Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17341B230 + (17:24:02, 7 January 2025)
- ML17341B229 + (17:24:11, 7 January 2025)
- ML17341B228 + (17:24:13, 7 January 2025)
- ML17341B226 + (17:24:19, 7 January 2025)
- L-82-241, Submits Revised Schedules for Implementation of NUREG-0737, Items II.B.2,II.B.3 & II.F.1,per Generic Ltr 82-05 + (17:24:20, 7 January 2025)
- L-82-236, Forwards Final Radiological Progress Rept(5),810624- 820407 + (17:24:22, 7 January 2025)
- ML17341B224 + (17:24:22, 7 January 2025)
- L-82-240, Forwards Initial Response to NRC 820428 & 0503 Requests for Addl Info Re Control Room Habitability Requirements of NUREG-0737,Item III.D.3.4.Response to Questions 1 & 2 Will Be Submitted by 820716 + (17:24:24, 7 January 2025)
- L-82-235, Discusses 820518 Meeting Re App R Fire Protection Submittal Dates.Util Attempting to Provide Unit 1 App R Fire Protection Submittal Before 820701 to Provide Addl Review Time Prior to in of Industry Submittals on 820701 + (17:24:26, 7 January 2025)
- ML17341B220 + (17:24:26, 7 January 2025)
- ML17341B213 + (17:24:29, 7 January 2025)
- ML17341B212 + (17:24:30, 7 January 2025)
- ML17341B210 + (17:24:31, 7 January 2025)
- ML17341B205 + (17:24:32, 7 January 2025)
- L-82-225, Forwards Addl Info Requested 820329 Re Response to IE Bulletin 80-11, Masonry Wall Design + (17:24:33, 7 January 2025)
- ML17341B200 + (17:24:33, 7 January 2025)
- L-82-220, Forwards Response to 820409 Request for Addl Info Re Seismic Qualification of Auxiliary Feedwater Sys + (17:24:35, 7 January 2025)
- L-82-229, Forwards Emergency Operating Procedure 20002.2 on Loss of Secondary Coolant,Referred to in .(Ref IE Bulletin 80-04) + (17:24:37, 7 January 2025)
- ML17341B196 + (17:24:37, 7 January 2025)
- L-82-227, Advises That Response to Generic Ltr 82-10 Re post-TMI Requirements Will Be Submitted by 820702 + (17:24:39, 7 January 2025)
- L-82-207, Advises That Util 800613 & s Committed to Meeting Requirements of TMI Action Plan Item II.K.3.3, Reporting Safety & Relief Valve Failures & Challenges, in Response to NRC + (17:24:40, 7 January 2025)
- ML17341B190 + (17:24:42, 7 January 2025)
- RAIO-1217-57528, LLC Response to NRC Request for Additional Information No. 250 (Erai No. 9191) on the NuScale Design Certification Application + (17:24:43, 7 January 2025)
- L-82-221, Forwards Addl Info Re NUREG-0737,Item II.B.1, RCS Vents, in Response to NRC 820224 Request.One Oversize Drawing Encl. Aperture Card Is Available in PDR + (17:24:45, 7 January 2025)
- ML17341B183 + (17:24:47, 7 January 2025)
- L-82-214, Forwards Class III Fee for Proposed License Amend Re Boric Acid Transfer Pumps + (17:24:48, 7 January 2025)
- L-82-215, Responds to Discussing Operator Action During Postulated Main Steam Line Break.Submittal Justifies Time at Which Credit Taken for Operator Action in Analysis for IE Bulletin 82-04 + (17:24:49, 7 January 2025)
- L-82-211, Forwards Voltage Analysis of 120-volt Ac Sys in Response to Question 5 of 811022 Request,Per 820224 Commitment.Response to Re Adequacy of Electrical Distribution Sys Encl + (17:24:51, 7 January 2025)
- IR 05000395/2017405 + (17:24:53, 7 January 2025)
- ML17341B174 + (17:24:53, 7 January 2025)
- ML17341B173 + (17:24:54, 7 January 2025)
- ML17341B172 + (17:24:55, 7 January 2025)
- ML17341B171 + (17:24:56, 7 January 2025)
- ML17341B170 + (17:24:57, 7 January 2025)
- ML17341B168 + (17:24:58, 7 January 2025)
- ML17341B167 + (17:24:59, 7 January 2025)
- ML17341B166 + (17:24:59, 7 January 2025)
- ML17341B164 + (17:25:00, 7 January 2025)
- ML17341B163 + (17:25:02, 7 January 2025)
- L-82-193, Forwards Design Description of Undervoltage Protection Sys, Per 800818 Request.Plant Changes to Be Implemented During Oct 1983 Refueling Outage for Unit 3 & Oct 1982 Steam Generator Repair Outage for Unit 4 + (17:25:03, 7 January 2025)
- ML17341B160 + (17:25:03, 7 January 2025)
- ML17341B156 + (17:25:06, 7 January 2025)
- ML17341B155 + (17:25:07, 7 January 2025)
- ML17341B154 + (17:25:07, 7 January 2025)
- L-82-187, Application to Amend Licenses DPR-31 & DPR-41,changing Tech Spec 4.10 Requiring Individual in Communication W/ Control Room Be Stationed at Auxiliary Feedwater Area When Valves Are Manually Realigned + (17:25:08, 7 January 2025)
- L-82-180, Forwards Responses to NRC 800316 Questions Re NUREG-0737, Items II.F.1.4,II.F.1.5 & II.F.1.6 on Addl Accident Monitoring Instrumentation + (17:25:10, 7 January 2025)
- ML17341B143 + (17:25:10, 7 January 2025)
- L-82-179, Responds to NRC Requesting Addl Info Re Pressurized Thermal Shock + (17:25:12, 7 January 2025)
- L-82-136, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 20101 Re Duties of Emergency coordinator,20103 Re Classification of Emergencies & 20104 Re Emergency Roster + (17:25:14, 7 January 2025)
- ML17341B138 + (17:25:14, 7 January 2025)
- ML17341B134 + (17:25:20, 7 January 2025)