Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LIC-98-0001, Provides Addl Info Which Supports Request Exemption from 10CFR50 App R.Updated Status of long-term Corrective Actions Re Lube Oil Leakage from RC-3D Reactor Coolant Pump Motor, Discussed + (09:27:00, 8 December 2024)
- ML20199J116 + (09:27:01, 8 December 2024)
- ML20199J114 + (09:27:01, 8 December 2024)
- ML20199J111 + (09:27:02, 8 December 2024)
- ML20199J107 + (09:27:03, 8 December 2024)
- 05000269/LER-1997-011-01, :on 971228,initiated Shutdown Due to Calculated 404 Gallons Per Day SG Leak.Caused by Inadequate Process Control.Repaired Leaks + (09:27:05, 8 December 2024)
- ML20199J103 + (09:27:06, 8 December 2024)
- ML20199J104 + (09:27:06, 8 December 2024)
- ML20199J096 + (09:27:08, 8 December 2024)
- ML20199J097 + (09:27:08, 8 December 2024)
- ML20199J094 + (09:27:09, 8 December 2024)
- ML20199J091 + (09:27:10, 8 December 2024)
- PNO-II-98-005, on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 980205 + (09:27:15, 8 December 2024)
- ML20199J084 + (09:27:15, 8 December 2024)
- NLS8600198, Responds to NRC Re Violations Noted in Insp Rept 50-298/86-06.Corrective Actions:Training Dept Instructions Revised & Written Exams Will Be Administered Following Requalification Lectures + (09:27:17, 8 December 2024)
- ML20199J080 + (09:27:17, 8 December 2024)
- ML20199J075 + (09:27:18, 8 December 2024)
- BSEP-98-0016, Responds to NRC Re Violations Noted in Insp Repts 50-324/97-14 & 50-325/97-14.Corrective Actions:Evaluation of Other Plant Areas for Similar Radiological Control Deficiencies Will Be Performed + (09:27:22, 8 December 2024)
- 05000293/LER-1986-013, :on 860530,discovered That LER for 840227 Discovery of Installation of Seismically Unqualified GE Cfd Relays for Diesel Generator Differential Protection Had Not Been Submitted.Relays Tripped on 860426 + (09:27:24, 8 December 2024)
- ML20199J067 + (09:27:25, 8 December 2024)
- ML20199J064 + (09:27:25, 8 December 2024)
- ML20199J059 + (09:27:26, 8 December 2024)
- ML20199J057 + (09:27:27, 8 December 2024)
- ML20199J055 + (09:27:28, 8 December 2024)
- ML20199J054 + (09:27:29, 8 December 2024)
- ML20199J048 + (09:27:30, 8 December 2024)
- ML20199J043 + (09:27:31, 8 December 2024)
- ML20199J042 + (09:27:32, 8 December 2024)
- ML20199J041 + (09:27:32, 8 December 2024)
- ML20199J038 + (09:27:33, 8 December 2024)
- ML20199J037 + (09:27:35, 8 December 2024)
- LR-N970746, Informs That Util Is Revising Commitment to Determine Total Sludge Loading from Current Refueling Outage to Next Refueling Outage,Currently Scheduled to Begin in mid-Feb 1999,re Ieb 96-003, Potential Plugging of ECC Suction.. + (09:27:36, 8 December 2024)
- ML20199J035 + (09:27:36, 8 December 2024)
- ML20199J030 + (09:27:37, 8 December 2024)
- ML20199J031 + (09:27:37, 8 December 2024)
- ML20199J028 + (09:27:39, 8 December 2024)
- ML20199J027 + (09:27:40, 8 December 2024)
- ML20199J026 + (09:27:41, 8 December 2024)
- ML20199J025 + (09:27:42, 8 December 2024)
- ML20199J024 + (09:27:42, 8 December 2024)
- ML20199J022 + (09:27:43, 8 December 2024)
- ML20199J018 + (09:27:44, 8 December 2024)
- RC-97-0240, Provides Confirmation of Completion of Actions Taken in Response to GL 96-01, Testing of Safety-Related Logic Circuits, Per 10CFR50.54(f) + (09:27:45, 8 December 2024)
- ML20199J015 + (09:27:46, 8 December 2024)
- W3P86-1845, Discusses Progress on Procurement & Installation of plant- Specific Simulator for Training & Other Tasks.Simulator Will Not Be Ready for Training Use Until 870301 Due to Vendor Singer Co (Link) Problems + (09:27:46, 8 December 2024)
- ML20199J012 + (09:27:47, 8 December 2024)
- NPL-97-0751, Special Rept:On 971023,low Temp Overpressure Protection Sys Operation Occurred.Caused by Starting Reactor Coolant Pump w/water-solid Reactor Coolant Sys.Operating Personnel Will Be Briefed on Event + (09:27:51, 8 December 2024)
- ML20199J010 + (09:27:51, 8 December 2024)
- 05000277/LER-1997-010-02, :on 971229,2A RFPT Failed to Trip When RO Pushed CR 2A RFPT Trip push-button.Caused by Intermittent Failure Mechanism.Repaired,Reinstalled & Tested Operability of 2A RFPT + (09:27:53, 8 December 2024)
- ML20199J005 + (09:27:54, 8 December 2024)
- ML20199J003 + (09:27:55, 8 December 2024)