- 05000260/LER-1980-023-03, /03L-0:on 800607,during Normal operation,2A Reactor Recirculation Motor Generator Set Tripped Due to Generator Stator Temp High Relay Actuation.Probable Cause Was Loose Wire Caused by Vibration + (09:09:44, 7 January 2025)
- 05000260/LER-1980-023, Forwards LER 80-023/03L-0 + (09:09:46, 7 January 2025)
- 05000260/LER-1980-025-01, /01T-0:on 800617,during Normal Operation Discovered That Spare Dresser Industries Safety Valve Had Guide W/Cracks.Caused During Initial Pouring of Casting & Subsequent Cooling.Addl Valves Will Be Inspected for Cracks + (09:09:48, 7 January 2025)
- 05000260/LER-1980-025, Forwards LER 80-025/01T-0 + (09:09:50, 7 January 2025)
- ML18025A938 + (09:09:51, 7 January 2025)
- 05000296/LER-1980-019-03, /03L-0:on 800527,during Normal Operation, Discovered Drywell Sump Flow Transmitter FT-77-16 Had Output Signal Shift.Cause Unknown.Transmitter Replaced & Instrument Loop Calibr + (09:09:53, 7 January 2025)
- 05000296/LER-1980-019, Forwards LER 80-019/03L-0 + (09:09:55, 7 January 2025)
- 05000296/LER-1980-018-03, /03L-0:on 800519,reactor Low Pressure Switch PS-3-74B SW 1,found Out of Tolerance.Caused by Instrument Setpoint Drift.Barton 288 Pressure Switch Inspected,Recalibr & Functionally Tested for Repeatability + (09:10:00, 7 January 2025)
- 05000296/LER-1980-018, Forwards LER 80-018/03L-0 + (09:10:02, 7 January 2025)
- 05000296/LER-1980-013-03, /03L-0:on 800517,LIS-3-56B Switch 2 Failed to Operate.Cause Attributed to Stuck Switch Contacts.Leaf Switches Inside Level Indicating Switch Replaced & Checked for Proper Setpoint & Repeatability + (09:10:04, 7 January 2025)
- 05000296/LER-1980-013, Forwards LER 80-013/03L-0 + (09:10:06, 7 January 2025)
- 05000296/LER-1980-016-03, /03L-0:on 800513,following Completion of Flow Test on Diesel Generator Heat Exchanger 3D,cooling Water Found Inadequate Per Tech Spec 3.5.B.2.Apparently Caused by Restriction in Cooling Water Piping.Water Lines Flushed + (09:10:08, 7 January 2025)
- 05000296/LER-1980-016, Forwards LER 80-016/03L-0 + (09:10:11, 7 January 2025)
- 05000296/LER-1980-014-03, /03L-0:on 800512,during Normal Operation,Reactor Core Isolation Cooling Tripped on Overspeed Due to Loss of Speed Control.Caused by Diode in Egm Box Failure Due to End of Life.Egm Box Replaced & Calibr + (09:10:14, 7 January 2025)
- 05000296/LER-1980-014, Forwards LER 80-014/03L-0 + (09:10:15, 7 January 2025)
- 05000296/LER-1980-015-03, /03L-0:on 800512,3B RHR Pump Cooling Water Flow Determined Inadequate Per TS 3.5.B.1(2) & 3.5.BB.5.Caused by Apparent Restriction in Cooling Water Piping.Exchanger Removed & Flushed + (09:10:17, 7 January 2025)
- ML18025A915 + (09:10:20, 7 January 2025)
- 05000296/LER-1980-015, Forwards LER 80-015/03L-0 + (09:10:21, 7 January 2025)
- ML18025A911 + (09:10:23, 7 January 2025)
- 05000260/LER-1980-021-03, /03L-0:on 800506,during Routine Shutdown, Particulate Channel 2-RR-90-249 Was Erratic & Declared Inoperable.Caused by Failure of Recorder Amplifier.Amplifier Replaced.Failure Attributed to Normal Aging + (09:10:24, 7 January 2025)
- 05000260/LER-1980-021, Forwards LER 80-021/03L-0 + (09:10:36, 7 January 2025)
- 05000296/LER-1980-012-03, /03L-0:on 800509,while Performing SI 4.2.A-3,LIS- 3-56a Switch 2 & LIS-3-56b Switch 2 Failed to Operate.Caused by Stuck Switch Contacts.Switch Contacts Cleaned & Checked for Proper Setpoint + (09:10:38, 7 January 2025)
- 05000296/LER-1980-012, Forwards LER 80-012/03L-0 + (09:10:41, 7 January 2025)
- 05000296/LER-1980-017-03, /03L-0:on 800404,after Running SI 4.11.c.3 & .4, Last Page of SI Was Missing.Last Page Had Not Been Performed 3 of Last 4 Months,So One Fire Protection Zone Not Tested Monthly.Caused by Misplacement.Page Replaced + (09:10:45, 7 January 2025)
- 05000296/LER-1980-017, Forwards LER 80-017/03L-0 + (09:10:46, 7 January 2025)
- ML18025A901 + (09:10:48, 7 January 2025)
- ML18025A900 + (09:10:49, 7 January 2025)
- ML18025A899 + (09:10:50, 7 January 2025)
- 05000260/LER-1980-020-03, /03L-0:on 800421,high Pressure Switch PS-3-22D Found Exceeding Setpoint During Normal Operation.Caused by Setpoint Drift.Barksdale BST-A12SS Switch Inspected,Calibr & Functionally Tested + (09:10:51, 7 January 2025)
- 05000260/LER-1980-020, Forwards LER 80-020/03L-0 + (09:10:55, 7 January 2025)
- ML18025A887 + (09:10:56, 7 January 2025)
- IR 05000259/1980009 + (09:10:58, 7 January 2025)
- ML18025A882 + (09:11:03, 7 January 2025)
- ML18025A883 + (09:11:03, 7 January 2025)
- IR 05000259/1980006 + (09:11:05, 7 January 2025)
- ML18025A877 + (09:11:07, 7 January 2025)
- ML18025A879 + (09:11:07, 7 January 2025)
- ML18025A873 + (09:11:08, 7 January 2025)
- IR 05000334/2017004 + (09:11:13, 7 January 2025)
- ML18025A868 + (09:11:14, 7 January 2025)
- 05000296/LER-1980-011-03, /03L-0:on 800417,during Normal Operation,Reactor Water Cleanup Isolation Valve Failed to Close W/Motor.Caused by Failed Wire Due to Work Hardening.Procedure for Limit Switch Adjustment Has Been Revised + (09:11:15, 7 January 2025)
- IR 05000259/1979048 + (09:11:17, 7 January 2025)
- ML18025A863 + (09:11:18, 7 January 2025)
- ML18025A862 + (09:11:19, 7 January 2025)
- ML18025A861 + (09:11:20, 7 January 2025)
- ML18025A859 + (09:11:21, 7 January 2025)
- ML18025A858 + (09:11:22, 7 January 2025)
- ML18025A857 + (09:11:22, 7 January 2025)
- 05000296/LER-1980-010-03, /03L-0:on 800410,while Performing S.I. 4.2.A-3, LIS-3-56A SW1 & 2 & LIS-3-56B SW2 Failed to Operate.Caused by Dirty Contacts.Contacts Were Cleaned & Switches Checked for Proper Setpoint & Repeatability + (09:11:24, 7 January 2025)
- 05000296/LER-1980-010, Forwards LER 80-010/03L-0 + (09:11:26, 7 January 2025)