Forwards Complete Copy W/Attachment 1 of Util Requesting Exemption from Certain Requirements of 10CFR73.55, Requirements for Physical Protection of Licensed Activities in Nuclear Power Plants..
ML17352A303
Person / Time
Site: Turkey Point, Saint Lucie  NextEra Energy icon.png
Issue date: 11/16/1993
From: Norris J, Raghavan L
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
TAC-M87316, TAC-M87317, TAC-M87318, TAC-M87319, NUDOCS 9312020092
Download: ML17352A303 (6)


Text

,IJ,R AKC0, p~

Mp0

~

4 0O I

0 Op

/p pN

++*++

UNITED STATES NUCLEAR REGULATORY COMMISStON WASHINGTON. D.C. 20555-0001 I'Joverber 16, 1993 Docket Nos. 50-250, 50-251 50-335, and 50-389 MEMORANDUM FOR:

Docket File FROM:

SUBJECT:

L. Raghavan, Project Manager Project Directorate II-2 Division of Reactor Projects I/II Jan A. Norris, Senio} Project Manager Project Directorate II-2 Division of Reactor Projects I/II FLORIDA POWER AND LIGHT COMPANY - TURKEY POINT UNITS 3 AND 4 AND ST.

LUCIE UNITS 1

AND 2 EXEMPTION REQUEST FROM CERTAIN REQUIREMENTS OF 10 CFR 73.55, REQUIREMENTS FOR PHYSICAL PROTECTION OF LICENSED ACTIVITIES IN NUCLEAR POWER PLANT REACTORS AGAINST RADIOLOGICAL SABOTAGE (TAC NOS.

H87318, M87319, H87316 AND H87317)

By letter dated October 13, 1993, Florida Power and Light Company (FPL or the licensee) requested exemption from certain requirements of Title 10 Code of Federal Regulations Part 73.55 "Requirements for physical protection of licensed activities in nuclear power plant reactors against radiological sabotage,"

to allow implementation of a hand geometry biometric system of site access control such that photograph identification badges can be taken offsite.

By administrative error, the October 13, 1993 letter was filed with the Public Document Rooms without including the Attachment 1 to the letter.

By this memorandum the October 13, 1993 letter with Attachment 1 is being forwarded to the PDRs.

It should be noted that the NRC has determined that Attachment 2 of the licensee's October 13, 1993 letter, which provided changes to Physical Security Plans, contains safeguards information.

Accordingly, Attachment 2 is not included.

Sincerely, J.

A.

orris,,Senior Project Manager ProJect Directorate II-2 Division of Reactor Projects I/II

Enclosure:

As stated cc w/o enclosure:

See next page

,93i2020092 93iiib 1; PDR <'; ADOCK 05000250 "F-PDR L. Raghavan, Project,Manager

-Project-.Directorate II-2'ivision of Reactor Projects,- I/II J

J me rlLECE~

~ ~

I 1,

'k 7 II

]>

~0k~

Nverber 16, 1993 ~

Docket Nos. 50-250, 50-251 50-335, and 50-389 MEMORANDUM FOR:

Docket File FROM:

L. Raghavan, Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Jan A. Norris, Senior Project Manager Project Directorate II-2 Division -'of Reactor Projects I/II DISTRIBUTION Q)nice't Q1,eg PD22 Reading File SVarga GLainas HBerkow LRaghavan JNorris ETana

SUBJECT:

FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNITS 3 AND 4 AND ST.

LUCIE UNITS 1

AND 2 EXEMPTION REQUEST FROM CERTAIN REQUIREMENTS OF 10 CFR 73.55, REQUIREMENTS FOR PHYSICAL PROTECTION OF LICENSED ACTIVITIES IN NUCLEAR POWER PLANT REACTORS AGAINST RADIOLOGICAL SABOTAGE (TAC NOS.

H87318, H87319, H87316 AND H87317)

By letter dated October 13, 1993, Florida Power and Light Company (FPL or the licensee) requested exemption from certain requirements of Title 10 Code of Federal Regulations Part 73.55 "Requirements for physical protection of l,icensed activities in nuclear power plant reactors against radiological sabotage,"

to allow implementation of a hand geometry biometric system of site access control such that photograph identification badges can be taken offsite.

By administrative error, the October 13, 1993 letter was filed with the Public Document Rooms without including the Attachment 1 to the letter.

By this memorandum the October 13, 1993 letter with Attachment 1 is being forwarded to the PDRs.

It should be noted that the NRC has determined that Attachment 2 of the licensee's October 13, 1993 letter, which provided changes to Physical Security Plans, contains safeguards information.

Accordingly, Attachment 2 is not included.

(Original Signed By)

J.

A. Norris, Senior Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Enclosure As stated cc w/o enclosure:

See next a

e Si

erely, L. Raghavan, P

ject anager Project Directorate II-2 Division of Reactor Projects I/II Office Name LA:PDI I-2 PH: PDI I-2 ETana ~<

LRa havan PH,:

I ~2 No s

PD:PDI -2 HBed

~~ /%93 Date DOCUMENT NAME:

TP87318.MEH U

93 II /lk/93 6/93

ll i>>p,;

C I

Florida Power and Light Co ny CG:

Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature ill West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.

Hwy AlA Jensen

Beach, Florida 34957 Mr. Joe Myers, Director Div. of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Harold F. Reis, Esq.

Newman

& Holtzinger 1615 L Street, N.W.

Washington, DC 20036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. Thomas F. Plunkett, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Mr. Thomas R.L. Kindred County Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering, Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 C. L. Burton Plant General Manager St. Lucie Nuclear Plant P.O.

Box 128 Ft. Pierce, Florida 34954-0128 Mr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Regional Administrator, RII U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Mr. H. N. Paduano, Manager Licensing

& Special Projects Florida Power and Light Company P.O.

Box 14000 Juno

Beach, Florida 33408-0420 Mr. J.

H. Goldberg President Nuclear Division Florida Power and Light Company P.O.

Box 14000 Juno

Beach, Florida 33408-0420 Mr. D. A. Sager Vice President St.

Lucie Nuclear Plant P.O.

Box 128 Ft. Pierce, FL 34954-0218 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission P.O.

Box 1448 Homestead, Florida 33090 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Joaquin Avino, County Manager of Metropolitan Dade County ill NW 1st Street, 29th Floor Miami, Florida 33128