Text
"~CO
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-250 TURKEY POINT NUCLEAR GENERATING UNIT NO.
3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 50 License No.
DPR-31 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
B.
C.
~ D.
E.
The application for amendment by Florida Power and Light Company (the licensee) dated August 7, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that stch activities will be conducted in compliance with the Commission' regulations; I
The issuance of this amendment will not be inimical to the common defense and'security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regul'ations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to paragraph 3.E.5.
Paragraph 3.E.5 of Facility Operating License Ho.
DPR-31 is hereby amended to read as follows:
E.
Steam Generator Ins ections 5.
In order to perform an inspection of the steam generat'ors, Unit No.
3 shall be brought to the cold shutdown condition within six equivalent months and seven weeks of operation from March 29, 1979 or at the next refueling shutdown, whichever occurs first, unless:
(1) an inspection of the
..team generators is performed within this period as a result of the requirements in 2, 3 and 4 above, or {2) an acceptable analysis of the susceptibility for stress corrosion cracking of tubing is submitted to explicitly justify continued operation of Unit Ho.
3 beyond the authorized period of operation.
Any analysis justifying continued operation must be submitted at least 45 days prior to the expiration date of the authorized period of operation.
For the prupose of'his requirement, equivalent operation is defined as operation with a primary coolant temperature greater than 350'F.
HRC approval shall be obtained before resuming power operation following this inspection.
3.
This'license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSIOH
- N:77~
A. Schwencer, Chief Operating Reactors Branch gl Division of Operating Reactors
Attachment:
Pages 1 through 5 of Operating License DPR-31 Date of Issuance:
September 26, 1979
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.
50 TO FACILITY OPERATING LICENSE NO'. DPR-31 DOCKET NO. 50-250 Replace the following pages of Facility Operating License No.
DPR-31 'with the attached pages as indicated.
The changed area in the license is indicated by a marginal line.
Remove Pa es 1
2 3
3a 4
Insert Pa es 1
2 3
5