Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199L037 + (09:05:45, 8 December 2024)
- ML20199L035 + (09:05:46, 8 December 2024)
- PNO-I-86-048, on 860704,unscheduled Reactor Shutdown Occurred Due to Increasing Unidentified Drywell Leakage.Caused by Packing Leak on Manual LPCI Injection Valve.Manual Valve Backseated.Startup Planned for 860711 + (09:05:47, 8 December 2024)
- PNO-I-86-049, on 860706,18-inch Piece of Blading from Low Pressure Turbine 31 Broke Off During Main Generator Startup. Turbine Vendor Evaluating Damage.Repair Expected to Take at Least 1 Wk + (09:05:50, 8 December 2024)
- B17590, Application for Amend to License DPR-65,removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys, from Plant TS + (09:05:51, 8 December 2024)
- ML20199L028 + (09:05:51, 8 December 2024)
- ML20199L026 + (09:05:52, 8 December 2024)
- A97061, Informs NRC of Rev to NOV Commitment Made in Responding to Violations Noted in Insp Repts 50-295/96-06 & 50-304/96-06.Test Requirements Are Now Assigned from post- Maint Testing Matrix During Work Planning Effort + (09:05:53, 8 December 2024)
- ML20199L024 + (09:05:54, 8 December 2024)
- 05000348/LER-1998-008-01, :on 981223,reactor Vessel Support Concrete Design Bases Temperature Exceeded Due to Closed Cooling Damper.Caused by Personnel Error.Damper Opened & Secured in Position.With + (09:05:55, 8 December 2024)
- ML20199L022 + (09:05:56, 8 December 2024)
- ML20199L021 + (09:05:57, 8 December 2024)
- ML20199L019 + (09:06:28, 8 December 2024)
- ML20199L017 + (09:06:29, 8 December 2024)
- ML20199L016 + (09:06:29, 8 December 2024)
- ML20199L015 + (09:06:30, 8 December 2024)
- ML20199L014 + (09:06:31, 8 December 2024)
- ML20199L011 + (09:06:56, 8 December 2024)
- ML20199L008 + (09:06:59, 8 December 2024)
- ML20199L007 + (09:07:00, 8 December 2024)
- ML20199L005 + (09:07:01, 8 December 2024)
- ML20199L002 + (09:07:02, 8 December 2024)
- ML20199L003 + (09:07:02, 8 December 2024)
- ML20199L001 + (09:07:03, 8 December 2024)
- ML20199K998 + (09:07:03, 8 December 2024)
- ML20199K996 + (09:07:04, 8 December 2024)
- ML20199K994 + (09:07:05, 8 December 2024)
- ML20199K993 + (09:07:05, 8 December 2024)
- ML20199K992 + (09:07:06, 8 December 2024)
- ML20199K991 + (09:07:06, 8 December 2024)
- ML20199K990 + (09:07:07, 8 December 2024)
- ML20199K987 + (09:07:08, 8 December 2024)
- ML20199K986 + (09:07:08, 8 December 2024)
- ML20199K983 + (09:07:12, 8 December 2024)
- ML20199K985 + (09:07:12, 8 December 2024)
- ML20199K977 + (09:07:19, 8 December 2024)
- NG-98-0167, Application for Amend to License DPR-49,consisting of Request for TS Change RTS-299,revising Definitions of Cold Condition & Cold Shutdown & Adding Section 3.17,vessel Hydrostatic Pressure & Leak Testing,Per NUREG 1433,Rev 1 + (09:07:20, 8 December 2024)
- ML20199K974 + (09:07:21, 8 December 2024)
- 05000298/LER-1998-012, :on 981217,overspeed Trip of HPCI & RCIC Sys During 150 Lbs Vessel Pressure Test Was Noted.Caused by Inadequate Surveillance Procedure.Immediate Action Was Taken to Vent HPCI & RCIC Common Suction Piping.With + (09:07:23, 8 December 2024)
- ML20199K972 + (09:07:24, 8 December 2024)
- ML20199K970 + (09:07:25, 8 December 2024)
- IR 05000352/1986014 + (09:07:27, 8 December 2024)
- ML20199K964 + (09:07:27, 8 December 2024)
- ML20199K963 + (09:07:28, 8 December 2024)
- ML20199K961 + (09:07:29, 8 December 2024)
- ML20199K962 + (09:07:29, 8 December 2024)
- ML20199K960 + (09:07:30, 8 December 2024)
- ML20199K958 + (09:07:31, 8 December 2024)
- ML20199K957 + (09:07:32, 8 December 2024)
- RBG-44306, Forwards RBS Environmental Operating Rept for Period 960829-970828 & Brief Aerial Photography Analysis of RBS at St Francisville,LA:1996-1997 + (09:07:33, 8 December 2024)
- ML20199K952 + (09:07:34, 8 December 2024)