ML17290A843

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/93-42 on 930929-1124.No Violations noted.In-office Insp Conducted to Review Rev 18 to Emergency Plan Implementing Procedure 13.1.1, Classifying Emergency
ML17290A843
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/14/1993
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17290A844 List:
References
NUDOCS 9312300053
Download: ML17290A843 (6)


See also: IR 05000397/1993042

Text

FORD

1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (BIDS)

ACCESSION

NBR: zi312300053

DOC. DATE: 'V3/12/14

NOTARIZED:

NO

DOCKET

FACIL: 56-3'77

NPPSS Nuclear Pro Jecti

Unit 2I

Washington

Public

Poee

05000397

AUTH. NAME

AUTHOR AFFILIATION

PATEI R. J.

Region

5 (Post

820201)

REC IP. NAME

RECIPIENT AFFILIATION

PARRISHi J. V.

Washington

Public

Power

Supp

1 g System

SiJBJECT:

Forwards insp'ept

50-397/93-42

on 93092'P-1124.

No violations

noted. In-office insp

conducted

to reviee

Rev

18 to emergency

plan implementing

procedure

13. 1. li "Classifying Emergency.

"

DISTPIBVTION CODE:

IEOtD

COPIES

RECEIVED: LTR g ENCL JSIZE: 3

TITLE: General

<50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PDV PD

COP IES

LTTR ENCL

1

1

REC IP IENT

ID CODE/NAME

CLIFFORDI J

COPIES

LTTR ENCL

1

1

INTERNAL:

ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/DR IL/RPEB

NRR/PMAS/ILPB1

NUDOCS-ABSTRACT

OGC/HDSl

RES/HFB

EXTERNAL:

EG8iG/BRYCEI J. H.

NSIC

1

1

1

1

1

1

1

1

1

~

1

1

1

1

1

1

1

1

AEOD/DEIB

AEOD/DSP/TPAB

DEDRQ

NRR/DRCH/HHFB

-NRR/DRSS/PEPB

NRR /P MAS/ILPB2

+a~a

OS

RGN5

FILE

01

NRC

PDR

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0

NOTE TO ALL R1DS

REC!PiENTS:

PLEAS" HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROO!! P 1-37 (EXT. 504-'ZG."5) TO ELIM1NATEYOUR NAME FROM DISTR1BUT1ON

LiSTS FOR DOCUMENTS YOU DOV,'T FEED!

TOTAL NUMBER OF

COP IES REQUIRED:

LTTR

24

ENCL

24

~8 REgy

(4

0

Cp

I

0O

IlA

'C

0

Vi~p

y0

(f

++*++

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK. CAUFORNIAS4596-5368

DEC 14 19%

Docket No. 50-397

Washington Public Power Supply System

3000 George

Washington

Way

P. 0.

Box 968,

MD 1023

Richland,

Washington

99352

Attention:

Mr. J.

V. Parrish

Assistant

Managing Director for

Operations

SUBJECT:

NRC

INSPECTION REPORT 50-397/93-42

During the period September

29 through

November 24,

1993,

Ms.

G.

Good of this

office conducted

an in-office inspection of activities authorized

by

NRC

License

No. NPF-21.

At the conclusion of the inspection,

Ms.

Good discussed

our findings with members of your staff identified in the enclosed report.

The in-office inspection

was conducted to review Revision

18 to emergency

plan

implementing procedure

(EPIP)

13. 1. 1, "Classifying the Emergency."

This

procedure

was submitted in accordance

with the provisions of 10 CFR 50.54(q).

No violations of NRC requirements

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,,

we will be glad to

discuss

them with you.

Sincerely,

Robert J.

Pa e,

Ch1ef

Safeguards,

Emergency

Preparedness,

and Non-Power Reactor

Branch

Enclosure:

Inspection

Report No, 50-397/93-42

9312300053

931214

PDR

ADOCK 05000397

Q

PDR

~

~

Washington Public Power Supply System

Inspection

Report

No. 50-397/93-42

cc w/enclosure:

D. Coleman,

Acting Hanager,

Regulatory

Programs,

WPPSS

J.

W. Swailes,

WNP-2 Plant Hanager,

WPPSS

Hr. A. G. Hosier, Licensing Hanager,

WPPSS

G.

E. Doupe,

Esq.,

WPPSS

Chairman,

Benton County Board of Commissioners

H.

H. Phillips, Esq.,

Winston

& Strawn

Warren A. Bishop;

Energy Facility Site Evaluation Council

L. Hoore,

FEHA, Region

X

1

Washington Public Power Supply System

Inspection

Report

No. 50-397/93-42

bcc w/enclosure:

Docket File

Resident

Inspector

Project Inspector

A..Hcgueen

G.

Cook

B. Faulkenberry

R.. Erickson,

NRR/PEPB

bcc w/o,enclosure:

H. Smith

D. Clevenger

UEST

COPY

REO

P

TO

PDR

a~~4

<~ ~~

YES

NO

(

.

YE

N

YES

0

z /wv

ood &

RPa

e

12/g /93

12//4-/93