Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202H900 + (07:22:51, 8 December 2024)
- ML20202H901 + (07:22:51, 8 December 2024)
- ML20202H898 + (07:22:52, 8 December 2024)
- ML20202H896 + (07:22:53, 8 December 2024)
- 05000278/LER-1986-005-02, :on 860306,low Level Scram & Group II & III Isolations Occurred as Reactor Pressure & Level Adjusted. Caused by Decrease in Main Condenser Vacuum Due to Maint Performed on Pump Drive Shaft + (07:22:55, 8 December 2024)
- ML20202H888 + (07:22:56, 8 December 2024)
- 3F0298-17, Forwards List of Commitments,Conclusions Presented in 980130 Telcon,Description of long-term CAs Required to Resolve Conflicts within FSAR & Summary of Previously Docketed Correspondence Re Protection Against Effects of LOCA + (07:22:57, 8 December 2024)
- ML20202H884 + (07:22:58, 8 December 2024)
- ML20202H882 + (07:22:58, 8 December 2024)
- 05000397/LER-1986-016, :on 860612,RWCU Sys Isolation Occurred.Caused by Instrument Technician Using Wrong Switch While Performing Channel Functional Test for RWCU High Delta Flow.Labels for Test Switches Will Be Improved + (07:23:00, 8 December 2024)
- 05000302/LER-1986-004, :on 860125,hydrogen & Oxygen Monitoring Channels Removed from Svc for Repair.Special Rept Required When Channels Remain Out of Svc for More than 14 Days Not Submitted within Required 30 Days + (07:23:02, 8 December 2024)
- NSD-NRC-98-5570, Forwards Proprietary & non-proprietary W Response to FSER Open Item 440.739F on AP600.W Status for Item Will Be Designated Action N. Proprietary Info Withheld Per 10CFR2.790 + (07:23:04, 8 December 2024)
- ML20202H858 + (07:23:09, 8 December 2024)
- ML20202H855 + (07:23:09, 8 December 2024)
- ML20202H853 + (07:23:10, 8 December 2024)
- ML20202H852 + (07:23:11, 8 December 2024)
- ML20202H850 + (07:23:12, 8 December 2024)
- IR 05000344/1986007 + (07:23:14, 8 December 2024)
- 05000414/LER-1986-024-01, :on 860605,discovered That Periodic Test of Nonautomatic Containment Isolation Valves Performed W/ Incomplete Valve Checklist on 860411 & 0511.Caused by Defective Procedure.Procedures Revised + (07:23:16, 8 December 2024)
- ML20202H844 + (07:23:17, 8 December 2024)
- 05000254/LER-1986-014, :on 860312,Nov 1985 Monthly Particulate Samples for Main Chimney & Reactor Bldg Vent Sys Lost & Science Applications Intl Corp (SAI) Could Not Locate Samples.Sai No Longer Offsite Lab + (07:23:35, 8 December 2024)
- ML20202H832 + (07:23:36, 8 December 2024)
- ML20202H831 + (07:23:36, 8 December 2024)
- ML20202H829 + (07:23:38, 8 December 2024)
- 05000454/LER-1986-002, :on 860126 & 0204,w/plant in Mode 1,process Radiation Monitor OPR31J (Main Control Room Outside Air Intake a) Went Into Interlock Mode Due to Spike on Monitor Iodine Channel.Caused by Bad Component + (07:23:40, 8 December 2024)
- ML20202H820 + (07:23:41, 8 December 2024)
- NSD-NRC-98-5567, Forwards Proprietary Change Page to W Response to FSER 0I 480.1085F,which Corrects Subscripts.Encl Withheld + (07:23:42, 8 December 2024)
- 05000341/LER-1986-003, :on 860311,during Surveillance Test of Div II Isolation Logic,Rwcu Sys Isolated.Caused by Repairman Incorrectly Lifting Thermocouple Lead in Div I Isolation Logic.Personnel Counseled + (07:23:44, 8 December 2024)
- 05000249/LER-1986-007-08, :on 860612,standby Gas Treatment Sys Started Automatically & Reactor Bldg Ventilation Sys Isolated.Caused by Personnel Error Resulting in Use of Incorrect Procedures. Personnel Counseled + (07:23:46, 8 December 2024)
- ML20202H802 + (07:23:48, 8 December 2024)
- ML20202H803 + (07:23:48, 8 December 2024)
- 05000354/LER-1986-029, :on 860611,control Area Chiller a Tripped on Low Refrigerant Pressure.Caused by Malfunction of Ball Float Valve.Valve Replaced + (07:23:50, 8 December 2024)
- 05000387/LER-1986-008, :on 860314,six Inadvertent Actuations of Reactor Protection Sys Channel a Occurred.Probably Caused by CRD Changeout Activities in under-vessel Area.Changeout Effort Will Be Reviewed W/Foremen + (07:23:52, 8 December 2024)
- ML20202H795 + (07:23:53, 8 December 2024)
- IR 05000295/1997022 + (07:23:54, 8 December 2024)
- ML20202H786 + (07:23:54, 8 December 2024)
- ML20202H779 + (07:23:58, 8 December 2024)
- ML20202H780 + (07:23:58, 8 December 2024)
- ML20202H774 + (07:24:03, 8 December 2024)
- 05000397/LER-1986-015, :on 860606,RWCU Sys Isolated During Leak Detection Sys Temp Indicator Calibr.Caused by Technician Incorrectly Lifting Lead.Technician Counseled & Training Package Modified to Include Calibr Procedure + (07:24:04, 8 December 2024)
- ML20202H769 + (07:24:07, 8 December 2024)
- ML20202H762 + (07:24:08, 8 December 2024)
- ML20202H761 + (07:24:09, 8 December 2024)
- ML20202H759 + (07:24:09, 8 December 2024)
- ML20202H753 + (07:24:15, 8 December 2024)
- ML20202H751 + (07:24:15, 8 December 2024)
- ML20202H748 + (07:24:16, 8 December 2024)
- ML20202H747 + (07:24:17, 8 December 2024)
- ML20202H746 + (07:24:17, 8 December 2024)
- ML20202H738 + (07:24:19, 8 December 2024)
- ML20202H739 + (07:24:19, 8 December 2024)