Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20204C255 + (01:32:43, 8 December 2024)
- ML20204C252 + (01:32:43, 8 December 2024)
- ML20204C243 + (01:32:44, 8 December 2024)
- ML20204C240 + (01:32:45, 8 December 2024)
- ML20204C235 + (01:32:46, 8 December 2024)
- ML20204C237 + (01:32:46, 8 December 2024)
- ML20204C234 + (01:32:47, 8 December 2024)
- ML20204C228 + (01:32:48, 8 December 2024)
- ML20204C230 + (01:32:48, 8 December 2024)
- ML20204C223 + (01:32:49, 8 December 2024)
- ML20204C222 + (01:32:50, 8 December 2024)
- B12467, Forwards Revised Response to NRC Human Factors Engineering Items on Three Loop Operation of Plant as Suppl to 870220 Submittal,Per Request + (01:32:51, 8 December 2024)
- ML20204C214 + (01:32:51, 8 December 2024)
- ML20204C212 + (01:32:52, 8 December 2024)
- ML20204C211 + (01:32:53, 8 December 2024)
- 05000328/LER-1987-004-01, :on 870220,cable in Electrical Penetration 36 Found W/O Redundant Overcurrent Protection.Caused by Personnel Error.Circuit Breaker/Fuse Combination Corrected. Work Request Submitted on 861014 + (01:32:58, 8 December 2024)
- ML20204C207 + (01:32:59, 8 December 2024)
- ML20204C205 + (01:32:59, 8 December 2024)
- ML20204C203 + (01:33:00, 8 December 2024)
- ML20204C200 + (01:33:01, 8 December 2024)
- ML20204C198 + (01:33:01, 8 December 2024)
- LD-78-086, Responds to NRC Request for List of All Appl & Request for Review to Be Submitted Between 781117 & 811231.FSAR Was Submitted 781020 & No Others Anticipated + (01:33:02, 8 December 2024)
- ML20204C195 + (01:33:03, 8 December 2024)
- ML20204C194 + (01:33:03, 8 December 2024)
- ML20204C192 + (01:33:04, 8 December 2024)
- ML20204C190 + (01:33:05, 8 December 2024)
- ML20204C186 + (01:33:06, 8 December 2024)
- ML20204C189 + (01:33:06, 8 December 2024)
- ML20204C184 + (01:33:07, 8 December 2024)
- ML20204C182 + (01:33:08, 8 December 2024)
- ML20204C180 + (01:33:08, 8 December 2024)
- ML20204C173 + (01:33:09, 8 December 2024)
- ML20204C172 + (01:33:10, 8 December 2024)
- ML20204C169 + (01:33:11, 8 December 2024)
- ML20204C170 + (01:33:11, 8 December 2024)
- ML20204C167 + (01:33:12, 8 December 2024)
- ML20204C165 + (01:33:12, 8 December 2024)
- ML20204C158 + (01:33:13, 8 December 2024)
- ML20204C153 + (01:33:14, 8 December 2024)
- ML20204C156 + (01:33:14, 8 December 2024)
- ML20204C151 + (01:33:15, 8 December 2024)
- ML20204C148 + (01:33:16, 8 December 2024)
- ML20204C145 + (01:33:17, 8 December 2024)
- 05000323/LER-1986-027, :on 861213,time Limit of Tech Spec 4.11.2.1.2, Table 4.11-2,Item 4 (Continuous Particulate Sample),Exceeded for Plant Vent Particulate Sample.Caused by Personnel Error. Personnel Counseled & Tailboard Meeting Held + (01:33:19, 8 December 2024)
- 05000440/LER-1987-008, :on 870218,div 1,class 1E 125 Volt Dc Battery Failed to Meet Allowable Electrolyte Temp of 72 F.Caused by Personnel Error & Faulty Thermostat.Procedure Reviewed & Thermostat Replaced + (01:33:23, 8 December 2024)
- ML20204C138 + (01:33:24, 8 December 2024)
- ML20204C132 + (01:33:25, 8 December 2024)
- ML20204C130 + (01:33:26, 8 December 2024)
- 05000263/LER-1987-006, :on 870216,reactor Scram Occurred.Caused by Two Electrical Disturbances Propagating Through Div 1 Sys Due to Failure of Output Feedback Control Transformer.Power Supplies & Instrumentation Examined + (01:33:28, 8 December 2024)
- ML20204C123 + (01:33:32, 8 December 2024)
- B12473, Submits Addl Info in Support of 870206 Application for Amend to License DPR-65,revising Tech Specs Re Operability of CRD Mechanisms.High Power Reactor Trip Required Only Under Listed Conditions + (01:33:33, 8 December 2024)
- ML20204C114 + (01:33:33, 8 December 2024)