ACCELERATED DISTRIBUTION DEMONSTVTION SYSTEM NOTARIZED:
NO DOCKET 2, Washington Public Powe 05000397 REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)
'CCESSION NBR:9312150023 DOC.DATE:
FACXL:50-397 WPPSS Nuclear Project, Unit AUTH.NAME AUTHOR AFFILXATION EMBREE,D.G.
Washington Public Power Supply System PARRISH,J.V.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFXLIATION
SUBJECT:
Monthly operating rept for Nov 1993 for WPPSS
- 2. /931208 ltr.
DXSTRIBUTION CODE:
IE24D COPIES RECEIVED LTR ENCL SIZE:
TXTLE: Monthly Operating Report (per Tech Specs)
NOTES:
D RECIPIENT ID"CODE/NAME PDV LA CLIFFORD,J INTERNAL'CRS AEOD/DSP/TPAB NRR/DRXL/RPE 8 RGN5 EXTERNAL: EGGG BRYCE,J.H NSIC COPXES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PDV PD AEOD/DOA RR OEAB REG FILE 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
A
'A 0
l
ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352 December 8, 1993 G02-93-284 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Dear Sirs:
Subject:
NUCLEAR PLANTNO. 2 MONTHLYOPERATING REPORT NOVEMBER, 1993 Transmitted herewith is the Monthly Operating Report for the month of November 1993 as required by our Technical Specifications 6.9.1.6.
Sincerely,
. V. Parrish Assistant Managing Director, Operations (MD 1023)
JVP:DGE CC:
Mr. W.H. Lovelace, NRC, Washington, DC Mr. B.H. Faulkenburry, NRC Region V Mr. R.C. Barr, NRC Resident Inspector (901A)
Ms. D. Sherman, ANILibrary
, Mr. J.T. Wheelock, INPO Mr. C. Bergesen, UtilityData Institute Mr. J.T. Irish, BPA (399) 9312150023 931130 PDR 'DOCK 05000397 R
OPERATING STATUS REPORT for WNP-2 Date:
December 1, 1993 2.
3.
4 5.
6.
7.
8.
9.
10.
11 ~
n/a n/a Docket:
50-397 Reporting Period:
NOVEMBER 1993 Outage + On-Line Hours:
720.0 UtilityContact:
David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):
3323 Nameplate Rating (Gross MW, ):
1200.9 Design Electrical Rating (Net MW,):
1120 Maximum Dependable Capacity (Gross MW,):
1132*
Maximum Dependable Capacity (Net MW, ):
1086*
Ifchanges occur above since last report, give reasons:
- Re-calculated MDC for most restrictive month due to environmental effects, back to Jan.
1, 1993.
Power to which restricted, ifany (Net MW,):
Reasons for restrictions, ifany:
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MVH)
Gross Electrical Energy (MWH)
Net Electrical Energy (MPH)
Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)
Unit Capacity Factor (DER Net)
Unit Forced Outage Rate Forced Outage Hours MONTH 720.0 720.0 0.0 720.0 0.0 2,384,392 831,970 801,771 100.0%
100.0%
102.5%
99.4%
0.0%
0.0 YEAR 8,016.0 6,217.5 0.0 6,015.3 0.0 19,135,479 6,604,560 6,308,052 75.0%
75.0%
72.5%
70.3%
9.2%
612.0 CUMULATIVE 78,584.2 55,366.2 340.4 53,323.0 381.7 156,300,129 52,453,650 50,258,471 67.9%
68.3%
58.5%
58.1%
12.9%
7,885.3 26.
27.
Shutdowns scheduled over the next 6 months (type, date, duration):
Refueling Outage, April 15, 1994, 60 Days.
Ifcurrently shutdown estimated startup date:
n/a Note:
Cumualtive Unit Capacity Factors (MDC 8c DER) are calculated with weighted averages.
AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD:
NOVEMBER 1993 DOCKET NO.:
50-397 UNIT:
WNP-2 DATE:
December 1, 1993 COMPLETED BY:
D. G. Embree TELEPHONE:
(509) 377-8448 DAY AVERAGEDAILYPOWER LEVEL (Net MWe)
AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15 1115 1113 1102 1117 1119 1029 1120 1121 1120 1117 1120 1116 1118 1119 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1116 1114 1114 1114 1120 1110 1117 1118 1120 1120 1118 1119 1121 1118 1112 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures willbe used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:
NOVEMBER 1993 DOCKET NO.:
50-397 UNIT NAME:
WNP-2 DATE:
December 1, 1993 COMPLETED BY:
D.G. Embree TELEPHONE:
(509) 377-844 No.
Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Pievent Recurrence NONE SUIUIMARY:
WNP-2 operated near full power during the month with no outages or significant power reductions (>20%).
TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Administration G - Operational Error H - Olher METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREG<161 Exhibits F &H