ML18025A879

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-259/80-06,50-260/80-06 & 50-296/80-06 on 800114-0201.No Noncompliance Noted
ML18025A879
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/09/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris A
TENNESSEE VALLEY AUTHORITY
Shared Package
ML18025A880 List:
References
NUDOCS 8005270159
Download: ML18025A879 (4)


See also: IR 05000259/1980006

Text

~8 Afoo~

+o

~o

II

Cy

o

I

C

O

r~

O~

+a*++

In Reply Refer To:

RII:RFS

50-259/80"6

50"260/80-6

50-296/80"6

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTrr N.W., SUITE 3100

ATLANTA,GEORGIA 30303

APR 0 91980

. +c -W~

Tennessee

Valley Authority

ATTN:

H.

G. Parris

Manager of Power

500A Chestnut Street

Tower II

Chattanooga,

TN

37401

Gentlemen:

This refers to the inspection

conducted

by R. F. Sullivan of this office on

January

14 through February

1,

1980 of activities authorized by NRC License Nos.

DPR-33,

DPR-52 and DPR-68 for the Browns Ferry facility, and to the discussion

of our findings held with H. L. Abercrombie or J. L. Harness at the conclusion

of the inspection.

Areas

examined during the inspection

and our findings are discussed in the

enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters

and unresolved

items.

The status of these

items is discussed

in the enclosed

report.

In accordance

with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include

a full statement

of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document

Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

g.c,

Enclosures:

(See

Page 2)

R.

C.

ewis, Acting Chief

Reactor Operations

and Nuclear

Support Branch

Noossga L~ l

Tennessee

Ualley Authority

APR

O 81980

Enclosures:

Inspection Report Nos. 50-259/80-6,

50-260/80-6

and 50-296/80-6

cc w/encl:

H. I,. Abercrombie

Plant Superintendent

P. 0.

Box 2000

Decatur,

AL

35602

R. E. Rogers, Project Engineer

400 Chestnut Street

Tower II

Chattanooga,

TN

37401

H. N. Culver

249-A HBB

400 Commerce

Avenue

Knoxville, TN

37902

0