Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000250/LER-1981-005-01, /01T-0:on 810310,drain Header to Floor of Component Cooling Water Pump & Heat Exchanger Room Backed Up.Caused by Overflow of Laundry Water from Monitor Tank. Laundry Water Transfer Terminated + (17:41:07, 7 January 2025)
- 05000250/LER-1981-005, Forwards LER 81-005/01T-0 + (17:41:09, 7 January 2025)
- EPID:L-2017-LLR-0138 + (17:41:10, 7 January 2025)
- ML17340A967 + (17:41:11, 7 January 2025)
- 05000251/LER-1981-002-03, /03L-0:on 810214,boric Acid Flow in Normal Flowpath from Boric Acid Tanks Could Not Be Established & Low Temp Reading Found in Flowpath on 810217.Caused by Three Splices Needing Repair on Heat Tracing Circuits + (17:41:12, 7 January 2025)
- 05000251/LER-1981-002, Forwards LER 81-002/03L-0 + (17:41:14, 7 January 2025)
- L-81-139, Responds to IE Bulletin 81-01, Mechanical Snubbers. No Id Nuclear Corp Snubbers Found in safety-related Sys.Testing of Mechanical Snubbers on safety-related Sys to Be Completed by 810417 on Unit 3 & 820724 on Unit 4 + (17:41:15, 7 January 2025)
- L-MT-17-080, Submittal of Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan + (17:41:15, 7 January 2025)
- 05000251/LER-1981-003-03, /03L-0:on 810218,leak Discovered in Rcs.Caused by Cracked Weld Between Vent Valve Line & 4A Reactor Coolant Pump Seal Supply Line.Vent Line Cut & Rewelded to Seal Line. Mod Will Be Implemented + (17:41:18, 7 January 2025)
- 05000251/LER-1981-003, Forwards LER 81-003/03L-0 + (17:41:19, 7 January 2025)
- L-81-138, Responds to IE Bulletin 80-20,Revision 1, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Identifies Components & Number of Switches Used. Continuity Test Results Successful.Switches to Be Replaced + (17:41:20, 7 January 2025)
- L-81-153, Forwards Response to IE Bulletin 80-11, Masonry Wall Design. All Walls Have Been re-evaluated to Meet Intended Function Under Appropriate Loads & Load Combinations + (17:41:25, 7 January 2025)
- ML17340A954 + (17:41:27, 7 January 2025)
- ML17340A951 + (17:41:29, 7 January 2025)
- ML17340A944 + (17:41:31, 7 January 2025)
- ML17340A942 + (17:41:32, 7 January 2025)
- ML17340A941 + (17:41:33, 7 January 2025)
- ML17340A940 + (17:41:34, 7 January 2025)
- L-81-148, Forwards, Reactor Containment Bldg Integrated Leak Rate Test Type A,B & C Surveillance Test + (17:41:35, 7 January 2025)
- ML17340A937 + (17:41:36, 7 January 2025)
- ML17340A936 + (17:41:37, 7 January 2025)
- ML17340A934 + (17:41:38, 7 January 2025)
- ML17340A933 + (17:41:39, 7 January 2025)
- L-81-147, Informs That Emergency Operations Facility Conceptual Design Descriptions Will Be Provided by 810601.Requirement Re Min Staffing for Emergencies Will Be Difficult to Meet. Appropriate Personnel Do Not Live Close Enough to Plant + (17:41:40, 7 January 2025)
- L-81-149, Advises That 810605 Has Been Established as New Completion Date for Labyrinth Entrances for 4,160-volt Switchgear Rooms,Per Re Fire Protection + (17:41:41, 7 January 2025)
- L-81-143, Documents Review & Conclusions of Response to NUREG-0737, Item II.E.4.2 Re Containment Isolation Dependability.Any Reduction in Setpoint Would Require Replacement of Existing Switches + (17:41:43, 7 January 2025)
- ML17340A929 + (17:41:45, 7 January 2025)
- L-81-144, Application to Amend License DPR-31 Requesting Permission to Return Facility to Power Operation for Six Equivalent Full Power Months.Class III Amend Fee Encl + (17:41:46, 7 January 2025)
- 05000250/LER-1979-039-03, Foreign Matl Observed on as Found 3B Steam Generator Tubesheet Photographs.Caused by Piece of Unalloyed Plain Carbon Steel & Steam Generator Tube Plug Skirt.Sys to Monitor Startup Will Be Employed + (17:41:49, 7 January 2025)
- ML17340A922 + (17:41:50, 7 January 2025)
- ML17340A924 + (17:41:50, 7 January 2025)
- L-81-140, Forwards Nonradiological Environ Monitoring Rept,1980. Groundwater Monitoring Summary Rept for Jul 1980-June 1981 to Be Submitted by 810830 + (17:41:51, 7 January 2025)
- ML17340A919 + (17:41:55, 7 January 2025)
- ML17340A916 + (17:41:57, 7 January 2025)
- ML17340A912 + (17:41:57, 7 January 2025)
- L-81-110, Application for Amends to Licenses DPR-31 & DPR-41,App a, Addressing Operability & Surveillance of Facility Overpressure Mitigating Sys + (17:41:58, 7 January 2025)
- ML17340A906 + (17:42:01, 7 January 2025)
- L-81-108, Application for Amend of Licenses DPR-31 & 41 Changing License Contained in ,Re TMI-related Changes + (17:42:02, 7 January 2025)
- ML17340A903 + (17:42:07, 7 January 2025)
- ML17340A900 + (17:42:08, 7 January 2025)
- ML17340A901 + (17:42:08, 7 January 2025)
- L-81-109, Application to Amend Licenses DPR-31 & DPR-41 Revising Tech Spec 6.0 Re Administrative Controls + (17:42:09, 7 January 2025)
- ML17340A897 + (17:42:11, 7 January 2025)
- ML17340A896 + (17:42:14, 7 January 2025)
- ML17340A894 + (17:42:15, 7 January 2025)
- L-81-123, Requests Exemption from Certain Requirements of 10CFR50.48 & App R Re Extension of Submittal & Implementation Dates Re Fire Protection Program + (17:42:16, 7 January 2025)
- ML17340A889 + (17:42:21, 7 January 2025)
- ML17340A888 + (17:42:22, 7 January 2025)
- ML17340A887 + (17:42:23, 7 January 2025)
- ML17340A886 + (17:42:24, 7 January 2025)
- ML17340A885 + (17:42:25, 7 January 2025)