALIFORNIA94596-5368
MAY 0 3 i993
Oocket 50-397
License
Public Power Supply System
(WPPSS)
P.O.
Box 968
3000 George
Way
Richland,
99352
Attention:
Mr.
G.
C. Sorensen,
Manager
Regulatory
Programs
SUBJECT:
NRC
INSPECTION
REPORT 50-397/93-12
This letter refers to the routine inspection
conducted
by Nr. L.C. Carson II
and Nr. V. L. Beaston,
on April 5-9,
1993,
and subsequent
telephone
conversations
on April 13,
and April 16,
1993, of activities authorized for
your Washington
Nuclear Project
2 {WNP-2).
On April 9,
1993, at the
conclusion of the onsite portion of the inspection,
Nr. Carson discussed
the
findings with Nr. J.
Baker and other members of your staff identified in the
enclosed
report.
Areas
examined during this inspection
are described
in the enclosed report.
Within these
areas,
the inspection consisted of selective
examinations
of
procedures
and representative
records,
interviews with personnel,
and
observations
of activities in progress.
Based
on the results of this inspection,
certain of your activities appear to
be in violation of NRC requirements,
as described
in the enclosed
Notice of
Violation (Notice).
The violation involved
a worker's failure to adhere to
es
i
tabl'shed
procedures
as required
by Technical Specification
6. 11. 1.
This
violation is, significant because strict adherence
to Radiation
Work Pe
mr its
(RWPs) is required
by your radiation protection program,
and this violation
indicates that your expectations
for procedural
adherence
were not met.
Although Section
2.201 provides for a written statement of explanation
to this
office within 30 days of your receipt of this Notice,
we note that this
violation had
been corrected
and those actions,
including your root cause
analysis,
were reviewed during this inspection.
Therefore,
no response
with
respect to this matter is required.
9305240019
5'30503
ADOCN 05000397
8
, PDR
~
ll
In accordance
with 10
CFR 2.790(a) of the NRC's
"Rules of Practice,"
a copy of
this letter
and its enclosures
wi'll be placed in the
NRC Public. Oocument
Room.
S'erely,
s
.
Reese,
ief
lities Radio ogical Protection
Branch
Enclosures:
Inspection
Report 50-397/93-12
cc w/enclosure:
Hr. J.
W. Baker,
WNP-2 Plant Manager
G,
E.
C.
Ooupe,
Esq.,
Mr. Warren A. Bishop,
Chairman,
Energy Facility Site Evaluation Council
Hr. Alan G. Hosier,
Licensing Manager,
Hr. J.
V. Parrish, Assistant
Managing Oirector for Operations,
Hr. James
C. Gearhart,
Oirector, guality Assurance,
Chairman,
Benton County Board of Commissioners
H. H. Philips,
Esq.,
Winston
8 Strawn
ViAY 0 3 ~W
bcc w/enclosure:
Docket File
Resident
Inspector
Project Inspector
G.
Cook
R.
Huey
B, Faulkenberry
J. Martin
se
/9/RS
OP
bcc w/o enclosures:
M. Smith
J. gollicoffer
ggi~
LCarson
4'/Xl/6
VBeaston
5 5/9>
YES
NO
S
TO
YES
NO
S
TO DCS
YES
NO
NO
YES
NO
YES
NO