Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17338B204 + (18:04:57, 7 January 2025)
- ML17338B202 + (18:05:00, 7 January 2025)
- ML17338B201 + (18:05:01, 7 January 2025)
- ML17338B200 + (18:05:02, 7 January 2025)
- L-79-289, Forwards Revised Page 2 of Integrated Leak Rate Test Rept + (18:05:03, 7 January 2025)
- ML17338B198 + (18:05:04, 7 January 2025)
- 05000251/LER-1979-017-03, /03L-0:on 790903,condensate Water Tank Contained Less than 185,000 Gallons Required by Tech Specs.Caused by Increased Water Demand for Steam Generator Blowdown & Reduced Water Treatment Plant Output + (18:05:05, 7 January 2025)
- 05000251/LER-1979-017, Forwards LER 79-017/03L-0 + (18:05:07, 7 January 2025)
- 05000251/LER-1979-015-03, /03L-0:on 790829,during Power operation,4A Boric Acid Transfer Pump Tripped on Thermal Overload & Declared Inoperable.Caused by Boric Acid Solidification in Recirculation Line.Recirculation Line Insulated + (18:05:09, 7 January 2025)
- 05000251/LER-1979-016-03, /03L-0:on 790830,boric Acid Transfer Pump Failed to Start.Caused by Malfunction of Line Starter.Contacts Were Cleaned & Pump Was Returned to Svc + (18:05:11, 7 January 2025)
- 05000251/LER-1979-016, Forwards LER 79-016/03L-0 + (18:05:12, 7 January 2025)
- 05000251/LER-1979-018-03, /03L-0:on 790911,charging Pump 4C Removed from Svc Due to Excessive Seal Leakage.Cause Not Given.Seal Was Replaced & Pump Returned to Svc.Evaluation Continues + (18:05:14, 7 January 2025)
- 05000251/LER-1979-018, Forwards LER 79-018/03L-0 + (18:05:16, 7 January 2025)
- ML17338B186 + (18:05:17, 7 January 2025)
- IR 05000250/1979025 + (18:05:18, 7 January 2025)
- ML17338B180 + (18:05:20, 7 January 2025)
- ML17338B179 + (18:05:21, 7 January 2025)
- ML17338B178 + (18:05:22, 7 January 2025)
- ML17338B176 + (18:05:23, 7 January 2025)
- ML17338B175 + (18:05:24, 7 January 2025)
- ML17338B174 + (18:05:26, 7 January 2025)
- ML17338B172 + (18:05:27, 7 January 2025)
- ML17338B170 + (18:05:28, 7 January 2025)
- L-79-285, Forwards Info Re Fire Protection Mods Described in Safety Evaluation for Amends 45 & 37 to Licenses DPR-31 & DPR-41, Respectively.Three Oversize Drawings Encl + (18:05:29, 7 January 2025)
- ML17338B168 + (18:05:31, 7 January 2025)
- L-79-284, Responds to NRC Re Integration Between safety- Grade Sys & nonsafety-grade Sys.Forwards Descriptions of Four Potential Interaction Scenarios & Generic Vendor Recommendations Justifying Continued Operation + (18:05:32, 7 January 2025)
- ML17338B159 + (18:05:33, 7 January 2025)
- L-79-273, Responds to IE Bulletin 79-14 Seismic Analysis for As- Built Safety-Related Piping Sys. Two Noncompliances Found After Insp.Renews Request for Extension of Insp Schedule. Next Status Rept Will Be Submitted by 791115 + (18:05:34, 7 January 2025)
- ML17338B153 + (18:05:36, 7 January 2025)
- L-79-269, Responds to IE Bulletin 79-18 Audibility Problems Encountered W/Evacuation of Personnel from High Noise Area. Review of Configuration & Performance of Site Communications Network Revealed Improvable Areas.Plant Mod Implemented + (18:05:37, 7 January 2025)
- 05000251/LER-1979-014-01, /01T-0:on 790828,during Performance of Evaluation to Place Spent Fuel Pit Purification Demineralizer in Svc, 3,000 Gallon Overflow Occurred.Caused by Incomplete Communication & Failure to Follow Procedure.Unit Cleaned + (18:05:43, 7 January 2025)
- 05000251/LER-1979-014, Forwards LER 79-014/01T-0 + (18:05:44, 7 January 2025)
- L-79-279, Notifies That Response to a Schwencer & W Gammill Requests for Addl Info Re Grid Voltage & Distribution Sys Will Be Submitted on 791008 + (18:05:45, 7 January 2025)
- L-79-237, Forwards Response to IE Bulletin 79-17, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants + (18:05:47, 7 January 2025)
- ML17338B145 + (18:05:50, 7 January 2025)
- L-79-259, Forwards Response to IE Bulletin 79-21, Temp Effects on Level Measurements. Liquid Measuring Sys Reviewed to Determine Sys Used to Initiate Safety Action.Charts of Bias Due to Steam Generator & Pressurizer Pressure Changes Encl + (18:05:51, 7 January 2025)
- L-79-247, Responds to IE Bulletin 79-03, Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe Spools Mfg by Youngstown Welding & Engineering Co. List of Sys Containing Such Piping Under Review.Rept Re Safety Sys Uses Due 791015 + (18:05:52, 7 January 2025)
- ML17338B142 + (18:05:55, 7 January 2025)
- ML17338B139 + (18:05:56, 7 January 2025)
- L-79-242, Forwards Response to IE Bulletin 79-06C, Nuclear Incident at TMI - Suppl + (18:05:57, 7 January 2025)
- ML17338B137 + (18:05:57, 7 January 2025)
- 05000251/LER-1979-013-03, /03L-0:on 790815,charging Pump 4A Removed from Svc Due to Excessive Seal Leakage.Cause Under Investigation. Seal Was Replaced & Pump Tested & Returned to Svc + (18:06:00, 7 January 2025)
- 05000251/LER-1979-013, Forwards LER 79-013/03L-0 + (18:06:01, 7 January 2025)
- L-79-252, Forwards Response to IE Bulletin 79-15 Re Deep Draft Pumps. Provides Survey Results + (18:06:03, 7 January 2025)
- ML17338B127 + (18:06:03, 7 January 2025)
- ML17338B124 + (18:06:05, 7 January 2025)
- ML17338B122 + (18:06:06, 7 January 2025)
- 05000250/LER-1979-025-03, /0BL-0:on 790807,chemical & Vol Control Sys Holdup Tank Was Ruptured.Caused by Low Internal Tank Pressure.Unit Was Shut Down & Repairs Were Completed + (18:06:07, 7 January 2025)
- 05000250/LER-1979-025, Forwards LER 79-025/03L-0 + (18:06:09, 7 January 2025)
- L-79-265, Forwards Proposed Change Re Fire Protection Tech Specs for Licenses DPR-31 & DPR-41 to Delete Requirement That Screen Wash Sys Mods Be Completed by Nov 1979.Class I & II Amend Fees Encl + (18:06:10, 7 January 2025)
- ML17338B115 + (18:06:12, 7 January 2025)