Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17352A323 + (14:03:02, 7 January 2025)
- ML17352A322 + (14:03:03, 7 January 2025)
- ML17352A321 + (14:03:05, 7 January 2025)
- ML17352A319 + (14:03:06, 7 January 2025)
- ML17352A317 + (14:03:07, 7 January 2025)
- Press Release-17-052, NRC Publishes Draft Environmental Assessment of Proposed Crow Butte Expansion + (14:03:08, 7 January 2025)
- L-93-268, Advises That Util Intends to Dissolve Safety Engineering Group by Year End to Eliminate Duplication in Effort + (14:03:09, 7 January 2025)
- L-93-287, Monthly Operating Repts for Oct 1993 for Turkey Point Units 3 & 4 + (14:03:11, 7 January 2025)
- ML17352A303 + (14:03:14, 7 January 2025)
- L-93-290, Annual 10CFR50.59 Rept on Changes Test & Experiments for 920701-930601 + (14:03:18, 7 January 2025)
- ML17352A300 + (14:03:22, 7 January 2025)
- IR 05000250/1993023 + (14:03:25, 7 January 2025)
- ML17352A291 + (14:03:27, 7 January 2025)
- IR 05000250/1993021 + (14:03:29, 7 January 2025)
- L-93-267, Provides 10CFR50.46, Acceptance Criteria for ECCS in Light Water Nuclear Power Reactors Annual Rept for CY93 + (14:03:30, 7 January 2025)
- ML17352A286 + (14:03:33, 7 January 2025)
- IR 05000250/1992013 + (14:03:35, 7 January 2025)
- IR 05000250/1993022 + (14:03:56, 7 January 2025)
- ML17352A281 + (14:03:59, 7 January 2025)
- ML17352A280 + (14:04:02, 7 January 2025)
- 05000250/LER-1993-006-02, :on 930930,reactor Trip Signal & Reactor Trip Breakers Opened.Caused by Faulty High Voltage Power Supply. Faulty Power Supply Replaced,Source Range Channel Recalibrated & Channel Returned to Svc + (14:04:07, 7 January 2025)
- L-93-248, Forwards Addl Info on Biometrics Access Control for Clarifications Re 930818 Request for Exemption from Certain Requirements of 10CFR73.55,including Details Re Changes to Physical Security Plans.W/O Subj Security Plans Details + (14:04:09, 7 January 2025)
- L-93-271, Forwards Operator Licensing Natl Exam Schedule,Consisting of Estimated Number of Candidates to Be Examined During Site Visits,Per GL 89-03 & Dates for Requalification Exams During FY94-97 + (14:04:15, 7 January 2025)
- L-93-273, Informs That Licensee Will Conduct Exercise of Plant Radiological Emergency Plan on 931215,in Cooperation W/State of Fl & County Emergency Response Agencies + (14:04:19, 7 January 2025)
- L-93-258, Monthly Operating Repts for Sept 1993 for Turkey Point,Units 3 & 4 + (14:04:23, 7 January 2025)
- L-93-249, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/93-21 & 50-251/93-21.C/As:licensee Revised Operating Procedures to Provide Better Direction on Sequential & Simultaneous Performance of Sections + (14:04:27, 7 January 2025)
- L-93-256, Provides Clarification Re Dissemination or Distribution of Info Contained in Final Rept of Plant Specific Seismic Adequacy Evaluation of St Lucie Unit 1, & ...Turkey Point Units 3 & 4.. + (14:04:32, 7 January 2025)
- L-93-230, Forwards Response to GL 89-10,Suppl 5, Inaccuracy of MOV Diagnostic Equipment. Revised Errors Associated W/Torque Switch Repeatability,As Specified in Limitorque Maint Update 92-02,incorporated in Plant MOV Diagnostic Test Procedure + (14:04:37, 7 January 2025)
- ML17352A264 + (14:04:40, 7 January 2025)
- L-93-241, Application for Amend to Licenses DPR-31 & DPR-41 Revising Surveillance Requirement 4.6.1.2a & Associated Bases to Conform w/NUREG-1431,Standard Ts,Westinghouse Plants,Rev 0 + (14:04:42, 7 January 2025)
- ML17352A261 + (14:04:45, 7 January 2025)
- L-93-242, Forwards Response to NRC RAI Resulting from 930625 Telcon Re Topical Rept NTH-TR-01, Retran Model Qualification - Decrease in Heat Removal by Secondary Sys + (14:04:47, 7 January 2025)
- L-93-245, Forwards Results of Turkey Point Confirmatory Measures Split Sample Analysis + (14:04:50, 7 January 2025)
- L-93-171, Responds to Info Requested by NRC During 930720 Meeting Re USI A-46,including Narrative Describing How Safe Shutdown Will Be Accomplished & Proprietary Flowchart W/Regard to Relay Functionality.Flowchart Withheld,Per 10CFR2.790 + (14:04:57, 7 January 2025)
- IR 05000250/1993016 + (14:05:06, 7 January 2025)
- ML17352A251 + (14:05:09, 7 January 2025)
- ML17352A250 + (14:05:14, 7 January 2025)
- ML17352A249 + (14:05:21, 7 January 2025)
- ML17352A246 + (14:05:23, 7 January 2025)
- ML17352A245 + (14:05:25, 7 January 2025)
- ML17352A244 + (14:05:28, 7 January 2025)
- L-93-197, Forwards Response to 930624 RAI to Support Technical Review of Util 10CFR50.59 Evaluation of RHR Check Valve Flaw + (14:05:31, 7 January 2025)
- L-93-234, Forwards Scope & Objectives for 1993 Annual Emergency Preparedness Exercise Scheduled to Be Conducted on 931215. Exercise Will Involve Participation of Local Emergency Response Agencies & State Emergency Response Personnel + (14:05:40, 7 January 2025)
- L-93-233, Monthly Operating Repts for Aug 1993 for Turkey Point,Units 3 & 4 + (14:05:48, 7 January 2025)
- L-93-221, Responds to NRC Ltr Re Violations Noted During Insp Rept 50-250/93-20.Corrective Actions:All Electrical Maint Dept Field Supervisors,Maint Engineers & Planners Have Attended Specification Overview Training Session + (14:05:54, 7 January 2025)
- ML17352A230 + (14:06:00, 7 January 2025)
- ML17352A228 + (14:06:04, 7 January 2025)
- ML17352A227 + (14:06:12, 7 January 2025)
- 05000251/LER-1993-003-03, :on 930816,Turbine Trip/Rt Occurred Due to Personnel Error in Which High Pressure Feedwater Heaters Were Not Returned to Svc Correctly.Counseled Involved Operators & Revised Procedure + (14:06:17, 7 January 2025)
- ML17352A224 + (14:06:24, 7 January 2025)
- ML17352A222 + (14:06:26, 7 January 2025)