Forwards Revised Page 2 of Integrated Leak Rate Test Rept
ML17338B199
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 10/16/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
L-79-289, NUDOCS 7910220255
Download: ML17338B199 (6)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:7910220255 DOC ~ DATE: 79/10/16 NOTARIZED:

NO

. DOCKET FACIL:50 250 Turkey Point Plant~

Unit 3i Florida Power and Light C

05000250 AUTH'PMg AUTHOR AFFILIATION UHRIGg R ~ E ~

F1 or ida Power L Light Co ~

RECIP ~ NAME RECIPIENT AFFILIATION DENTONsH ~ Ro Office of Nuc'lear Reactor Regulation

SUBJECT:

Forwards revised Page 2 of integrated leak rate test rept, DISTRIBUTION CODE':

A017S COPIFS RECEIVED:LTR + ENCL SIZE!

TITLE: Containment Leak Rate Testing Appendix J

N LQ ~

OTl vs

>> ~ ~

w~>>~~yew~wtaw~eemao RECIPIENT ID CODE/NAME" ACTION:

05 B

A"/

INTERNAL:

12 16 ENGR BR 18 PLANT SYS BR 20 EFLT TRT SYS 22 CONTMNT SYS EXTERNAL: 03 LPDR 24 ACRS

COPIES, LTTR ENCL 7

7 1

1 2

2 1

1 1

1 1

1 1

1 1

l6 16 RECIPIENT ID CODE/NAME LA O~~ ~ I 02 NRC PDR 10 TA/EDO 17 REAC SFTY BR 19 EEB 21 GELD 23 HUANGrY ~ ST 04 NSIC COPIES LTTR ENCL 1

0 1

1 1

1 1

1 1

1 1

1 1

1 1

OCl' 3 1979 TOTAl. NUMBER OF COPIES REQUIRED:

I TTR 39 ENCL 38

R 0

ga a

l C

J 3'

. BOX 629100, MIAMI,FL 33162 z>Qlliy<

~

FLORIDA POWER 4 LIGHTCOMPANY October 16, 1979 L-79-289 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S.

Nuclear Regulatory Commission llashington, D.

C.

20555 Dear Mr. Denton; Re:

Turkey Point Unit 3 Docket No. 50-250 Inte rated Leak Rate Test Re ort The subject report was forwarded to you on June 20, 1979 (L-79-171).

Since

then, we have revised page 2 of the report to bring Section III.B (Technical Data) into agreement with the Final Safety Analysis Report.

Twelve copies of the revised page are attached for use by your office.

Very truly yours, Robert E. Uhri g Vice President Advanced Systems 8, Technology REU/MAS/cph cc:

Mr. James P.

O'Rei lly, Region II Robert Lowenstein, Esquire y gy 0220 ~S 5 PEOPLE... SERVING PEOPLE

I

'l. LI.

TEST DATA SUiLiIARY A.

Plant Information Owner Plant Location Containment Type NSSS Supplier, Type Date Test Completed Florida Power and Light Company Turkey Point Plant, Unit 3 Homestead, Florida Prestressed, post-tensioned concrete Westinghouse, PWR March 20, 1979 Technical Data 2.

3.

Containment Net Free Air Volume Design Pressure Design Temperature 1,550,000 cu. ft.

59 psig 283 r 4.

Calculated Peak Accident

Pressure, Pa 50 psig Containment LLRT Average Temperature Limits 80 90 F

0 C.

6.

Test Calculated Peak Accident Temperature Results Type A Test 276. P 2.

Test Method Data Analysis Techniques Absolute Mass Point (per ANSX N274) and Total-Time (per BN-TOP-1) 3.

Test Pressure 4.

Maximum Allowable Leakage Rate, L

25 psig 0.1029%/day 5.

75% of L 0.0772%/day 6.

integrated Leakage Rate Test Results Leaka e Rate Prom Regres-sion Line (Lt )

%/day

't Upper 95%

Confidence Limit a.

Mass point analysis b.

Total-Time analysis 0.031 0.034 0 '33 0.060 7.

Verification Test Xmposed Leakage

Rate, Lo, %/day 0.103

(,h V