Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-94-010, Requests Discretionary Enforcement to Allow Continued Plant Operation W/Eccs Instrumentation Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits Specified in TS 3/4.3.3 + (10:06:24, 8 January 2025)
- GO2-94-005, Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements + (10:06:26, 8 January 2025)
- ML17290A899 + (10:06:26, 8 January 2025)
- GO2-94-004, Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 + (10:06:28, 8 January 2025)
- ML17290A894 + (10:06:28, 8 January 2025)
- GO2-94-001, Forwards Request for Approval to Revise WNP-2 Tornado Design Criteria Per RG 1.76 Section C.1.2 + (10:06:30, 8 January 2025)
- GO2-94-008, Monthly Operating Rept for Dec 1993 for WNP-2 + (10:06:31, 8 January 2025)
- 05000397/LER-1993-031, :on 931109,engineering Evaluation Determined That MCR HVAC Sys Will Not Maintain CR Temp.Caused by Inadequate Design Margin in Original Design.Per Written to Document Potential Analysis Concerns + (10:06:34, 8 January 2025)
- GO2-93-293, Special Rept:On 931116,loose Parts Detection Sys Channel 5 Did Not Pass Daily Channel Surveillance.Exact Cause Not Determined.Need to Provide Addl Notifications Should Other Channels Become Inoperable Not Necessary + (10:06:34, 8 January 2025)
- GO2-94-002, Provides Updated Info Re Resolution of SBO for WNP-2 + (10:06:36, 8 January 2025)
- GO2-94-006, Responds to 931026 RAI Re Power Uprate Review & Forwards Proprietary List of Glossary Terms.List Withheld + (10:06:37, 8 January 2025)
- GO2-94-003, Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures + (10:06:39, 8 January 2025)
- ML17290A880 + (10:06:39, 8 January 2025)
- GO2-93-301, Advises That Completion Date for Corrective Actions for Items 1 & 2 of Insp Rept 50-397/93-36 Extended to 940114. Extension Allows Related Procedures to Be Revised to Match Procedure PPM 1.3.43 + (10:06:41, 8 January 2025)
- GO2-93-297, Forwards Proprietary Evaluation of Unusual Differential Growth at Grand Gulf Unit 1, & Insp of Siemens Power Corp Fuel Assemblies at WNP-2,May 193 (EOC 8) + (10:06:42, 8 January 2025)
- GO2-93-299, Forwards Rev 12 of Emergency Preparedness Plan for WNP-1 & WNP-2 + (10:06:44, 8 January 2025)
- 05000397/LER-1992-020, :on 920508,discovered Low Elements for Low Pressure Core Spray Min Flow Control Not Properly Installed. Procedures Modified to Include Check of Instrument Startups Prior to Running Pump + (10:06:46, 8 January 2025)
- ML17290A857 + (10:06:48, 8 January 2025)
- ML17290A856 + (10:06:49, 8 January 2025)
- ML17290A855 + (10:06:51, 8 January 2025)
- ML17290A854 + (10:06:52, 8 January 2025)
- IR 05000397/1993046 + (10:06:54, 8 January 2025)
- ML17290A851 + (10:06:55, 8 January 2025)
- IR 05000397/1993043 + (10:06:58, 8 January 2025)
- ML17290A847 + (10:07:00, 8 January 2025)
- GO2-93-294, Forwards Addl Info Re Issuance of Amend 119 to License NPF-21 Re TS 3/4.3.2. Isolation Actuation Instrumentation Response Time Testing + (10:07:01, 8 January 2025)
- IR 05000397/1993042 + (10:07:04, 8 January 2025)
- ML17290A843 + (10:07:05, 8 January 2025)
- GO2-93-296, Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys + (10:07:06, 8 January 2025)
- ML17290A841 + (10:07:06, 8 January 2025)
- GO2-93-290, Special Rept:On 931126,main Control Room Received Stack Monitor Sys Trouble Annunciator & Status Display Indicated High Range Channel Failed self-test.Caused by Component Failure of Stack Monitor Detector.Replacement in Progress + (10:07:08, 8 January 2025)
- GO2-93-292, Requests That NRC Delay Review of IPE Until IPE Models Updated to Current Plant Configurations.Update Expected by 940528 + (10:07:10, 8 January 2025)
- ML17290A835 + (10:07:12, 8 January 2025)
- GO2-93-291, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-36.Corrective Actions:Ts Change Request Submitted for Removal of Ref to Listed motor-operated Valves & Licensing Program Instruction 5.0 Revised + (10:07:13, 8 January 2025)
- GO2-93-289, Responds to Violations Noted in Insp Repts 50-397/93-18, 50-397/93-24 & 50-397/93-29.Corrective Actions:Monitoring & Feedback Mechanism Enhanced by Incorporating Problem Classification Sys + (10:07:15, 8 January 2025)
- GO2-93-285, Forwards Response to Concerns Communicated in Ltr Re Potential for Core Instability in Event of ATWS Followed by Trip of Recirculation Pumps + (10:07:16, 8 January 2025)
- GO2-93-283, Confirms Electronic Transfer of Funds as Payment for Civil Penalty Imposed in Enforcement Action EA-93-191 + (10:07:18, 8 January 2025)
- 05000397/LER-1993-028, Application for Amend to License NPF-21 for Exclusion of Single RWCU Helb,In Ref to LER 93-028-00,submitted Via + (10:07:20, 8 January 2025)
- ML17290A827 + (10:07:21, 8 January 2025)
- GO2-93-282, Application for Amend to License NPF-21,revising TS 3/4.6.1.4, Msivlcs to Allow Band of Acceptable Values for Msivlcs Blower Dilution Flow to Be Same in Content as Msivlcs Improved TS + (10:07:22, 8 January 2025)
- ML17290A824 + (10:07:23, 8 January 2025)
- GO2-93-281, Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H + (10:07:24, 8 January 2025)
- ML17290A821 + (10:07:25, 8 January 2025)
- GO2-93-280, Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys + (10:07:26, 8 January 2025)
- GO2-93-207, Informs That on 930726,control Room Received Main Steam Leakage Control Board W Trouble Alarm (S2-2.2) Due to Power Lost to Power Panel E-PP-7BC.Blown Fuses in Regulating Transformer That Feeds E-PP-7BC Replaced + (10:07:27, 8 January 2025)
- GO2-93-287, Informs That BPA Obligated to Pay Annual Costs of Plant to Util Under Terms of Net Billing Agreements,Included as Attachment to Util .Compliance w/10CFR140.21 Re Guarantee of Payment of Deferred Premium Satisfied + (10:07:28, 8 January 2025)
- GO2-93-284, Monthly Operating Rept for Nov 1993 for WPPSS 2 + (10:07:30, 8 January 2025)
- GO2-93-274, Clarifies 931117 Request for Discretionary Enforcement for TS 3/4.3.2, Isolation Actuation Instrumentation, in Response to NRC 931118 Notice of Enforcement Discretion + (10:07:32, 8 January 2025)
- GO2-93-206, Withdraws 890802 Commitment to Include non-safety Related Equipment Which Requires Operators to Enter Into or Control within EOP within Setpoint Methodology Program in Response to NRC Re Insp Rept 50-397/87-19 + (10:07:33, 8 January 2025)
- ML17290A809 + (10:07:35, 8 January 2025)
- ML17290A808 + (10:07:36, 8 January 2025)