Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203P747 + (01:50:46, 8 December 2024)
- ML20203P745 + (01:50:47, 8 December 2024)
- IR 05000341/1986006 + (01:50:50, 8 December 2024)
- ML20203P743 + (01:50:50, 8 December 2024)
- ML20203P739 + (01:50:51, 8 December 2024)
- ML20203P738 + (01:50:52, 8 December 2024)
- ML20203P737 + (01:50:52, 8 December 2024)
- IR 05000483/1986008 + (01:50:53, 8 December 2024)
- ML20203P734 + (01:50:54, 8 December 2024)
- PNO-III-86-025C, existence of Cracking in Reactor Coolant Pump Shaft Not Yet Confirmed.Ultrasonic Testing & Other Nondestructive Tests,Including Dye Penetrant Testing & Microscopic Exam,Failed to Identify Indications of Cracking + (01:50:54, 8 December 2024)
- ML20203P731 + (01:50:55, 8 December 2024)
- ML20203P732 + (01:50:55, 8 December 2024)
- 05000382/LER-1986-007, :on 860406,fire Watch Tour for Fire Impairment 85-232 Not Satisfactorily Performed.Caused by Misnumbered Pages in Fire Watch Log.Responsibilities for Handling Logs Posted + (01:50:57, 8 December 2024)
- ML20203P729 + (01:50:58, 8 December 2024)
- ML20203P728 + (01:50:59, 8 December 2024)
- ML20203P727 + (01:50:59, 8 December 2024)
- ML20203P726 + (01:51:00, 8 December 2024)
- ML20203P725 + (01:51:01, 8 December 2024)
- 05000397/LER-1986-005, :on 860401,refueling Mode 5 Entered Prior to Completing Instrument Surveillances Required by Tech Specs. Caused by Inadequate Procedures.Tech Specs Received & Surveillances Performed + (01:51:02, 8 December 2024)
- ML20203P722 + (01:51:03, 8 December 2024)
- ML20203P721 + (01:51:04, 8 December 2024)
- ML20203P720 + (01:51:05, 8 December 2024)
- ML20203P719 + (01:51:05, 8 December 2024)
- ML20203P716 + (01:51:08, 8 December 2024)
- ML20203P714 + (01:51:10, 8 December 2024)
- ML20203P713 + (01:51:10, 8 December 2024)
- ML20203P707 + (01:51:12, 8 December 2024)
- ML20203P708 + (01:51:12, 8 December 2024)
- ML20203P706 + (01:51:13, 8 December 2024)
- ML20203P701 + (01:51:16, 8 December 2024)
- W3P86-0066, Forwards Response to SALP Board Rept 50-382/85-30 Transmitted by .Maint Dept Directive Issued in Feb 1985 to Provide Guidance in Minimizing ESFAS Actuations & Plant Trips + (01:51:17, 8 December 2024)
- 05000333/LER-1986-010, :on 860404,full Scram Occurred While Performing Main Turbine Stop Valve Limit Switch Instrument Functional Test.Cause Unknown.Affected Components Replaced & Sys Tested + (01:51:19, 8 December 2024)
- ML20203P695 + (01:51:21, 8 December 2024)
- ML20203P696 + (01:51:21, 8 December 2024)
- ML20203P694 + (01:51:22, 8 December 2024)
- ML20203P692 + (01:51:24, 8 December 2024)
- ML20203P691 + (01:51:25, 8 December 2024)
- ML20203P690 + (01:51:26, 8 December 2024)
- ML20203P688 + (01:51:27, 8 December 2024)
- ML20203P689 + (01:51:27, 8 December 2024)
- 2CAN058601, Forwards Vols 1 & 2 of Arkansas Nuclear One Unit 2,CRDR Final Summary Rept, Documenting Activities Re Commitment to Practical Applications of Human Factors Principles + (01:51:28, 8 December 2024)
- ML20203P685 + (01:51:29, 8 December 2024)
- ML20203P683 + (01:51:31, 8 December 2024)
- ML20203P664 + (01:51:33, 8 December 2024)
- ML20203P680 + (01:51:33, 8 December 2024)
- ML20203P663 + (01:51:34, 8 December 2024)
- ML20203P662 + (01:51:35, 8 December 2024)
- ML20203P661 + (01:51:36, 8 December 2024)
- ML20203P660 + (01:51:37, 8 December 2024)
- ML20203P659 + (01:51:37, 8 December 2024)
- 05000327/LER-1986-008, :860401,monthly Channel Check for Steam Generator narrow-range Level Shutdown Instrumentation Not Properly Performed on SI-3 Logs.Caused by SI-3 Incorrectly Written for wide-range Level Instruments + (01:51:39, 8 December 2024)
- ML20203P647 + (01:51:41, 8 December 2024)