ML17290A843
| ML17290A843 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/14/1993 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17290A844 | List: |
| References | |
| NUDOCS 9312300053 | |
| Download: ML17290A843 (6) | |
See also: IR 05000397/1993042
Text
FORD
1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (BIDS)
ACCESSION
NBR: zi312300053
DOC. DATE: 'V3/12/14
NOTARIZED:
NO
DOCKET
FACIL: 56-3'77
NPPSS Nuclear Pro Jecti
Unit 2I
Public
Poee
05000397
AUTH. NAME
AUTHOR AFFILIATION
PATEI R. J.
Region
5 (Post
820201)
REC IP. NAME
RECIPIENT AFFILIATION
PARRISHi J. V.
Public
Power
Supp
1 g System
SiJBJECT:
Forwards insp'ept
50-397/93-42
on 93092'P-1124.
No violations
noted. In-office insp
conducted
to reviee
Rev
18 to emergency
plan implementing
procedure
13. 1. li "Classifying Emergency.
"
DISTPIBVTION CODE:
IEOtD
COPIES
RECEIVED: LTR g ENCL JSIZE: 3
TITLE: General
<50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PDV PD
COP IES
LTTR ENCL
1
1
REC IP IENT
ID CODE/NAME
CLIFFORDI J
COPIES
LTTR ENCL
1
1
INTERNAL:
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
NRR/DR IL/RPEB
NRR/PMAS/ILPB1
NUDOCS-ABSTRACT
OGC/HDSl
RES/HFB
EXTERNAL:
EG8iG/BRYCEI J. H.
1
1
1
1
1
1
1
1
1
~
1
1
1
1
1
1
1
1
AEOD/DEIB
AEOD/DSP/TPAB
DEDRQ
NRR/DRCH/HHFB
-NRR/DRSS/PEPB
NRR /P MAS/ILPB2
+a~a
OS
RGN5
FILE
01
NRC
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
NOTE TO ALL R1DS
REC!PiENTS:
PLEAS" HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROO!! P 1-37 (EXT. 504-'ZG."5) TO ELIM1NATEYOUR NAME FROM DISTR1BUT1ON
LiSTS FOR DOCUMENTS YOU DOV,'T FEED!
TOTAL NUMBER OF
COP IES REQUIRED:
LTTR
24
ENCL
24
~8 REgy
(4
0
Cp
I
0O
IlA
'C
0
Vi~p
y0
(f
++*++
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION V
1450 MARIALANE
WALNUTCREEK. CAUFORNIAS4596-5368
DEC 14 19%
Docket No. 50-397
Washington Public Power Supply System
3000 George
Way
P. 0.
Box 968,
MD 1023
Richland,
99352
Attention:
Mr. J.
V. Parrish
Assistant
Managing Director for
Operations
SUBJECT:
NRC
INSPECTION REPORT 50-397/93-42
During the period September
29 through
November 24,
1993,
Ms.
G.
Good of this
office conducted
an in-office inspection of activities authorized
by
NRC
License
No. NPF-21.
At the conclusion of the inspection,
Ms.
Good discussed
our findings with members of your staff identified in the enclosed report.
The in-office inspection
was conducted to review Revision
18 to emergency
plan
implementing procedure
(EPIP)
13. 1. 1, "Classifying the Emergency."
This
procedure
was submitted in accordance
with the provisions of 10 CFR 50.54(q).
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,,
we will be glad to
discuss
them with you.
Sincerely,
Robert J.
Pa e,
Ch1ef
Safeguards,
Emergency
Preparedness,
and Non-Power Reactor
Branch
Enclosure:
Inspection
Report No, 50-397/93-42
9312300053
931214
ADOCK 05000397
Q
~
~
Washington Public Power Supply System
Inspection
Report
No. 50-397/93-42
cc w/enclosure:
D. Coleman,
Acting Hanager,
Regulatory
Programs,
J.
W. Swailes,
WNP-2 Plant Hanager,
Hr. A. G. Hosier, Licensing Hanager,
G.
E. Doupe,
Esq.,
Chairman,
Benton County Board of Commissioners
H.
H. Phillips, Esq.,
Winston
& Strawn
Warren A. Bishop;
Energy Facility Site Evaluation Council
L. Hoore,
FEHA, Region
X
1
Washington Public Power Supply System
Inspection
Report
No. 50-397/93-42
bcc w/enclosure:
Docket File
Resident
Inspector
Project Inspector
A..Hcgueen
G.
Cook
B. Faulkenberry
R.. Erickson,
NRR/PEPB
bcc w/o,enclosure:
H. Smith
D. Clevenger
UEST
COPY
P
TO
a~~4
<~ ~~
YES
NO
(
.
YE
N
YES
0
z /wv
ood &
RPa
e
12/g /93
12//4-/93