- TAC:M86491 + (10:01:51, 8 January 2025)
- GO2-94-135, Transmits Results of Exam & Evaluation of Flaw in Recirculation Piping Weld 20RRC(6)-8,per GL 88-01 & Results of Evaluation of Nascrac Methodology,In Response to 930611 Request Re Review of Insp Rept on Flaw in Subj Piping + (10:01:52, 8 January 2025)
- 05000397/LER-1993-001, :on 930213,determined That Both Trains of SPC of RHR System Were Inoperable Due to LOP Coincident W/Lpci Safety Function.Reviews & Safety Evaluations Has Been Enhanced + (10:01:54, 8 January 2025)
- GO2-94-134, Forwards Proprietary Overhead Slides to Be Presented During Meeting W/Nrc Staff.Encl Withheld (Ref 10CFR2.790(b) + (10:01:55, 8 January 2025)
- ML17291A116 + (10:01:57, 8 January 2025)
- GO2-94-128, Informs of Completion of Updated Ipe,Including Review Comments.However,Addl Mgt Review Will Allow More Effective Implementation of IPE Recommendations & Insights,Therefore, Supply Sys Will Submit IPE by 940727 + (10:01:58, 8 January 2025)
- GO2-94-130, Monthly Operating Rept for May 1994 for WNP-2 + (10:01:59, 8 January 2025)
- ML17291A112 + (10:02:01, 8 January 2025)
- TAC:M75019 + (10:02:04, 8 January 2025)
- ML17291A106 + (10:02:05, 8 January 2025)
- ML17291A081 + (10:02:06, 8 January 2025)
- ML17291A104 + (10:02:06, 8 January 2025)
- ML17291A052 + (10:02:08, 8 January 2025)
- ML17291A045 + (10:02:09, 8 January 2025)
- ML17291A009 + (10:02:10, 8 January 2025)
- ML17291A008 + (10:02:10, 8 January 2025)
- PNP 2017-062, Submittal of 2017 Refueling Outage, 1R25, 180-Day Steam Generator Tube Inspection Report + (10:02:12, 8 January 2025)
- GO2-92-242, Responds to NRC Re Violations Noted in Insp Rept 50-397/92-28.Corrective Actions:Mechanical Maint Personnel Counseled on Importance of Maintaining Radiation Barrier Postings at All Times + (10:02:13, 8 January 2025)
- ML17290B270 + (10:02:13, 8 January 2025)
- GO2-92-186, Monthly Operating Rept for Jul 1992 for WNP-2 + (10:02:15, 8 January 2025)
- ML17290B259 + (10:02:15, 8 January 2025)
- ML17290B232 + (10:02:24, 8 January 2025)
- ML17290B227 + (10:02:25, 8 January 2025)
- IR 05000397/2017406 + (10:02:26, 8 January 2025)
- ML17290B225 + (10:02:26, 8 January 2025)
- 05000397/LER-1991-036, :on 911226,missed ASME Section XI Test for Fuel Pool Cooling Relief Valve FPC-RV-117B Violated TS Sections 4.0.2 & 4.0.5.Cause Not Identified.Required Surveillance Testing Performed on FPC-RV-117B + (10:02:29, 8 January 2025)
- IR 05000397/1994016 + (10:02:31, 8 January 2025)
- ML17290B203 + (10:02:32, 8 January 2025)
- ML17290B200 + (10:02:33, 8 January 2025)
- ML17290B201 + (10:02:33, 8 January 2025)
- ML17290B198 + (10:02:34, 8 January 2025)
- 05000397/LER-1994-008, :on 940426,CROs Observed Slight Reactor Power Fluctuations on Six Aprms.Caused by Degraded Condition of Reactor Recirculation (RRC) FCV Position Transmitter. Replaced RRC FCV Position Transmitters + (10:02:37, 8 January 2025)
- GO2-94-126, Responds to NRC Re Violations Noted in Insp Rept 50-397/94-12.Corrective Actions:Two Deficiencies Associated W/Chiller CCH-CR-1B Corrected & Chiller Returned to Svc on 940411 + (10:02:38, 8 January 2025)
- ML17290B191 + (10:02:42, 8 January 2025)
- GO2-94-123, Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow, Which Responds to Questions on Cycle 10 Operation + (10:02:43, 8 January 2025)
- ML17290B190 + (10:02:43, 8 January 2025)
- ML17290B186 + (10:02:45, 8 January 2025)
- 05000397/LER-1994-009, :on 940419,CI Provisions for Two Containment Monitoring Systems Were Inoperable Due to Inboard Valves Not Functioning as Ci Valves in Event of Loca.Corrective Action:Replace EFC Valves W/Check Valves + (10:02:47, 8 January 2025)
- GO2-94-115, Forwards Response to NRC 931229 RAI Re Power Uprate,W/Regard to Increase of Bottom Head Pressure & High Pressure Scram Setpoint on Structural & Functional Integrity of Control Rod Drive Sys + (10:02:48, 8 January 2025)
- GO2-94-116, Responds to Request for Addl Info Re 940217 Request for Amend to TS to Support Hydrostatic Testing + (10:02:49, 8 January 2025)
- ML17290B180 + (10:02:50, 8 January 2025)
- ML17290B179 + (10:02:51, 8 January 2025)
- TAC:M88521 + (10:02:52, 8 January 2025)
- GO2-94-105, Monthly Operating Rept for Apr 1994 for WNP 2 + (10:02:53, 8 January 2025)
- ML17290B177 + (10:02:53, 8 January 2025)
- GO2-94-103, Responds to Request for Info Re 930709 Submittal to Increase WNP-2 Licensed Power Level + (10:02:55, 8 January 2025)
- 05000397/LER-1994-007, :on 940410,RCIC Level 8 Isolation Instrument Calibr Outside TS Allowable Value.Caused by Failure to Self Check.Corrective Actions:Personnel Involved Counseled.W/ + (10:02:55, 8 January 2025)
- GO2-94-109, Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication + (10:02:57, 8 January 2025)
- ML17290B173 + (10:02:57, 8 January 2025)
- ML17290B168 + (10:02:59, 8 January 2025)
- IR 05000397/1994009 + (10:03:00, 8 January 2025)